Michael Roberts, PMP. “A project is a temporary endeavor undertaken to create a unique product, service, or result.” An ongoing work effort is generally.

Slides:



Advertisements
Similar presentations

Advertisements

Business Process Management and Modeling. Two Key Aspects Tools for Today: Utilize effective methods to gather information and model workflows Tools for.
MISHRM 2014 Annual Conference
©2006 OLC 1 Process Management: The Foundation for Achieving Organizational Excellence Process Management Implementation Worldwide.
Solving Business Problems
Lean Six Sigma: A Vision
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
Lean Six Sigma A Methodology for Cultural Change and Continuous Process Improvement (CPI)
Overview of Lean Six Sigma
6  Methodology: DMAIC Robert Setaputra. PDCA / PDSA PDCA / PDSA is a continuous quality improvement tool. PDCA is introduced by Shewhart. PDSA is Deming’s.
Barry Murash MBBit Nortel 2007
Space and Airborne Systems NDIA/SEI CMMI Technology Conference Presented by N. Fleischer 1 Raytheon’s Six Sigma Process and Its Application for CMMI By.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Development of Six Sigma
Managing Project Quality
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Using Six Sigma to Achieve CMMI Levels 4 and 5
1 SIX SIGMA "Delivering Tomorrow's Performance Today" AIR CDRE ABDUL WAHAB.
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
“Safety is a Measure of Success”
Project Management: Madness or Mayhem
Chapter 1 Enterprise Wide View.
6 Sigma Hazırlayanlar : Emine Yılmaz Cansın Eminoğlu.
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
Σ Six Sigma: Process Perfection Customer Satisfaction through Error Elimination.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved. BUSINESS DRIVEN TECHNOLOGY Business Plug-In B10 Project Management.
Welcome to Lean Six Sigma Green Belt Training
By: Nick Blank March 1, Six Sigma Definitions Goals History Methods Roles Benefits Criticism Software Development.
NDIA Systems Engineering Supportability & Interoperability Conference October 2003 Using Six Sigma to Improve Systems Engineering Rick Hefner, Ph.D.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
CS532 Term Paper Applying Six Sigma Methodology In Software Engineering Sourabh Bandyopadhyay.
Introduction to Six Sigma. Learning Objectives The Need for Six Sigma Six Sigma - Vision, Philosophy and Statistical Method Breakthrough Strategy and.
Process Improvement Imagine the Future. What is Process Improvement? Better (Quality) Faster (More Efficiency) Cost Effective Profit (King) Savings Cost.
Define Tollgate Checklist
© 2001 Six Sigma Academy © 2003 Six Sigma Academy1 Champion Workshop Key Concepts.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Finance Vic Rainsford Vice President Planning & Analysis Jim Palmer Sr. Mgr. Planning & Analysis.
The Value Driven Approach
Introduction to Kaizen Introduction Kaizen Facilitation.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
Energy Control Systems 1 Six Sigma Overview Scott Carcillo 6/8/99.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
UNIT 5.
© 2003 Six Sigma Academy0 The Roles of Six Sigma Champion Workshop.
Rapid - Lean Six Sigma: Executive Overview Leading in a Lean Six Sigma Environment University of Washington – Tacoma Key Bank Professional Development.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Six sigma Introduction Prepared & Presented By:-Six Sigma Team.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Analyze Wrap Up and Action Items
TM 720: Statistical Process Control DMAIC Problem Solving
A Strategy for Achieving World Class Perfor-mance
Six Sigma.
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
BUSINESS DRIVEN TECHNOLOGY
Six-Sigma : DMAIC Cycle & Application
Lean Six Sigma DMAIC Improvement Story
Six Sigma Approach.
Six Sigma.
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Quality Certification
OPS/571 Operations Management
Quality Management Six Sigma
Framework for Success: DMAIC
6 Six Sigma Basics GEOP 4316.
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
Measure Phase Wrap Up and Action Items
Presentation transcript:

Michael Roberts, PMP

“A project is a temporary endeavor undertaken to create a unique product, service, or result.” An ongoing work effort is generally a repetitive process because it follows an organization’s existing procedures.” PMBOK, 4 th ed. So… why should project managers care about process improvement???

4 Reasons… – Project Management is a discipline built on processes – Project plans link processes together to achieve project results – Improving process efficiency and effectiveness, in both dimensions, is fundamental to improving overall project management performance –Project managers typically must include quality assurance processes for project deliverables

“We don't know what we don't know. We can't act on what we don't know. We won't know until we search. We won't search for what we don't question. We don't question what we don't measure. Hence, we just don't know.” – Dr. Mikel Harry

DefineMeasureAnalyzeImproveControl Lean Six Sigma seeks to : Improve the effectiveness (quality) of manufacturing and business processes by identifying and removing the causes of defects (errors) and variation. Improve the efficiency of manufacturing and business processes by identifying and removing sources of waste within the process. Improve effectiveness and efficiency, based on outputs that are critical to customers.

It is a management philosophy - a commitment to managing through process, not function, and making decisions based on facts and data. Lean Six Sigma seeks to understand performance concerns through a methodology and toolset focused on understanding customer through process, value flow and data driven analysis.

Most Lean Six Sigma programs seek to drive a quality culture change through a multi-level based program. LevelTraining Green BeltLSS Methodology and basic tool set Black BeltGreen Belt content plus advanced data analysis Master Black BeltBlack belt content plus program management, leadership skills, some advanced tools

Establish goals and objectives for the program up front. Strong Executive and mid-level management support. Integrate the program into existing operations not as a separate organization. Shared goals and objectives between practitioners and leadership. Build the program to change the culture so that at some future point, everyone is a practitioner.

Ford Assembly Line Guinness Brewery Shewhart Introduces SPC Gilbreth, Inc. Management Theory Industrial Engineering Deming 14 Points 7 Deadly Diseases Toyota Production System

Motorola Introduces Six Sigma Just – in–Time SPC Lean Mfg. TQM AlliedSIgnal GE Adapt LSS to Business Processes

Lean Six Sigma evolved over a century It is built upon proven quality and process improvement tools and techniques Lean Six Sigma introduced three new principles or methods: Focus on quality and efficiency as defined by the customer Focus on financial impact to the bottom line An enhanced problem solving methodology that looks for sustainment of performance gains

Specify value in the eyes of the customer Identify the value stream and eliminate waste Make value flow at the pull of the customer Involve and empower employees Continuously improve in the pursuit of perfection

Defects (the effort involved in inspecting for and fixing defects) Overproduction (making more than what is needed, or making it earlier than needed) Transportation (moving products further than is minimally required) Waiting (products waiting on the next production step, or people waiting for work to do) Inventory (having more inventory than is minimally required) Motion (people moving or walking more than minimally required) Processing Itself

Voice of Customer Voice of Process The Voice of the Process is independent of the Voice of the Customer Sigma Capability Defects per Million Opportunities % Yield 2308, % 366, % 46, % % %

99% Good (3.8 Sigma) % Good (6 Sigma) 20,000 lost articles of mail per hour (based on 2,000,000/hr) 7 articles lost per hour Unsafe drinking water for almost 15 minutes each day 1 unsafe minute every 7 months 5,000 incorrect surgical operations per week 1.7 incorrect operations per week 2 short or long landings daily at an airport with 200 flights/day 1 short or long landing every 5 years 2,000,000 wrong drug prescriptions each year 680 wrong prescriptions per year No electricity for almost 7 hours each month 1 hour without electricity every 34 years

LSLUSL Customer Target Defects Prevent Defects by Reducing Variation LSLUSL Customer Target Defects Prevent Defects by Centering Process LSLUSL Customer Target Meet Customer Requirements

The foundational methodology to Lean Six Sigma’s Success is, DMAIC. It’s uniqueness as a problem solving methodology is it’s intentional focus on data and requirement of a sustainment strategy. Define: Describe the problem quantifiably, and the underlying process to determine how performance will be measured Measure: Use measures / metrics to understand current performance and the improvement opportunity Analyze: Identify the true root cause(s) of the underlying problem Improve: Identify and test the best (cost, time to implement, impact, etc.) improvements that address the root causes. Control: Identify sustainment strategies that ensure process performance maintains the improved state.

The Define Phase “Well begun is half done” – Mary Poppins Purpose: Identify the problem and underlying process to be improved Understand the customer, their needs / requirements (CTQs) Quantify the performance gap and its impact Define the performance standard or measures Set project success criteria Ensure sponsorship and resources are in place Deliverables: Approved charter Project plan with milestones Planned benefit analysis Team formed and engaged High level process map Customer performance requirements (CTQs) linked to process outputs and value stream

The Define Phase - Example “Well begun is half done” – Mary Poppins Problem: Project execution is poor at ScoobyDoo Enterprises. Problem: Project execution is poor at ScoobyDoo Enterprises. Projects are always late and overbudget at ScoobyDoo enterprises costing lots of money. 60 out of 80 IT projects completed in 2008 at ScoobyDoo enterprises exceeded time estimates by more than 25% at a cost of $21.1M dollars in expense and lost opportunity. Problem: Project execution is poor at ScoobyDoo Enterprises. Projects are always late and overbudget at ScoobyDoo enterprises costing lots of money. Project Sponsor: Billy Bob Buckaroo, Exec VP IT Services Project Team: Sally Straightedge, Business Analyst Wiley Poindexter, Technical Architect / Lead Developer Reggie Rocketeer, PMP, Project Management Lead Bruce Lee, LSS Black Belt Objective: 50% improvement in on-time delivery; $10.5M benefit

The Define Phase - Example “Well begun is half done” – Mary Poppins High Level Process Map: ScoobyDoo Enterprises utilizes PMI compliant process set.

The Measure Phase “Measure what is measureable, and make measurable what is not so.” – Galileo Purpose: Identifies / establishes data sources to be used for project Identifies process steps for project focus Establishes baseline process performance against CTQs Deliverables: Validated project problem definition Data Collection plan Detailed process map with ins/outs and associated measures Measurement Accuracy / Consistency Assessment (MSA) High level Root Cause Analysis to identify process focus Stability assessment of the process

The Measure Phase - Example “Measure what is measureable, and make measurable what is not so.” – Galileo Data Source: Project Tracking Database – 80 IT Projects, closed in 2008 Validation of Data Source: Data is collected via automated time tracking. Sampled 14 project confirmed project start and stop dates were accurate based on confirmation with accounting systems and tracking.

The Measure Phase - Example “Measure what is measureable, and make measurable what is not so.” – Galileo Baseline Performance: 63 out of 80 – 78.75% Total Cost of Poor Quality: $21.1M

The Measure Phase - Example “Measure what is measureable, and make measurable what is not so.” – Galileo Potential Area of Focus Observed in Data: Project Manager Team

The Measure Phase - Example “Measure what is measureable, and make measurable what is not so.” – Galileo Potential Area of Focus Observed in Data: Sponsoring Organization

The Analyze Phase “It requires a very unusual mind to undertake the analysis of the obvious.” – Alfred North Whitehead Purpose: Identifies actionable root causes – tied to discrete process steps Connects the Process Outputs (Ys) to Process Inputs (Xs) to identify root cause Deliverables: A prioritized list of potential root causes Data Collection / Analyzed supporting conclusions

The Analyze Phase - Example “It requires a very unusual mind to undertake the analysis of the obvious.” – Alfred North Whitehead Why would the team a project manager came from make a difference? Different Experience Levels? Different Methodologies? No; data shows no statistical difference. Each team develops their own best practices Which process steps differ between Best and Worst results? Best: PERT Estimation linked to Risk Processes Worst: Single point estimates Co-location with project teams? Best performing teams were co-located

The Analyze Phase - Example “It requires a very unusual mind to undertake the analysis of the obvious.” – Alfred North Whitehead Why would the sponsoring organization make a difference? More difficult projects? Change Management? Best: Changes required formal assessment of impact Worst: Changes were assessed but impact was overridden 67% Strong sponsorship? Best performing groups shared objectives for project success No; data shows no statistical difference.

The Improve Phase - Example “This became a credo of mine...attempt the impossible in order to improve your work.” – Bette Davis Possible Improvements 1.Standardize PERT analysis with Risk Identification / Mitigation 2.Co-Location of project team 3.Sponsors share accountability with project managers for success 4.Standardize Change Management Processes across groups Low ImpactHigh Impact High Cost Low Cost Improvements to be piloted. Pilot to execute as production for 6 months. Performance will be assessed as projects execute and complete

The Improve Phase - Example “This became a credo of mine...attempt the impossible in order to improve your work.” – Bette Davis Pilot Results Impact of improvements showed in time

The Improve Phase - Example “This became a credo of mine...attempt the impossible in order to improve your work.” – Bette Davis Pilot Results Previous Baseline 78.75% Defective Improved Baseline 16% Defective Original Goal 50% Improvement $10.5M Benefit Achieved Goal 80% Improvement $16.8M Benefit

The Control Phase “The greatest potential for control the ends to exist at the point where action takes place..” – Louis Allen Purpose: Document an approved control plan that contains all necessary items – documentation, activities, etc. to sustain the improved performance. Include a process monitoring capability which will prevent and/or alert process owners should the process begin to deviate from improved performance levels. Deliverables: Updated process documentation with integration into existing systems Control plan with transition to process team Training Schedule Next steps – further improvement recommendations, replication, etc.

The Control Phase “The greatest potential for control the ends to exist at the point where action takes place..” – Louis Allen Control Plan should include some kind of performance monitoring system on process variables that will alert process owners of drift. It should also identify an appropriate reaction plan in such an event