1 Uppsala 14/12/11 - Modulators Pulsed Modulators Concepts and trade-offs David Nisbet CERN.

Slides:



Advertisements
Similar presentations
Sistan & Balouchestan Electric Power Distribution Company
Advertisements

Wind Turbine Session 4.
Stephen Molloy RF Group ESS Accelerator Division
CLIC Drive Beam Klystron Modulators R&D strategy D. Aguglia & D. Nisbet May
Professor Sung-Yeul Park
ILC Marx Modulator Development Program G.E. Leyh, Stanford Linear Accelerator Center.
Fundamentals of Power Electronics 1 Chapter 19: Resonant Conversion Chapter 19 Resonant Conversion Introduction 19.1Sinusoidal analysis of resonant converters.
Workshop on Special Compact and Low Consumption Magnet Design
THALES ELECTRON DEVICES
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
Chapter 8 Inverters AC Power • Inverters • Power Conditioning Units • Inverter Features and Specifications.
POWER SUPPILES LECTURE 20.
European Spallation Source RF Systems Dave McGinnis RF Group Leader ESS Accelerator Division SLHiPP-1 Meeting 9-December-2011.
Development of Solid State Long Pulse Klystron Modulators
CERN 29 Jan 2008 Power Converters for Linac 4 - Carlos A. Martins1 Power Converters for Linac 4 2 Hz) Carlos A. MARTINS Accelerators and Beams (AB)
150W Inverter - an optimal Presenter: Dr Gawie van der Merwe design in solar home systems.
Power Electronics and Drives (Version ) Dr. Zainal Salam, UTM-JB 1 Chapter 3 DC to DC CONVERTER (CHOPPER) General Buck converter Boost converter.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Sept 2011LCWS CLIC DB Klystron Modulators1 1 CLIC Drive Beam Klystron Modulators R&D status & prospects David Nisbet, Davide Aguglia, Eleni Sklavounou,
An Assessment on Klystron Modulator Topologies for the ESS Project Carlos A. Martins (*), Karin Rathsman(**) (*) – Laval University, Dept. Electrical and.
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
Klystron Modulator for Proton Driver
by Sebastian Blume ETH Zürich
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Neutrino Factory Workshop, IOP, 28th October 2003 RF Systems David M Wilcox.
Brief introduction to Imtech Power Electronics “High Gradient Day”, 31 January 2013.
Power Supply System for DRFS
Electromagnetic Compatibility Test for CMS Experiment. Authors C. Rivetta– Fermilab F. Arteche, F. Szoncso, - CERN.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Solid State RF High Power Amplifier Developments at SOLEIL Ti RUAN, on behalf of SOLEIL RF Group CWRF10 CELLS-ALBA Barcelona Spain May
ESS RF System Design Stephen Molloy RF Group ESS Accelerator Division SLHiPP2 4-May-2012.
A common 400 Hz AC Power Supply Distribution System for CMS FEE. Authors C. Rivetta– Fermilab. F. Arteche, F. Szoncso, - CERN.
Modulators for DB klystrons: requirements and plans for developments Serge Pittet, David Nisbet TE EPC.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
22 Set 2009 EPPC 09 CERN September /14 Solid-State MARX Type Circuit for the ISOLDE Target Voltage Modulator L.M. Redondo*, J. Fernando Silva.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
650 MHz Solid State RF Power development at RRCAT
Carlos A. Martins ESS – Accelerator Division - RF Electrical Power Systems June 2 th, 2014 Design, construction and measurement.
Long Pulse Klystron Modulators SML (Stacked Multi-Level) topology
New prototype modulator for the European XFEL Project (DESY) Pulse Step Modulator (PSM) Technology for long pulse applications.
CLOSED LOOP SPEED CONTROL OF DC MOTOR WITH PWM TECHNIQUE
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
Status and plans of drive beam components and tests Status and plans of drive beam components and tests CLIC review, March 1 st, 2016Steffen Döbert, BE-RF.
Presentation CERN SPAIN | ITALY | FRANCE | GERMANY | MEXICO | USA | BRAZIL | UAE | QATAR | OMAN | SAUDI ARABIA jema.es.
Carlos A. Martins ESS – Accelerator Division - RF Electrical Power Systems May 16 th, 2014 Klystron and IOT modulators.
Prospects for developing new tubes
PCIM Europe 2016 Power Conversion and Intelligent Motion
HVDC LIGHT:- NEW TECHNOLOGY FOR A BETTER ENVIRONMENT
Xavier Bonnin and Davide Aguglia
KEK Marx-Modulator R&D
Development of high-power IOTs as an efficient alternative to klystrons Morten Jensen Energy for Sustainable Science 24 October 2013, CERN.
CLIC Civil Engineering & Infrastructure Working Group Meeting
Development of a Marx-Generator for the drive beam electron gun
Uppsala Commitment to ESS and FREIA Planning
M.KARTHIK (10F41D4307) Under the esteemed guidance of
Second SPL Collaboration Meeting, Vancouver May 2009
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
DB Klystron Modulators R&D Status
General presentation about recent status of DRFS
ESS RF Development at Uppsala University
CLIC Drive Beam Klystron Modulators
APPLICATIONS Reference: Textbook-Chapter 6,8 & 9 'Power Electronics',C
Klystron Power Supplies for ILC
CEPC RF Power Sources System
Presentation transcript:

1 Uppsala 14/12/11 - Modulators Pulsed Modulators Concepts and trade-offs David Nisbet CERN

Uppsala 14/12/11 - Modulators 2 Intro Modulator specification Criteria and concepts Modulator design Topology selection Commercial v in-house Prototyping Conclusion

Uppsala 14/12/11 - Modulators 3 RF Powering The RF specification – starting point for modulator example from ESS requirements RFQ+DTL 352MHz Spoke 352MHz Elliptical 704MHz low-Beta Elliptical 704MHz high-Beta Max power/klystron2.6MW400kW700kW1100kW Min power/klystron1.2MW130kW65kW700kW Beam time2.9ms Cavity fill+empty time 0.3ms + 0.3ms Repetition rate14Hz Klystron efficiency58%<60% 60% Phase precision 0.5° Nb of klystrons Max energy of arc20 J

Uppsala 14/12/11 - Modulators 4 Pulsed v CW Why a pulsed modulator? LEP 4MW CW Modulator: 250 m 3 (4 MJ/s) LINAC4 5MW Pulsed Modulator: 7 m 3 (20kJ/s) ESS 4.5MW Pulsed Modulator: ~35 m 3 (>200kJ/s)

Uppsala 14/12/11 - Modulators 5 Pulsed Modulators Can be separated into three principle sections AC/DC ‘Charger’ Energy storage Pulse Forming system

CLIC DB Klystron Modulators 6 Pulsed Modulators Pulse definition t_beam + t_fill + t_empty t_set for LLRF and modulator t_rise and t_fall Sources of energy loss: reset of pulse transformer (if used)

Uppsala 14/12/11 - Modulators 7 Pulsed Modulator Efficiency Useful flat-top Energy 4.5MW*3.5ms = 15.8kJ Rise time energy 4.5MW*300μs*1/3= 0.45kJ Fall time energy* 4.5MW*300μs*1/3= 0.45kJ Set-up time energy4.5MW*300μs = 1.35kJ Pulse efficiency0.88 Pulse forming system efficiency0.98 Charger efficiency 0.96 Power efficiency 0.94 Overall Modulator efficiency80% Modulator can optimize electrical systems however greatest efficiency savings from RF pulse optimization (eg klystron efficiency, control overhead, setup time, etc) *Does not include pulse transformer magnetizing energy

Uppsala 14/12/11 - Modulators 8 Power from distribution network Modulator charging is usually completed before the output pulse generation. This will induce power fluctuations on the power network, affecting distribution power quality. A large modulator installation should implement a constant power load consumption with good power quality. Strategies for startup and shutdown should also be considered to limit load transients Pout_modulator Pin_modulator_typical Pin_modulator_ideal Pin_modulator_typical Pin_modulator_ideal

Uppsala 14/12/11 - Modulators 9 Reliability and availability For large installations, availability is an important criteria Reliability typically specified as Mean Time Between Failure (MTBF) Repair time defined as Mean Time To Repair (MTTR) Availability as a function of reliability and time to repair: Modular systems may have lower MTBF but higher availability due to redundant architectures that significantly reduce the MTTR. In many cases, repair can be scheduled for a future date. Repair time can be significant for high voltage systems unless considered at the design stage (oil, large components, etc).

Uppsala 14/12/11 - Modulators 10 Modulator specification 1.Maximise charger efficiency and power quality Objective: better than 95% efficiency with near unity power factor and low harmonics 2.Minimise rise, fall and settling time Objective for 3.5ms pulse: less than 750us total for rise, fall and setup time 3.Maximise operational reliability and availability Objective: design for 99.8% availability (1hour intervention every 14 days) 4.Design for good pulse-to-pulse voltage reproducibility Objective: 100ppm (?) from pulse n-1 to pulse n (RF feedback gives long term performance) 5.Consider integration issues (machine layout, maintenance, etc)

Uppsala 14/12/11 - Modulators 11 Modulator specification Other important specifications to consider 1.Voltage ripple requirement will come from LLRF requirements Requires to be specified in frequency and amplitude (typically 0.1%) 2.Parallel connection of klystrons Verify sharing/balancing for several klystrons per modulator However already done in SNS using LLRF 3.Operation over a wide power range required Pmax ≥ 10x Pmin Light loading may preclude some topologies (eg bouncer) Connection of systems in parallel will resolve most issues

Uppsala 14/12/11 - Modulators 12 Modulator for RF Powering The following parameters follow from RF specification… example from ESS requirements Max power/modulator4.5MW Min power/modulator65kW ? Nominal voltage110 kV Flat top (fill + beam time + empty)3.5 ms Rise/fall time0.3 ms / 0.3ms? Repetition rate14Hz Droop 1% ? Voltage Ripple (magnitude and frequency)0.1% above 10kHz ? Nb of modulators~110 Max energy delivered to arc<10 J MTBF hrs ? Availability99.8 % ?

Uppsala 14/12/11 - Modulators 13 Modulator topology overview 5 topologies highlighted Topologies known to already operate with long pulse applications Future topologies thought to be well adapted to long pulse applications Assessment of some advantages and disadvantages of each topology Some topologies in the market are a mix of more than one concept I do not claim this list is exhaustive!

Uppsala 14/12/11 - Modulators 14 Bouncer and pulse transformer Charger: Classical resonant topology for charging the capacitor. Storage capacitor: The pulsed power is collected by an intermediate storage capacitor before being transmitted through the switch. Switch: High voltage, high current solid state switch. Pulse transformer: The pulse is generated at high current lower voltage at the primary side of the pulse transformer. Voltage droop compensation: Voltage compensator for the droop occurring in the storage capacitor during the pulse discharge.

Uppsala 14/12/11 - Modulators 15 Bouncer and pulse transformer Used by: Fermilab (Tevatron) CERN (LINAC4) Pulse transformer size scales with voltage and pulse width Primary voltage and current is mainly determined by switch technology, capacitor volume, transformer design Oil volume (transformer): ~800 litres

Uppsala 14/12/11 - Modulators 16 Bouncer and pulse transformer Advantages The power circuit is simple and reliable. All electronic active devices are at medium voltage level No voltage ripple on the flat-top Disadvantages Large pulse transformer and LC resonant bouncer volume for long pulses Limited sources for pulse transformer Slow rise and fall times Reverse voltage on the klystron to demagnetize the pulse transformer limits the duty cycle

Uppsala 14/12/11 - Modulators 17 Direct switch Charger: Very high voltage capacitor charger. Storage capacitor: Capacitors rated for the full voltage. Very high energy storage. Switch: Full rated voltage slid-state switch. Voltage droop compensation: None. The droop is determined by the capacitor bank size.

Uppsala 14/12/11 - Modulators 18 Direct switch Other accelerator users RAL APS Modulator oil volume: ~2000 litres

Uppsala 14/12/11 - Modulators 19 Direct Switch Advantages Fast rise/fall times Large range of pulse lengths and pulse repetition rate No reverse voltage (no pulse transformer) Relatively compact due to most parts being in oil No voltage ripple on flat top Disadvantages All components immersed in oil, problematic for operation Reliability in arc is entirely dependent on switch 100kV IGBT switch assembly required (not widely available)

Uppsala 14/12/11 - Modulators 20 Interleaved DC/DC Charger: Distributed across many smaller modules. Connected to multi- secondary winding interface transformer (also possible to have multiple primaries) Storage capacitor: Smaller ~1kV rated capacitors distributed across many modules. Switch: Standard solid-state switch. Voltage droop compensation: Can operate without compensation, or by using a pulse-modulation technique to obtain desired output characteristics.

Uppsala 14/12/11 - Modulators 21 Interleaved DC/DC Used by DESY (XFEL) Oil volume (transformer): ~800 litres

Uppsala 14/12/11 - Modulators 22 Interleaved DC/DC Advantages Active demagnetization of the pulse transformer possible Intrinsic active droop compensation Active klystron arc extinction possible All electronics at medium voltage Disadvantages HF ripple in flat-top Thermal cycling of semiconductors in hard switching Two special transformers (input and output) Large pulse transformer for long pulses Limited sources for pulse transformer

Uppsala 14/12/11 - Modulators 23 Multiple Resonant DC/AC/DC Charger: Distributed across many smaller modules. Storage capacitor: Smaller capacitors distributed across many modules. Switch: Standard solid-state switch. Voltage droop compensation: Flat-top control is inherent in topology

Uppsala 14/12/11 - Modulators 24 Multiple Resonant DC/AC/DC Used by SNS Oil volume (transformer): not yet known

Uppsala 14/12/11 - Modulators 25 Multiple Resonant DC/AC/DC Advantages All electronics at medium voltage Standard semiconductor switches No demagnetization required Intrinsic active droop compensation In klystron arc the resonant circuits become de-tuned Modular Disadvantages High frequency transformer design difficult Reactive power in H-bridges (some over-rating required) Relies on IGBT soft switching but this is complex Ripple on flat-top – to check if it meets reproducibility requirement

Uppsala 14/12/11 - Modulators 26 Solid State Marx Developed for ILC project Several years of development already completed Charger: Normally main charger for all systems. Storage capacitor: Capacitors distributed across many modules. Switch: Standard solid-state switch in each module. Voltage droop compensation: Flat-top control using switch-mode stage – creates a low amplitude ‘sawtooth’ waveform

Uppsala 14/12/11 - Modulators 27 Solid State Marx Used by SLAC (advanced prototype only) Oil volume: none 120 kV, 140A, 1.6 ms, 5 Hz

Uppsala 14/12/11 - Modulators 28 Solid State Marx Advantages No oil or pulse transformer Standard semiconductor switches Intrinsic active droop compensation Low arc energy due to fast turn-off Modular and fault tolerant solution Development almost complete Potential to license design from SLAC? Disadvantages Fairly complex Electronics are at high voltage (EMC issues) A lot of silicon (cost?) To be validated for (even) longer pulses

Uppsala 14/12/11 - Modulators 29 Cost Comparison See some cost scaling rules presented previously The cost of each solution should align for industrial production quantities Resonant topology has additional R&D costs compared to other solutions Modular systems may benefit additionally from increased quantities TopologyComment BouncerConventional technology; Pulse transformer; Direct SwitchSimplest solution; Proprietary technology; Interleaved DC/DCModular; Conventional semiconductors; Special transformers; Resonant DC/AC/DCModular; Conventional semiconductors; Special transformer; MarxModular; Conventional semiconductors;

Uppsala 14/12/11 - Modulators 30 ‘Spoke’ Modulators Tetrodes and IOTs are being considered for the lower power spoke cavities, potentially several powered from the same modulator Modulators for these generally use DC electrical power The power source is essentially the front half of a pulsed modulator (without pulse forming system) IOT’s now widely used in TV signal transmission Associated CW technology well proven IOT’s and tetrodes typically operate between 10kV and 50kV Should be straightforward to find technical solution for powering of tetrodes/IOTs However important to ensure reliability and availability (and hence modularity) is considered as part of the technical solution H.V supply e.g. -36 kV / 3.2 A Grid supply e.g. 150 V / 250 mA Heater supply e.g. 12V / 25 A RF OUT RF IN + _ A P Sanchez, ALBA Typical IOT Electrical Circuit

Uppsala 14/12/11 - Modulators 31 Modulator R&D As with any project, several phases to consider Ensure you get what you want! Project management is a critical aspect to develop appropriate specifications and make prudent compromises where necessary Develop specific technologies (eg transformers, inverters, etc) Requires knowledge of HV, electromagnetics, semiconductors,… Domain for experts: designers, teams and companies Validate full scale prototype Requires general knowledge of complete RF system Develop system level electronics and software Initial modulator testing on a passive High Voltage load Subsequent testing on a klystron (without cavity) Final validation in compete mock-up

Uppsala 14/12/11 - Modulators 32 In-house v commercial development In-house development allows facility to confidently maintain and operate equipment for the long term Enables personnel to be highly knowledgeable of technology in operation Requires investment in people and test facilities Commercial development is protective of intellectual property and prefers ‘black box’ approach Can be problematic for long term operation of specialized equipment However ability to optimize design and cost for production facilities LHC R&D and production model Impose topology (you need to know which one…) Allow companies to develop specific (optimized) solutions Competitive tender on validated prototypes All design data made available to buyer to allow long term support

Uppsala 14/12/11 - Modulators 33 Modulator and RF optimization Further activity is encouraged to fully identify the complete RF system At the design stage, the transfer function for the RF High Power system should also include a model of the klystron and modulator Allows certain specifications to be refined and optimized Typically attention is given to the RF resonant frequency However the modulator and other components will generate perturbation (if any) in a lower frequency band Some activity is starting at CERN and SLAC to identify LINAC4 and CLIC type klystron structures Every RF system is likely to be different

Uppsala 14/12/11 - Modulators 34 CERN CLIC Modulator Development Challenging project with stringent specs for modulators Some issues common to other accelerator projects R&D will be conducted in several centers, coordinated by CERN Intend to evaluate at least 2 different topologies as part of TDR phase ~1600 klystron Modulators required here 2-3 years of R&D at component and sub- assembly level 2-3 years to construct and test full scale prototypes Regular workshops with collaboration participants to share and direct progress

Uppsala 14/12/11 - Modulators 35 Modulator development efforts The following labs have made, or are making, progress on modulator technology SLAC (ILC) CERN (CLIC) DESY (XFEL) Los Alamos (SNS) While each project has specific requirements, there are many common technical challenges The many large linear collider studies ongoing today would benefit from a coordinated approach to the modulator development The ESS requirements for long pulse modulators is larger than all previous projects combined Opportunity to interact with international modulator community Needs an ESS representative/team to follow progress

Uppsala 14/12/11 - Modulators 36 Conclusion The ESS modulator requirements represents a greater financial investment than the power systems for the entire LHC! The LHC powering was a 10year project from conception to installation Due to good concept and design, excellent availability of power systems Experience from other large installations, such as SNS, identify the modulator as one of the key reliability/availability drivers Development time for new systems is significant Both SNS and ILC developments for long pulse modulators have taken >5yrs The modulators are a significant cost driver in long pulse LINACS It is in the interest of large LINAC projects to have a dedicated modulator team The proposed strategy for initial construction with a conservative modulator design seems sensible For subsequent phase, recommend considering 2 (or more) alternative topologies

Uppsala 14/12/11 - Modulators 37