3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:

Slides:



Advertisements
Similar presentations
LHCb Alignment 12 th April 2007 S. Viret Coseners Forum « LHC Startup » 1. Introduction 2. The alignment challenge 3. Conclusions.
Advertisements

IBL Insertable B-Layer
IBL G. Darbo – INFN / Genova Roma, 5 September 2012 o IBL Stato e Richieste 2013 Riunione ATLAS / INFN Referee, 5 September 2012 G. Darbo – INFN.
1 of 17 LUKAS PÜLLEN New prototypes for components of a control system for the new ATLAS pixel detector at the HL-LHC New prototypes for components of.
ATLAS Pixel Detector Upgrade: IBL – Insertable B-Layer
Module design for B-layer replacement V.1. Bare Module dimensions mm Active area mm mm Footprint mm stack 200um chip 20um bumps.
LHCC – ATLAS IBL G. Darbo - INFN / Genova LHCC, 16 February 2009 o ATLAS Insertable B-Layer (IBL) LHCC Upgrade Review CERN, February 16, 2009 G. Darbo.
HV-CMOS Hybridization
Ecole micro-électronique, La londe-les-maures, 14 oct 2009 Pixel Hybride 3-D en techno 0.13µm pour SLHC/ATLAS P. Pangaud S. Godiot a, M. Barbero b, B.
Progress with the 3T Demonstrator Proposal A.Marchioro CERN April 2010.
ITk Kick-off meeting, 4th November 2014Vaclav Vrba / Zdenek Dolezal / Miroslav Havranek 1 Participating institutions: Institute of Physics, Academy of.
Institut für Verbundwerkstoffe GmbH Erwin-Schrödinger-Str Kaiserslautern Germany 1© Institut für Verbundwerkstoffe GmbH, N.
2x2 module & stave layouts. 2 options “Small chip” “Big chip” Boundary between “small” and “big” is determined by the 6” sensor wafer layout that must.
31 août 2011 Didier Laporte – LPNHE Paris 1 IBL Integration Stave Review Université de Genève.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March 2010 o IBL interim-MoU Annexes Pixel Extended Institution Board CERN, March 1 st, 2010 NCP.
Update on ATLAS IBL G. Darbo – INFN / Genova LHCC, 22 September 2009 o Update on ATLAS insertable B-layer LHCC Upgrade session CERN, September, 22 nd 2009.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
ATLAS POH.P, G.D12/5/2009 IBL Update H. Pernegger, G. Darbo (PO 12/5/09) Organization and WG coordinator Schedule Decision Items Organization Tools & Meetings.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
IBL Slides G. Darbo – INFN / Genova CSN1, 22 November 2010 o IBL Spare Slides Commissione I – 22 Nov 2010 G. Darbo - INFN / Genova.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
Towards a TDR for the IBL G. Darbo - INFN / Genova AW, 24 February 2009 o Towards a TDR for the IBL ATLAS Upgrade Week CERN, 24 February 2009 Session:
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
M. Gilchriese ATLAS Upgrade Introduction January 2008.
IBL MoU G. Darbo – INFN / Genova 24 April 2010 o IBL MoU ATLAS Upgrade Week DESY, April 24 th 2010 M. Nordberg, M. Nessi, C. Gößling, H. Pernegger Presented.
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
IBL – Status & Plans G. Darbo - INFN / Genova ID GEN, 28 November 2008 o Insertable B-Layer Status & Plans ATLAS Inner Detector General Meeting CERN, 28.
IBL Project Status G. Darbo – INFN / Genova AW, 9 October 2009 o Insertable B-layer Project Status ATLAS Week Barcelona, October, G. Darbo - INFN.
IBL MoU G. Darbo – INFN / Genova 17 April 2010 o IBL MoU Contribution prepared for Marzio’s talk at April RRB G. Darbo - INFN / Genova.
ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July 2009 o ATLAS Preparations for LHC Phase-I Upgrade ATLAS Week CERN,
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July 2004 ATLAS Pixel at SLHC G. Darbo - INFN / Genova Talk overview: A table with different High.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Update on ATLAS IBL G. Darbo – INFN / Genova LHCC, 22 September 2009 o Update on ATLAS insertable B-layer LHCC Upgrade session CERN, September, 22 nd 2009.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
ATLAS FP TRACKER PLANS Steve Watts School of Physics and Astronomy University of Manchester Well defined design in the FP420 Design Report Based on the.
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
ATLAS micromegas activities (MAMMA)
IBL - Opening G. Darbo - INFN / Genova AW, 25 February 2009 o IBL Introduction & Project Organization ATLAS Upgrade Week CERN, 25 February 2009 Session:
October RRB G. Darbo & H. Pernegger RRB – October 2010 o October RRB Slides for Marzio’s RRB talk CERN, October, 11 th 2010 G. Darbo & H. Pernegger.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July 2009 o IBL kick off meeting summary and issues ATLAS Upgrade Project Office.
15/09/20111 ATLAS IBL sensor qualification Jens Weingarten for the ATLAS IBL Collaboration (2 nd Institute Of Physics, Georg-August-Universität Göttingen)
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
ATLAS Upgrade Plans ATLAS Hardware – Challenges and Opportunities Norwegian CERN “Town Meeting” Bergen
IBL TDR G. Darbo / INFN Genova ATLAS CB – October 2010 o TDR of Insertable B-layer ATLAS CB, October 8 th 2010 G. Darbo / INFN - Genova Indico agenda page:
ATLAS ITk - Activities Common Mechanics group (Lukasz Zwalinski, Paolo Petagna, … ) Plant →PP1 DEMO & BABY DEMO 14/03/2016C. Rossi - INFN Genova1 Detector.
IBL Progress D. Ferrère for the IBL community LHCC Upgrade Session – June 14 th 2011 Detailed progress was reported at the IBL General meeting, June 8-10.
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March 2011 o IBL ATLAS Italia / Referee CERN, March 2 nd 2010 G. Darbo – C. Meroni INFN / GE – MI Agenda:
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
The ATLAS IBL Project – 5 th Trento Workshop G. Darbo – INFN / Genova Manchester, February 2010 o The ATLAS IBL Project The 5 th "Trento" Workshop.
The ATLAS Insertable B-Layer Detector (IBL) F. Hügging on behalf of the ATLAS IBL collaboration Pixel th International Workshop on Semiconductor.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
ATLAS Pixel Upgrade G. Darbo - INFN / Genova LHCC- CERN 1/76/2008 o Pixel/B-layer Developments LHCC Upgrade Session CERN, 1 / 7 / 2008 G. Darbo - INFN.
Manchester, 24/02/2010 G.-F. Dalla Betta The common floor-plan of the ATLAS IBL 3D sensor prototypes Gian-Franco Dalla Betta (Univ. Trento and INFN) for.
Sensors Pixel dimension 300 x 300 μm2 Standard p-in-n sensors
IBL project for DT Science-Techno Tea
IBL Technical Aspects H. Pernegger / CERN.
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
WP9 ITS Mechanics and Cooling
ATLAS Upgrade Phase I & II Overview, IBL & R&D Tracker
WG4 – Progress report R. Santoro and A. Tauro.
Communications Share Point Collaborative WS:
9/20/2018 CHIPP Meeting 10 September 2008 Slides for use by Sven for ATLAS talk DPNC Geneva 10 September 2008.
Update on ATLAS insertable B-layer
Presentation transcript:

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June IBL Organization The IBL (Insertable B-Layer) is an ATLAS Upgrade project: It will deliver a fourth pixel layer, including a new beam-pipe, to the Inner Detector When delivered, it will become a part of the Pixel Detector and of the Inner Detector and the organization will be absorbed into the Pixel & ID Module WG IBL MB (Management Board) IBL MB (Management Board) Stave WG Stave WG I&I WG I&I WG Off-det WG Off-det WG IBL IB (Institute Board) IBL IB (Institute Board) Pixel Institutes in IBL Pixel Institutes in IBL New Institutes in IBL New Institutes in IBL ATLAS UPO ATLAS UPO ATLAS UPGRADE IBL IBL PL IBL TC

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June Management Board (MB) Module WG (2 coordinators) FE-I4 Sensors Bump-Bonding Modules Test & QC Irradiation Module WG (2 coordinators) FE-I4 Sensors Bump-Bonding Modules Test & QC Irradiation Stave WG (1 Phys + 1 Eng.) Staves Cooling Design & Stave Thermal Management HDI Internal Services Loaded Stave Test & QC Stave WG (1 Phys + 1 Eng.) Staves Cooling Design & Stave Thermal Management HDI Internal Services Loaded Stave Test & QC IBL Integr.-Install. (2 Eng.) Stave Integration Global Sup. Beam Pipe (BP) Ext.services inst. IBL+BP Installation Cooling Plant Test & QC IBL Integr.-Install. (2 Eng.) Stave Integration Global Sup. Beam Pipe (BP) Ext.services inst. IBL+BP Installation Cooling Plant Test & QC Off-detector (1 Phys + 1 E.Eng.) Power DCS ROD Opto-link Ext.serv.design/proc. Test Beam System Test Off-detector (1 Phys + 1 E.Eng.) Power DCS ROD Opto-link Ext.serv.design/proc. Test Beam System Test IBL Management Board Membership: IBL PL + IBL TC 2 coordinators from each WG Plus extra members IBL Management Board Membership: IBL PL + IBL TC 2 coordinators from each WG Plus extra members Ad-interim membership IBL Project Leader: G. Darbo IBL Technical Coordinator: H. Pernegger Module WG (2 Physicists): F. Hügging & M. Garcia- Sciveres Stave WG (1 Phy. + 1 M.E.): O. Rohne + D. Giugni IBL Assembly & Installation WG (2 M.E. initially, a Phy. Later): N. Hartman + R. Vuillermet Off-detector WG (1 Phy. + 1 E.E.): T. Flick + S. Débieux Extra members: Ex officio: Upgrade Coordinator (N. Hessey), PO Chair (M. Nessi), Pixel PL (B. Di Girolamo), ID PL (P. Wells), Pixel Chair (C. Gößling) Offline liaison Pixel Off-line coordinator: A. Andreazza TDR editor (temporary): K. Einsweiler

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June Ref: N. Hartman: Single Stave Layouts Several layouts under study: 14 staves at R min =~3.2 cm TurbineInverted Rail Space Sensor

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June Ref: N. Hartman: BiStave Layouts BiturbineCastellated Sensor

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June Frontend Chip - FE-I4 FE-I4 Status Prototype blocks in MPW (MOSIS) submitted 3/2008, measurements, irradiation Design review (3/2009): Design Technical Issues on full scale design FE-I4 Collaboration meeting 1/7/2009 Foreseen complete design review after Summer and submission later this year. 7.6mm 8mmactive 2.8mm FE-I3 74% active 16.8mm 20.2mm ~2mm ~200 μ m FE-I4 ~89% Chartered reticule (24 x 32) IBM reticule ~19 mm New FE-I4 Pixel size = 250 x 50 µm 2 Pixels = 80 x 336 Technology = 0.13µm Power = 0.5 W/cm 2 FE-I3

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June FE-I4 Review & Collaboration FE-I4 – Design Technical Issue Review March 2 nd, Review agenda page:

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June Modules & Stave Arrangement Two module options: Single chip modules abut one against the next Small sensor type: like 3D, active edge Multi chip modules: chip look the same if using multi-chip modules As present sensor size (~2xFE-I4) : like planar n-on-n assuming no Z-shingling, no space. W-bond pads

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June Requirements - Fluence Requirements discussed in previous meetings New simulation of n fluences as input for the IBL design (see box) Other requirements are: IBL design Peak Luminosity = 3x10 34, Integrated Luminosity seen by IBL = 550 fb -1 Fit made for 2 < r < 20 cm for L=1000fb -1 Gives for 3.7 cm (550 fb -1 ): 1MeV =2.4x10 15 (1.2 MGy) Safety factors not included in the computation (pp event generator: 30%, damage factor for 1 MeV fluences: 50%) Ref. Ian Dawson - AUW

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June Sensors - Time line IBL project started now: TDR March 2010 – sensor option not decided before FE-I4.v1 prototyping FE-I4.v1 submitted (earliest) 15/10/2009 – Wafer back 31/4/2010 FE-I4.v1 prototype modules and testing – second half 2010 Sensor decision on FE-I3 and FE-I4.v1 prototypes End of 2010 Sensor production and testing 8 months production assumed. Testing could last 4 months after end production. Production starts beginning 2011.

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June How Many 3D Sensor Wafers For IBL we need: 14 staves (+6 spares) 32 FE-I4 (3D sensors) Total need = 640 single FE-I4 tiles = 54 Wafer If we consider yields: Sensor (0.5) Bump Bonding Module ~ 150÷200 wafer for whole IBL 4 Wafer – Fits 12 FE-I4

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June Beam-pipe - Layout Beam-pipe radius can be reduced by at least 4mm On-site survey has shown that cavern floor is stable (~1mm respect 9.8mm foreseen) See LEB (LHC Experimental Beam-pipes) WG – 5/3/2009: Smaller beam-pipe Layout options Better physics performance obtained with reverse turbine layout -sensor facing beam-pipe – cooling redundancy (two cooling pipes) for beam-pipe bake-out 1 mm

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June Material Budget Physics performance low material budget Strategy for reducing X 0 : carbon foam, carbon fiber (CF) cooling pipe, CO 2 cooling,… Omega Carbon foam Epoxy Sensor R/O chips Flex Cooling pipe (Al) Cooling fluid (C3F8) General total Total structure Structure+cool. Fluid Omega Carbon foam Epoxy Sensor R/O chips Flex Cooling pipe (CF) Cooling fluid General total Total structure Structure + cool. Fluid X 0 - Ti cooling pipe option X 0 - CF cooling pipe option

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June Inner Tracker R&D Status – November 2008 Approved by Executive Board EoI, Proposal presented to USG Pixel Strips Inner Detector

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June Calorimeter, Muon & Other R&D Status – November 2008 Approved by Executive Board EoI, Proposal presented to USG Calorimeter Muon Trigger, Elec, …