Utility Scale Arc Flash Analysis using CAPE System Simulator.

Slides:



Advertisements
Similar presentations
Subcontractor Electrical Safety & NFPA 70E
Advertisements

Arsalan A Rahim EED, UET Lahore. The Edit Mode is used to create a new case or to modify existing cases. In Edit Mode: Create a new case Create a.
Murray State University
1 Building a New Electric World How can your LV electrical installation be rapidly designed and optimized?
Announcements Be reading Chapters 9 and 10 HW 8 is due now.
Software Quality Assurance Plan
Microprocessor-Based Relays: Implementation, Conflicts, and Corrective Actions Steven V. Deases AEP – Station Engineer.
ARC FLASH ANALYSIS.
Arc Flash Energy & Protection Presented by EWB Engineering (Electrical Engineers)
Team Members: Cliff Clark, Gary Hollingshead, and Elizabeth Reese 1 TEAM FAULT FINDERS SENIOR DESIGN REVIEW Sponsors: Idaho Power Others Involved: Schweitzer.
Chapter 3: System design. System design Creating system components Three primary components – designing data structure and content – create software –
Computers: Tools for an Information Age
Electrical Safety Training
Reducing Arc Flash Hazard in 3Ø Pad Mounted Transformers and Other Safety Considerations Presented at Western Energy Institute October 12, 2010 Christian.
Chapter 7 SYSTEM PROTECTION
For Sage MIP Fund Accounting
Microsoft Office Word 2013 Expert Microsoft Office Word 2013 Expert Courseware # 3251 Lesson 4: Working with Forms.
COMPREHENSIVE Excel Tutorial 8 Developing an Excel Application.
Chapter 9 Macros, Navigation Forms, PivotTables, and PivotCharts
An Introduction to Mersen Electrical Services Putting electrical safety to work.
LOGO Chapter V Formattings 1. LOGO Overview  Conditional formatting  Working with tables  Filtering  Sorting  Freeze panes  Pivot tables  How to.
TrendReader Standard 2 This generation of TrendReader Standard software utilizes the more familiar Windows format (“tree”) views of functions and file.
Copyright © 2003 by Prentice Hall Computers: Tools for an Information Age Chapter 14 Systems Analysis and Design: The Big Picture.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.1 Exploring Microsoft Office Excel Copyright © 2008 Prentice-Hall. All rights.
Computer Literacy BASICS
4-1 Coding Complete COBOL Programs: The PROCEDURE DIVISION Chapter 4.
SWEDE Tulsa May 8 th, 2009 Dennis Keilbarth Overhead Distribution Arc Flash at PSO.
Chapter 5 Engineering Tools for Electrical and Computer Engineers.
© Evaluating Electrical Risk Factors Module 3.
Spreadsheet-Based Decision Support Systems Chapter 22:
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. 1 1 Copyright © 2008 Prentice-Hall. All rights reserved. Committed to Shaping the.
11 Exploring Microsoft Office Excel 2007 Chapter 4: Working with Large Worksheets and Tables Chapter 04 - Lecture Notes (CSIT 104)
1 12 Systems Analysis and Design in a Changing World, 2 nd Edition, Satzinger, Jackson, & Burd Chapter 12 Designing Systems Interfaces, Controls, and Security.
Automating Database Processing Chapter 6. Chapter Introduction Design and implement user-friendly menu – Called navigation form Macros – Automate repetitive.
Designing Interface Components. Components Navigation components - the user uses these components to give instructions. Input – Components that are used.
1 The Software Development Process  Systems analysis  Systems design  Implementation  Testing  Documentation  Evaluation  Maintenance.
Lesson 17 Getting Started with Access Essentials
© Methods of Control Module 4. © Recognize Control Evaluate.
Systems Analysis and Design in a Changing World, Fourth Edition
Protection of Microgrids Using Differential Relays
NFPA 70E Electrical Safety in the Workplace. Objectives What NFPA 70E covers Understand Arc Flash, Incident Energy, & Flash Protection Boundary Standards,
EAS Lessons Learned Summary Lessons Learned Published in June 2014.
First Draft Language (B) Service Equipment. In addition to the requirements in (A), service equipment shall contain the following information: (1)
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
Describing Arc Flash Incident Energy per Feeder Length in the Presence of Distributed Resources Tom R. Chambers, P.E. Power System Engineering, Inc. Madison,
Scientific data storage: How are computers involved in the following?
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
©2011 Ohio Rural Electric Cooperatives 2012 NESC Update Changes to Work Rules.
© 2015 Eaton Corporation. All rights reserved. This is a photographic template – your photograph should fit precisely within this rectangle. Eaton software.
Electrical Distribution Analysis & Testing Everything You Need To Know About Power Distribution By Current Solutions PC.
This is a photographic template – your photograph should fit precisely within this rectangle. © 2016 Eaton. All rights reserved. Eaton software tools xSpider.
What is Arc Flash? Electrical arc flash and arc blasts release dangerous levels of heat energy, fire , molten materials, vaporized solids that can be inhaled,
Excel Tutorial 8 Developing an Excel Application
SOFTWARE TESTING Date: 29-Dec-2016 By: Ram Karthick.
Exploring Microsoft Office Access 2007
DELLSOFT Technologies Pvt. Ltd.
PSCAD models.
Microsoft Office Access 2010 Lab 2
BASIC INFORMATION ABOUT DATABASE MANAGEMENT SOFTWARE
Designing and Debugging Batch and Interactive COBOL Programs
Anna Brinck, M.S. Student Robert Cuzner, Assistant Professor
OSHA’s Final Rule: Electric Power Generation, Transmission, and Distribution Electrical Protective Equipment Presented to: RESAP Area Administrators Presented.
Engineering Tools for Electrical and Computer Engineers
Murray State University
SDLC Phases Systems Design.
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Presentation transcript:

Utility Scale Arc Flash Analysis using CAPE System Simulator

BIOGRAPHY Commonwealth Associates, Inc. Project Manager: Ian Hutt, P.E. Main office Jackson, MI; remote offices in GA, WA, NM, OH, and VA. Over 200 employees. Electrical studies, transmission planning and protection, substation design, transmission line design, permitting, and right-of-way acquisition.

What is driving new utility arc flash requirements? IEEE 1584 requires employers to review low voltages, V. NESC 2012 code defers to IEEE 1584, and requires study specifically for 1000 to 800 kV. New NESC 2012 requirements now overrule previous exception from NESC 2007 for utilities. NESC code requires utilities to have compliance by Jan 1, Many utilities are looking for a comprehensive solution that includes medium and high voltage networks References include Table and in Part 4: Rules for the Operation of Electric Lines in the NESC code

PROJECT BACKGROUND Objective: create a macro in CAPE to allow for easy calculation of arc flash at specified busses in a utility transmission system Project: Study a few select substations, and develop an engineering report. The method used for the select substations could then be applied to remaining system busses by utility internal staff. Arc flash labels and operating procedures could be developed based on study results. Utility wanted to reduce or eliminate arc flash levels to below Category 2, to reduce or eliminate the need for more bulky PPE for workers in the field.

THE PROJECT TEAM Ian Hutt, P.E. Project Manager / Lead Engineer Claire Patti, P.E. Protection Engineer Chris Nelson, E.I.T. Protection Engineer Jeanette Dodge Engineering Aide A special thank you to Ashok Gopalakrishnan, Daryl Coleman, and Paul McGuire at Electrocon International.

DATA GATHERING Receive CAPE Model Receive Protection Drawings PROJECT FLOW CHART ARC FLASH MACRO Run Arc Flash Macro Compile results EVALUATION Evaluate Results Report Develop Labels MODEL DEVELOPMENT Develop model to be fully functional in system simulator Validation

DATA GATHERING

INFORMATION REQUIRED FROM UTILITY System short circuit model Protection drawings (Used to develop and validate model) Relay setting sheets Are relay setting sheets and drawings electronic? Review with utility protection engineers (to ensure model accuracy)

MODEL DEVELOPMENT

CAPE ONE LINE Develop CAPE one-line and compare to existing system diagrams Simple vs. detailed bus structures Transfer tripping Layout Formatting

PROTECTION Evaluate Relays in Model Are settings up to date and accurate? Are all necessary relays included? Bus vs. line vs. backup protection Electromechanical vs. digital relays What tools are available to bring over relay settings into CAPE?

CONTACT LOGIC System Simulator requires the use of contact logic to simulate the tripping outputs of a relay. Contact logic code/expression rules and guidelines. Use of a standard format for contact logic expression to allow for repeatability Include use of timers for certain protection schemes.

VALIDATION OF SYSTEM SIMULATOR Run simple test analysis to verify System Simulator operation. Test by placing faults to be picked up by protection and verify operation. Disable primary protection to verify timing and operation of backup protection. Can be automated for large scale checking of network

ARC FLASH MACRO

DEVELOPMENT OF MACRO Macro was developed by protection engineers experienced in arc flash calculation Macro was based on existing arc flash macro developed by Ashok Gopalakrishnan at Electrocon Macro was developed to provide output based on total accumulated incident energy for a specified fault occurrence Macro designed to be used on a large, utility-scale network to study bus faults Macro can be easily adapted to special cases, based on utility preference

RUNNING ARC FLASH MACRO Macro can be run from CAPE System Simulator module. First, input macro using CAPE File | Input Second, type macro command from command bar

RUNNING ARC FLASH MACRO (continued) Once macro is called, a window will pop up with choices for the user. Can select one bus to study, or a set of busses. The set “Allbuses” will study entire network.

RUNNING ARC FLASH MACRO (continued) Choose a fault type; 3PH, SLG, 2PH, LL are available (only SLG used for above 15 kV) Specify working distance (18” through 48” available; macro can be adjusted to accommodate special cases)

RUNNING ARC FLASH MACRO (continued) Choose a bus gap (distance between busses; macro recommends gap based on voltage) Specify if faults will be open or closed box (only applies for low voltage faults)

RUNNING ARC FLASH MACRO (continued) You can specify the filename path, or allow the default Select time units in seconds or cycles Macro allows for fault resistance to reduce fault current to 85% of full, per IEEE 1584 recommendations

RUNNING ARC FLASH MACRO (continued) Selecting detailed reporting allows easy understanding of results, with a definition of each value. Selecting “No” allows for easy input into a database or spreadsheet.

RUNNING ARC FLASH MACRO (continued) Using the Category filter, you can get results for only those areas that exceed a certain Category threshold. By doing this, you can study large systems and only see the areas where arc flash hazard is above a certain level.

RUNNING ARC FLASH MACRO (continued) Macro runs in System Simulator; checks coordination for fault Macro runs in a loop to clear all faults for each protective element step (up to 30), recording accumulated incident energy level

RUNNING ARC FLASH MACRO (continued) Based on the run, the detailed report shows the study results. For this case, using the macro on the CAPE.GDB database, bus 150 has a Category 3 rating.

RUNNING ARC FLASH MACRO (continued) The results show the: – Total fault current – Total clearing time – Total incident energy – Flash protection boundary The detailed report shows the step-by-step results; selecting “No” to detailed reporting will show only totals.

Real Data Commonwealth Arc Flash macro was run on a real utility system that has a complete System Simulator capable model. Bus names have been removed for confidentiality. Example shows how macro can be applied to a real model, and used to calculate arc flash hazard for a system model. Model used was a transmission voltage network, and has simple buses representing substations.

Real Data (continued)

EVALUATION

Real Data Summary The results table can be reviewed and results addressed by severity. Areas with high incident energy levels can be mitigated to reduce arc flash hazard. A full review is required at each location to ensure the results are accurate and reasonable. Below is the summary of results by total: – Category 4+5 – Category 41 – Category 39 – Category 23 – Category 16 – Category 024

REPORTING AND LABELS Results in an Excel spreadsheet or database program to review data. Data can be presented in the form of an Arc Flash Report deliverable. Arc Flash Report can be used as a guide for developing safe work practices and procedures. Arc Flash Report can be a guide for selecting appropriate personal protective equipment (PPE). Safety labels created based on the data to ensure worker safety and adequate warning for hazards.

WE ARE HAPPY TO PROVIDE MORE DETAILED INFORMATION REGARDING METHODS USED IN THIS PROJECT. Send questions to Ian Hutt

QUESTIONS???

QUESTIONS FOR YOU… Does your utility have an arc flash study in place? – For your high voltage network? – For your distribution voltage network? – For low voltage devices on your network? Does your CAPE model have System Simulator capability? Does System Simulator capability have value? What are the expected costs associated with arc flash study? What are the expected costs associated with model development for System Simulator capability?