1 1. Outline 2  Hazards inventory  Risk control measures  Safety documentation  Conclusion and outlook.

Slides:



Advertisements
Similar presentations
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
Advertisements

Emergency Preparedness and Response
Disaster Planning What Supervisors Need to Know. Session Objectives You will be able to: Recognize the types of workplace disasters you may face Understand.
General Rules Compressed gases and cylinders must be properly stored, transported and used to prevent injury and accidents. Compressed gases and cylinders.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
Work In Confined Spaces
Developing a Chemical Risk Management Program
Fire Protection John Giefer. Statistics In the Drilling Industry In the Drilling Industry 25% of all inspections found violations of (21 inspections.
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
Permit to Work Procedure Document Number: KOC.SA.004
Safety aspects: electrical and gas safety, Cs handling, radiation & fire protection Matthias Kronberger, Mats Wilhelmsson On Behalf of the Linac4 ion source,
CNG STATION & GARAGE MODIFICATION CODES & STANDARDS Graham Barker Business Development Manager.
Patrick Thornton, SNS/FPE June 9, 2008
EGRESS AND FIRE PROTECTION
Dr Daniel Colbourne 36th Meeting of the Open-ended Working Group of the Parties to the Montreal Protocol – Side Event UNEP.
EuropeAid/131555/C/SER/RS Safety Procedures in the Chemical Industry Ernst SIMON, Styrian Regional Government, Austria Belgrade, December 2013.
Welding and Cutting for construction. Welding safety program guidelines Person responsible Accountability and enforcement Job hazard assessment Special.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
DGS/SEE Flammable Gas Safety – an update. DGS/SEE New Chemical Safety Rules New SR-C, Chemical Agents. GSI-C1, Prevention and Protection.
Safe Operation of Storage Tanks: Decommissioning and Repair
Part 3.3 Production Safety. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand safety.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
128 May 2013 CENF Near Far Integration For the Safety Folder + Environmental impact Study Simple process: Identify Safety issues >> description >> risk.
Gas Coordination Panel 24/08/2004 Flammable Gas Installation Requirements, Interlocks, etc. F.H.
1 1. Some recent views ( ) 2 Linac tunnel
Application – Identifying, Listing Equipment, and Documentation
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Ion Sources – Hardware and Operation MACS Week Friday 8th October 2010 PP a-LPE, 8 th October 2010, MACS Week 2 Liviu Penescu, „Ion Sources.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
SOME CEDAR NEWS Lau Gatignon / EN-MEF TD meeting 12/07/2011  Summary of HAZOP and Zoning meeting  Forthcoming CEDAR related work at CERN.
Chemical Safety Course (TSOs) Prepared by: Jonathan GULLEYDate: 25 th November 2015.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Solvent machine cleaning - Risk analysis 1/22 L.Bardo - PH-CMX 04 December 2015.
ERT 312 SAFETY & LOSS PREVENTION IN BIOPROCESS HAZARDS IDENTIFICATION
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
Duy Phan, EN-STI-RBS. Description of the hazards  An Oxygen Deficiency Hazard (ODH) exists when the concentration of O2 ≤ 19.5 % (by volume)  Cold burns.
Presented by John Lewandowski and Mike Larabel Inspection, Testing, and Maintenance of Kitchen Hood Systems Michigan Fire Inspectors Society Winter Educational.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Timing (minutes) Learning ObjectiveMain tasks / ProcessResources / tools 5TitleStandard Operating Procedures for Power Press Machine Slide 1 5Index 
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
© BLR ® —Business & Legal Resources 1603 Disaster Planning What Supervisors Need to Know.
Safety and Prevention of Typical Fire Plan
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
Dielectric Oil Installations
(Modified from University Of South Carolina)
Chemical Safety Course (TSOs)
HEL – Safety aspects Christelle Gaignant
HSE rules & regulations
Chemical Safety Course (TSOs)
BE-ICS activities for LIU Project
East Area Renovation Project team #6 Launch safety agreement
Chapter 9 Safety Permit Systems
Chemical Safety and Security Plan
Firefighting equipment
HAZOP Guidewords Base Set
ISRC and LEBT Vacuum System Design
PSS0 Design & Concept of Operations
Radiation Protection Handbook
Risk Management Student Powerpoint
IS&LEBT Commissioning Review Safety and Radiation Protection
Presentation transcript:

1 1

Outline 2  Hazards inventory  Risk control measures  Safety documentation  Conclusion and outlook

Hazards inventory 3 Electrical hazards: -High voltage (10kV to 50 kV) -Capacitor banks (20J/50 kV) Non ionizing radiations: -High power RF 2 MHz (RF power amplifier in the Klystrons hall) Flammable gas: -Hydrogen (2 x 10 liter 200 bar gas bottles) Chemical hazards: -Oil -Caesium (with plasma Cs source) Mechanical hazards: -Pressurized pipelines (0.5-3 bars H2) Closed Faraday cage  Electrocution, electrical shocks, fire  Electrical shocks, tissue burns  Explosion, fire  Release of gas, explosion; hearing loss, material projection  Fire, explosion, intoxication, chemical burns  Pollution NY03 NY04 NY05 NYTR NJ 01 NY Equipment under vacuum (up to mbars)

Risk control measures 4 Based on HSE Launch Safety Agreement (equivalent to EDMS for Linac4 ion source): This document is an overview of the applicable Safety requirements for the ion source (based on the CERN Safety rules or if not existing, on Host States regulations, European Directives, international standards and best practices). FieldsSafety requirements Electrical safety  Safety Code C1- Electrical safety codeC1  Safety Instruction IS24 – Regulation applicable to electrical installationsIS24 Non ionizing radiations (RF)  European Directive 2013/35/EU European Directive 2013/35/EU  French Decret n˚ of 3 Mai 2002 French Decret n˚ of 3 Mai 2002 Flammable gas (H2)  Explosive atmospheres (GS-C2)GS-C2 Mechanical safety (Pressure, vacuum)  Safety Regulation on mechanical equipment (SR-M)SR-M  General Safety Instruction (GSI-M2) – Standard pressure equipmentGSI-M2 Chemical safety (Cs)  Safety Regulation on chemical agents (SR-C)SR-C  General Safety Instruction (GSI-C1) on prevention and protection measuresGSI-C1  General Safety Instruction (GSI-C3) on monitoring of exposure to hazardous chemical agents in workplace atmospheresGSI-C3

Risk control measures 5 Electrical safety and RF Equipment are located inside the closed Faraday cage having a protection index IP3X according to IEC  Faraday cage equipped with AUL (local emergency stop)  Linac4 tunnel equipped with AUG (general emergency stop)  Faraday cage equipped with an access interlock system (EDMS ), PLC-based.EDMS In case of access, the high-voltage power converters and the 2 MHz RF generator are disabled. Racks automatically grounded. Warning signs posted on the doors indicating that access is restricted to specialists.

Risk control measures 6  The maximum volume of a hydrogen leak is 2 m3 with one gas bottle (the full content of one 10 liter, 200 bar bottle). The ventilation system is supervised from the CCC. In case a failure of the ventilation system, the standby service is called (specific written procedures). The gas rack itself is classified as ATEX zone 2, in line with Safety Guideline C Safety Guideline C In case of a gas leak: the ventilated volume around the ion source is considered as large enough (2’500 m 3 ) so that no explosive hazards can arise outside the rack. Hence, gas detection system is not necessary. Flammable gas safety  The gas distribution system can be fully vented with clean nitrogen so that no flammable gas will remain in the system at the operational state “Stop”. Explosion risk assessment: EDMS EDMS

Risk control measures 7  All sections of the pipe work are protected by safety relief valves (relief pressure: 5 bar), with exhaust into the tunnel, which are subjected to periodic tests by the HSE. All the components and the assembly of the gas system are made and tested according to the General Safety instruction GSI-M2 for standard pressure equipment, EDMS EDMS Mechanical safety  The pipe work is tested to 1.5 times the nominal pressure.  Flow rate measures by two redundant flow meters which, in case of abnormal flow rate automatically, will close two pneumatic safety valves. Extract from the Explosion risk assessment file, EDMS Pressurized pipelines Equipment under vacuum EN-MME design

Risk control measures 8 Fire safety Faraday cage Tunnel  Fire detection system : activation of one detector triggers a level-3 alarm and the intervention of the fire brigade  Smoke extraction system (started by the fire brigade) Evacuation plans posted on site Fire extinguishers and fire-fighting system (RIA)  Fire alarm (evacuation) in case of activation of two fire detectors  Interlocks with the ventilation system  Fire detection system + Fire alarm

Risk control measures 9 Chemical safety  Monitoring of oil pressure, temperature, levels includes in the interlock chain of the power converters. Oil 1 1 The transformers of the three HV pulsed power converters are immersed in oil:  Sealed oil tanks  Oil type MIDEL 7131 (3 x 95L): not toxic, high fire point (> 300˚C)  100L retention bund at rack bottom

Risk control measures 10 Chemical safety  Chemical risk assessment (to be released).  Specific procedures to handle the caesium in Linac4 (In Work): installation, multi month operation and exchange of Cesiated ion sources. Caesium (Quantity in the LINAC4 source: 100 mg to 5 g)  The Cs-load and condensed Cs vapours are confined within the dispenser and the ion source vacuum tanks.  Coupling the Cs-dispenser to the source will be done according to a procedure.  Maintenance of the component inside the vacuum tank will be done in a dedicated laboratory (Cs- test stand – building 357).  All transport will be under inert atmosphere enclosed in dedicated hoods.  Personnel protective equipment is foreseen (gloves, goggles) and will be adapted to the tasks.

Safety documentation 11 The safety documentation is included in the Safety Folder of Linac4 which consists of 4 main parts: PartsContentsRef. EDMSStatus DescriptiveDescription of the facility in terms of safety, access modes, dismantling and disposal Approval process closed DemonstrativeHazards inventory, risks induced, risk control measures, risk assessments Under Engineering Check OperationalInventory of information notes, operational instructions and procedures related to safety, description of the project phase and organisation In Work REM (Record, Experience, Monitoring) Inventory of all feedbacks, inspections, safety reports, non-conformities, near- misses, incidents, accidents and experience gained In Work

Safety documentation 12 ProceduresReleasedTo be released In work High voltage safety and Interlocks of the Linac4 Ion Source Test Procedure EDMS Access and work in the H- source cageX Safety lock-out of the Ion Source power convertersX Fire brigade emergency interventionX Procedure in case of failure of the ventilation system of the Linac4 tunnel X Replacement of the H2 bottleEDMS Emergency procedure in case of problem during operation of the LINAC4 gas system EDMS Operation instruction of the gas system: how to connect remotely EDMS Caesium related proceduresX Status of the safety procedures for the Linac4 ion source:

Conclusion and outlook 13  All systems are being documented within CERN safety rules and regulations.  Manpower needs for the remaining safety documentation:  IS-02 (plasma Cs-surface) : 2 months, 0.5 FTE  IS-03 (Magnetron) : 4 months, 0.5 FTE

Thank you for your attention 14