MoA 2010 – RPC project G. Iaselli P. Paolucci
2010: Unique RPC project composed by: Barrel, Endcap and Upgrade M&O 2010 Peking University3 Korea4 India3 Ghent - Belgium2 Uniandes2 Pakistan3 CERN0 TOTALE ENDCAP170,40 Bari8 LNF3 Napoli4 Pavia4 Sofia Univ4 Sofia INRE3 TOTALE BARREL260,60 TOTALE RPC 43
MoA 2010 schema for RPC project Run – 10 monthsshut-down 2 monthRun – 10 monthsshut-down 2 month FTE needed months Detector chamber electronics 0,524 services Elect. & DAQ Power system DCS-DSS TTU 0102 XDAQ 0, Software Raw Data/DQM Reconstructed Prompt Analysys-Run valid TTU 0,40,641,277,2 Operation P5 shift CAF shift Shift leader Managment LV2 and LV Up Scope Simulation 0,3 30,6 R&D 0,6 61,2 Chamber production Front-end electronic 0,5 51 Trigger electronic 0,5 5146,8 TOTALE months22, (268)
Conclusions After the 2009 exercise we were able to improve our estimation and we increased the RPC MM from 208 to 268 (increase of 30%) + 47 (upgrade) RPC project FTE is 43, almost stable – But barrel is going down (2 Pavia PhD left + 3 Napoli/Bari without any position)