STATISTICAL PROCESS CONTROL SPC. PROCESS IN A STATE OF STATISTICAL CONTROL.

Slides:



Advertisements
Similar presentations
Statistical Process Control
Advertisements

High School Graduation Test Review Domain: Data Analysis How is data presented, compared and used to predict future outcomes?
Operations Management Statistical Process Control Supplement 6
More Variable Control Charts A. A. Elimam. What about the Short Run? n n X-bar and R charts track process with long production runs or repeated services.
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 9 Process Capability and Statistical Quality Control.
1 DSCI 3123 Statistical Process Control Take periodic samples from a process Plot the sample points on a control chart Determine if the process is within.
Statistical Process Control Processes that are not in a state of statistical control show excessive variations or exhibit variations that change with time.
6-1 Is Process Stable ? The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process.
Statistical Process Control. Overview Variation Control charts – R charts – X-bar charts – P charts.
[1] MA4104 Business Statistics Spring 2008, Lecture 06 Process Monitoring Using Statistical Control Charts [ Examples Class ]
Statistics : Statistical Inference Krishna.V.Palem Kenneth and Audrey Kennedy Professor of Computing Department of Computer Science, Rice University 1.
Agenda Review homework Lecture/discussion Week 10 assignment
 Variable - a single quality characteristic that can be measured on a numerical scale.  When working with variables, we should monitor both the mean.
SJSU Bus David Bentley1 Week 03B – Statistical Process Control (Ch 6S) Control process, statistical process control (SPC): X-bar, R, p, c, process.
originally developed by Walter A. Shewhart
CHAPTER 8TN Process Capability and Statistical Quality Control
Statistical Process Control
Rev. 09/06/01SJSU Bus David Bentley1 Chapter 10 – Quality Control Control process, statistical process control (SPC): X-bar, R, p, c, process capability.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e KR: Chapter 7 Statistical Process Control.
X AND R CHART EXAMPLE IN-CLASS EXERCISE The following collection of data represents samples of the amount of force applied in a gluing process: Determine.
IE 355: Quality and Applied Statistics I Short Run SPC
X-bar and R Control Charts
Standard error of estimate & Confidence interval.
Statistical Process Control
Process Capability and SPC
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 17-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
 Review homework Problems: Chapter 5 - 2, 8, 18, 19 and control chart handout  Process capability  Other variable control charts  Week 11 Assignment.
ESTIMATING with confidence. Confidence INterval A confidence interval gives an estimated range of values which is likely to include an unknown population.
Process Capability and SPC
Advanced Algebra II Notes 2.2 Measures of Spread Rolling Paper Ball Experiment: Roll a ball of paper down a ramp (book) raised at a fixed angle (place.
Success depends upon the ability to measure performance. Rule #1:A process is only as good as the ability to reliably measure.
M11-Normal Distribution 1 1  Department of ISM, University of Alabama, Lesson Objective  Understand what the “Normal Distribution” tells you.
Welcome to MM305 Unit 8 Seminar Diallo Wallace Statistical Quality Control.
 Review homework Problems: Chapter 5 - 2, 8, 18, 19 and control chart handout  Process capability  Other variable control charts  Week 11 Assignment.
BPS - 5th Ed. Chapter 11 1 Sampling Distributions.
Chapter 9 Fundamentals of Hypothesis Testing: One-Sample Tests.
1 Chapter 10: Introduction to Inference. 2 Inference Inference is the statistical process by which we use information collected from a sample to infer.
6. Control chart for variable It is important to control over both the process mean and the process variability. –Control the process by using the x chart.
Warm-Up To become president of the United States, a candidate does not have to receive a majority of the popular vote. The candidate does have to win a.
Managing Quality CHAPTER SIX McGraw-Hill/Irwin Statistical Process control.
By: Samah Tout and Bing Liu Team Potassium Sigma Nov. 20,2007.
The Certified Quality Engineer Handbook Examples from Ch
Statistical Quality Control/Statistical Process Control
MORE THAN MEETS THE EYE Wayne Gaul, Ph.D., CHP, CHMM Tidewater Environmental Columbia, SC SRHPS Technical Seminar, April 15, 2011.
Statistical Quality Control
ENGM 620: Quality Management Session 8 – 30 October 2012 Process Capability.
Statistics Chapter 6 / 7 Review. Random Variables and Their Probability Distributions Discrete random variables – can take on only a countable or finite.
Statistical Process Control. Overview Variation Control charts – R charts – X-bar charts – P charts.
1 Slides used in class may be different from slides in student pack Technical Note 8 Process Capability and Statistical Quality Control  Process Variation.
1 © The McGraw-Hill Companies, Inc., Technical Note 7 Process Capability and Statistical Quality Control.
Individuals Chart Due to High Costs (e.g., destructive testing/measurement) or a lack of data gathering opportunities there may be only one measurement.
Quality Control  Statistical Process Control (SPC)
Section 5 Control Charts. 4 Control Chart Applications Establish state of statistical control Monitor a process and signal when it goes out of control.
R&R Homework Statgraphics “Range Method”. DATA OperatorPartTrialMeasure B B B B B B326.5 B B B C
Quality Control Chapter 6. Transformation Process Inputs Facilities Equipment Materials Energy Outputs Goods & Services Variation in inputs create variation.
Internal Process Model Monitor Role Competency: Managing Collective Performance.
Assignable variation Deviations with a specific cause or source. Click here for Hint assignable variation or SPC or LTPD?
Acceptable quality level (AQL) Proportion of defects a consumer considers acceptable. Click here for Hint AQL or producer’s risk or assignable variation?
Psychology 202a Advanced Psychological Statistics
X AND R CHART EXAMPLE IN-CLASS EXERCISE
The Certified Quality Engineer Handbook Ch
The Certified Quality Engineer Handbook Ch
Inferences and Conclusions from Data

Statistics for Business and Economics
Additional notes on random variables
Sampling Distribution of a Sample Proportion
Additional notes on random variables
BENEFITS OF AUTOMATED SPC
Presentation transcript:

STATISTICAL PROCESS CONTROL SPC

PROCESS IN A STATE OF STATISTICAL CONTROL

PROCESS “NOT” IN A STATE OF STATISTICAL CONTROL

PROCEDURE TO DETERMINE IF PROCESS IS IN A STATE OF STATISTICAL CONTROL 1. Randomly sample “n” units throughout the day (can be every 5 minutes, every 30 minutes, etc. - whatever is appropriate for your case) 2. For each sample, calculate “X-BAR” to estimate the mean and “R (range)” to estimate variability. NOTE: THE RANGE CAN BE USED TO ESTIMATE THE STANDARD DEVIATION.

PROCEDURE TO DETERMINE IF PROCESS IS IN A STATE OF STATISTICAL CONTROL 3. After collecting the samples, calculate X-BAR-BAR (the average of all the X-BARs) and R-BAR (the average of all the ranges) 4. Using X-BAR-BAR and R-BAR, calculate the control limits for your X-BAR and R Control Charts. X-BAR CONTROL LIMITS: (X-BAR-BAR) + A 2 (R-BAR) R CONTROL LIMITS: D 3 (R-BAR) and D 4 (R-BAR)

CONTROL CHART CONSTANTS

PROCEDURE TO DETERMINE IF PROCESS IS IN A STATE OF STATISTICAL CONTROL 5. For the R Control Chart, plot all R values on the R Control Chart to see if all the Ranges are “between the control limits”. If they are, then your process is considered to be in a state of statistical control (as far as the variability of the process is concerned) 6. For the X-BAR Control Chart, plot all the X-BARs on the X-BAR control chart to see if all the X-BARs are “between the control limits”. If they are, then your process is considered in a state of statistical control (as far as the average of the process is concerned) NOTE 1: If the R chart is not stable, do not try to evaluate stability of the X-BAR chart. (always look at R chart first) NOTE 2: There are other rules available to help determine statistical stability, other than all observations being within the control limits. These are normally referred to as the WECO rules.

PLOT DATA ON CONTROL CHARTS CALCULATED TO DETERMINE STATISTICAL STABILTIY (EXAMPLE: PROCESS IN CONTROL)

PLOT DATA ON CONTROL CHARTS CALCULATED TO DETERMINE STATISTICAL STABILTIY (EXAMPLE: PROCESS NOT IN CONTROL)

PROCEDURE TO DETERMINE IF PROCESS IS IN A STATE OF STATISTICAL CONTROL 7. If process is determined to be “NOT STABLE”, then stop and find out what an assignable cause might be, fix, and then repeat the complete process of collecting new data. DO NOT USE THESE ORIGINAL CONTROL CHARTS THAT REFLECTED AN UNSTABLE PROCESS TO MONITOR FUTURE PRODUCTION. 8. If the process is determined to be “STABLE”, then you may use the control charts you developed to monitor future production to insure that the process REMAINS stable.

IF PROCESS IS STABLE, EXTENT CONTROL CHARTS TO MONITOR “FUTURE” DATA

9. AT ANY FUTURE POINT IN TIME, IF ANY X-BAR OR R VALUE IS NOT BETWEEN CONTROL LIMITS, OR VIOLATES ONE OF THE WECO RULES, THEN STOP THE PROCESS AND FIND OUT WHAT WENT WRONG!