HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
ROLE-PLAY OVERLAP. You are talking about films For help with the vocab, click herehere Listen to the question and reply J’aime les films d’action Say.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
TDC2/TCC2 consolidation EATM 15/07/2014. EN/EL – DC and control cable identification and cut completed – Old light removal in TDC2 – New AUG installed.
EN-EL Organisation and Needs for LIU project Mar 4, 2015 Daniel RICCI, Jerome PIERLOT Section Leaders Cabling and Low Voltage, on behalf of the EN-EL group.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
Construction and Installation of the CLIC Experimental Area
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.

Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Injector De-cabling Project Enlarged meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
Alignment (results by Jo van den Brand) Preparing IP 8 Velo arrived at IP 8 Preparing UXA C3 Installation transfer lines for the cooling system Next steps.
IMPACTS OF INSTALLING THE REFERENCE MAGNET PLACEMENT IN B december 2014 Fulvio Boattini & Natacha Lopez Hernandez.
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
R2E Status Report 18 th LSC Meeting, August 18 th 2013 CERN Radiation 2 Electronics (R2E) Project 18 th LSC Meeting August 16 th 2013 R2E Status Report.
Injector De-cabling Project Enlarged meeting # E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson 17 September 2015.
EN-CV interventions during YETS
NA YETS: schedule week by week S. Evrard.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
ELENA Project GBAR Experimental area L ayout / time scales / questions F. Butin / ELENA collaboration.
R2E relocation & shielding activities Anne Laure Perrot EN/MEF- LE R2E project meeting, 23 rd October 2012.
Update on the Laser Beam Line
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
ICL 26/05/2010 Relocation of electronics at Pt5 Summary of week 22 + roadmap Contributions from GS-SEM, EN-MEF, EN-EL, EN-CV, BE-ASR, TE-MPE, PH-CMX, TE-EPC.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Layout Experimental hall Final status (?) 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling.
R2E Point 5 mini safe room cooling / ventilation A. L. Perrot, 30 th April 2013.
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
Injectors & LHC report K. Foraz on behalf of OSS members 01/11/13LSC - EN-MEF-OSS1.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
ACS news RF cabling campaign: DONE Final tests cavity tuning motor (ctrl): in progress recabling software upgrade Water cooling: ADT static pressure test:
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
ELENA installation progress F. Butin / ELENA collaboration.
Installation at Isolde (and costs) TSR at Isolde workshop CERN, 29/30 October 2012 Isolde Erwin Siesling.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
Linac 4 Faraday cage P. Baudrenghien , D. Stellfeld BE/RF
EHN1 Extension planning
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
BA6 – crab cavity activities in EYETS
EXTENSION ELENA = BUILDING 193 Status of integration
Budget specification EHN1 Extension: Infrastructure (WG2)
CE Status: Activities executed until 03/08 and ongoing
News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek
EN-HE L2 – PS – PSB – TT2 works during YETS
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
ACS news Circulator TCU: control tests in progress All cavity racks
Experimental Areas – LS2 planning
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
East Hall under construction
SPS 2, 3, 4 and 6 during W D.MCFARLANE EN-ACE-OSS 12/06/2019.
BA6. BA6 Sprinkler Station Structure Sprinkler Station Structure The metal sheet has been added for being able to install the.
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

ELENA Installation follow-up 21/05/2015 Worksite follow-up

EN-EL-CF works: – 3 racks to be installed (Imply the relocation of the AUG) – Relocation of cables on the cable trays to be done Worksite follow-up

EN-EL-BT works: Nouvel ERD en place : Câblage a réaliser la semaine prochaine AUG a réinstaller une fois les 3 derniers racks en place Semaine prochaine : ajout de terre la semaine prochaine pour rack cage faraday Raccord des racks au nouvel ERD à prévoir : Worksite follow-up

GS-SE Works : Worksite follow-up

GS-SE Works : Worksite follow-up

Cooling network for ELENA (193) : – Installation is about to finish : One last “piquage” for GBAR... – X-ray inspection (by night) are done and showed very good result. Pressure tests will be done during the coming weeks (No impact on the worksite)

Worksite follow-up General information : Metallic waste to be evacuated, action EN-EL EN-EL-BT Discussions on-going for the reinstallation of the crane Dismantling activities for ELENA will be finished very soon : Wood and metallic skip will be evacuated in the coming weeks Cables to be removed

Activities for the week 19-20: – Survey marking – T. Dobers (EN-MEF) – Cleaning of GBAR area – E. Harrouch (EN-MEF) – Dismantling of the actual rack platform – Daniel Parchet (GS-SE) (postponed to next week) – Completion of the lateral false floor – Daniel Parchet (GS-SE) (postponed to next week) – ELENA Cooling Network installation - F. Moro (EN- CV) – EN-EL-BT Works – R. Necca/M. Rigollet(EN-EL) Worksite follow-up

Activities for the week 21: – Survey marking (LNI, LNS and LNE00) – T. Dobers (EN- MEF) – Cleaning of GBAR area – E. Harrouch (EN-MEF) – Completion of platform modifications – Daniel Parchet (GS-SE) (postponed to next week) – ELENA Cooling Network installation - F. Moro (EN-CV) – 3 Rack installation – P. Burdelski (EN-EL) – EN-EL-BT Works – R. Necca/M. Rigollet(EN-EL) – Drilling by EN-MEF-SI for mechanical support? – A. Kolehmainen (EN-MME) Worksite follow-up