Bituminous Stabilized Materials Guideline: Inception Study Project Funded By: Gautrans Sabita.

Slides:



Advertisements
Similar presentations
PCBs Total Maximum Daily Loads San Francisco Bay Fred Hetzel SFB-RWQCB May 13, 2003.
Advertisements

A I R T R A F F I C O R G A N I Z A T I O N Future Communications Study Technology Assessment Team: Suggested Phase III Activities Presented at ICAO ACP.
Organisation Of Data (1) Database Theory
ROAD PAVEMENT FORUM MAY 2007 Technical Guideline: The use of Modified Bituminous Binders in Road Construction TG1: 2 nd Edition – May 2007.
Product Properties, Classification, Selection and Application
HMA permanent deformation study: Progress report to the RPF 7 May 2008 Erik Denneman.
Pavement Design Session Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Full-Depth Reclamation Using a Cement Slurry Spreader Attached to a Ready Mixed Concrete Truck W. Spencer Guthrie, Ph.D., Associate Professor Charles A.
Binder Distributors Task Team Feedback. Progress since May Resolution #7 –To review the process of binder distributor certification as fit for purpose.
Chemically Treated Subgrade Stabilization. ODOT Geo/Hydro/HazMat Conference Chemically Treated Subgrade Stabilization ODOT Pavement Services Rene’ A.
Bituminous Stabilized Materials Guideline RPF Feedback : K Jenkins May 2006.
Bituminous Stabilized Materials Guideline Project Initiated By: Gautrans Sabita.
Interim Guidelines: The Design and Use of Foamed Bitumen Treated Bases Fenella Long Road Pavements Forum November 2001.
A SEMINOR ON SOIL STABILISATION Prepared by D.ARUNA.
1. Identify Stakeholders 2. Establish the Criteria 3. Identify Potential Sites 4. Initial Screening/ Evaluations & Short List 5. Specific Site Study 6.
Revision of the South African Pavement Design Method Louw Kannemeyer.
Status Report on Standard Specifications and Codes of Practice Department of Transport RPF November 2004.
COTO Road Materials Committee (RMC) Towards National Specifications Road Pavement Forum 07 November 2006 Elzbieta Sadzik.
Field Validation and Parametric Study of a Thermal Crack Spacing Model David H. Timm - Auburn University Vaughan R. Voller - University of Minnesota Presented.
ROAD PAVEMENT RESEARCH ADVISORY COMMITTEE BMJA Verhaeghe 12 MAY 2005 NINTH MEETING OF THE ROAD PAVEMENTS FORUM (RPF)
Road Pavements Forum Structural Design Working Group Revision of the South African Flexible Pavement Design Method 7 November 2006 Pretoria H L Theyse.
Technical Recommendations for Highways No 12 TRH 12
Kim Jenkins SANRAL Chair in Pavement Eng
A Protocol for the establishment and operations of LTPP sections Prepared for Gautrans by CSIR, Transportek.
Overview of projects undertaken by CSIR BE Prof Wynand JvdM Steyn CSIR Built Environment TUT.
Paris Project Meeting January 2012 Item – Statistics Objective 5 B. Proia With financial support from Criminal Justice Programme 2008 European Commission.
OPERATIONAL GUIDELINES Ensuring Ownership of PARSEL by Partners.
Cement stabilization of road pavement materials. OBJECTIVE T o investigate the impact of the new range of cements manufactured under the SABS EN
DR O.S ABIOLA DEPARTMENT OF CIVIL ENGINEERING UNIVERSITY OF AGRICULTURE, ABEOKUTA CVE 409 HIGHWAY ENGINEERING.
Road Engineering Todays lecture Introduction Pavement design Project - Road 34.
In Situ Stabilization of Pavement Base Courses Roads Pavement Forum Thursday, May 17, 2001.
CSIR-UCB research programme Road Pavements Forum 14 November 2001.
X:\Presentations\FBworking groupRPFnov02.ppt DEPARTMENT OF TRANSPORT & PUBLIC WORKS FOAMED BITUMEN WORKING GROUP Road Pavement Forum- Nov 2002 E. SADZIK.
Interim Guidelines: The Design and Use of Foamed Bitumen Treated Materials Kim Jenkins, Dave Collings Hechter Theyse, Fenella Long Road Pavements Forum.
G AUTRANS DEPARTMENT OF PUBLIC TRANSPORT, ROADS & WORKS 1 GAUTRANS APT ELZBIETA SADZIK MAY 2002.
PROGRESS OVERVIEW: COLTO STANDARD SPECIFICATIONS TMH AND TRH DOCUMENTS OTHER DOCUMENTS.
Experience you can trust. Phase 1: Cataloguing Available End-Use and Efficiency Load Data September 15, 2009 End-Use Load Data Update Project.
Project Level Traffic Forecasting Summary of Practices from other States TNMUG March 6, 2008.
Carousel Tract Environmental Remediation Project Update by Expert Panel to Regional Board July 11, 2013.
GAUTRANS DEPARTMENT OF PUBLIC TRANSPORT, ROADS & WORKS APT STEERING COMMITTEE ROAD PAVEMENT FORUM 26 November 2003 Elzbieta Sadzik.
Project Constraints Maximum Expected Traffic Load: 2 twenty-ton, 2-axle trucks per week Channel Size: app. 6 ft wide x 5.5 ft deep Available Reinforcement.
The Research Process.  There are 8 stages to the research process.  Each stage is important, but some hold more significance than others.
Warren Township Study To Examine Enrollment Project (STEEP) Project Plan & Criteria High Level Timeline Sub-Committee Goals & Deliverables Revised October.
Power Quality: A Nonlinear Adaptive Filter for Improved Power System Operation and Protection Research Overview: Focuses on the application of a new algorithm.
Asphalt Academy Feedback to RPF 23 November 2005.
Fashion and Textile Technology Unit Assessment National 3 to National 5.
Pavement Research Advisory Committee (PRAC) 13 th Meeting of the RPF 8 May 2007.
R52 Rustenburg-Koster Road
URBAN STREAM REHABILITATION. The URBEM Framework.
Foamed Asphalt Working Group Road Pavements Forum 13 November 2001.
AAPA 2012 Study Tour to Europe – Long life pavements v1 Long Life Pavements.
1 INTERIM REPORT ON SHA DEVELOPMENTAL WORK 7 th Meeting of Health Accounts Experts and Correspondents for Health Expenditure Data Paris, September.
Grand Palm Hotel and Casino Gaborone, Botswana 15th to 19th Sept 2007 CAPSA 07.
Road Pavement Forum May 2006 Technical Guideline: The use of Modified Bituminous Binders in Road Construction (TG 1: 2001)
Road Pavement Forum 11 May 2006 Elzbieta Sadzik APT Steering Committee.
NC Local Safety Partnership Program Implementation.
Full Depth Reclamation
HOLD-TIME STUDIES.
Julia Kintsch, ECO-resolutions Paige Singer, Rocky Mountain Wild
Feasibility Study to Evaluate Brick Aggregates and Foam Bitumen treated RAP for Pavement Design and Construction of NH-44 in Tripura.
Earthwork operations- are those that involve the earth in its natural form, which need to be undertaken before the actual construction of the pavement.
HDM-4: The Road Deterioration and Maintenance Effects Study
API SC 10, Work Group 3 Update:
Transportation Engineering-II
Effect of Removing the Amelioration Period on Design & Construction of Lime Stabilised Subgrades in Local Government Scott Young BE (Hons), RPEng (Civil),
1. You work for the University of Tawara and are going to create a database to analyse data about student courses and accommodation. Dates are to be stored.
Calculating Dimensions for a Typical Pavement Section using 1993 AASHTO Flexible Pavement Design Guide.
D10 REVIEW PROCESS April-June 2014: February 2015:
URBAN STREAM REHABILITATION
Context Sensitive Solutions in Massachusetts: “Communities First”
Presentation transcript:

Bituminous Stabilized Materials Guideline: Inception Study Project Funded By: Gautrans Sabita

Background ETB Materials; Two guidelines exist:  Sabita Manual 14 (1993)  Sabita Manual 21 (1999) Foamed Bitumen Materials:  TG2 Interim Guideline Guidelines widely used, but there is a need to: Modernize Improve Create a single, combined guideline

Main Deficiencies: Mix Design Lack of a suitable Curing Method More appropriate tests to assess:  Flexibility  Shear Strength  Durability

Main Deficiencies: Structural Design Conservative structural designs (catalogue and design charts) Questions about 2-Phase modelling Need to incorporate curing effects Limited database used for development Lack of validation using long term field data

Refinement and Guideline Compilation Project Structure Phase 2: Mix Selection Criteria Phase 3: Mix Design Issues Phase 4: Structural Design Issues Phase 5: Construction Issues Phase 5: Guideline Finalization Mix Design (K Jenkins) Structural Design (F Long) Phase 1: Inception Study

Inception Study Objectives: Mix Design Identify Durability Test and gather curing data Investigate Triaxial Testing protocols Investigate Strain-at-Break Plan and re-direct further activities

Inception Study Objectives: Structural Design Gather available performance data (LTPP & HVS) Analyze and identify trends (if any!) Assess key deficiencies in available information Plan and re-direct further activities

Progress to Date: Structural Design 126 Roads appeared on radar 104 Emulsion Treated Base 22 Foamed Bitumen Only some roads suitable to study  Duplication amongst reported projects  Many roads recently constructed  Some very low traffic and/or no data  Urban legend

Some Best Candidate Projects N12-19 (1974) N2-16 (1982) N3-4 (1988) N4-5X (1997) N4-1 (1997) MR27 (1988) N1-1 (1984) N1-13 & 14 (1980) P504 (1995) Same-Himo Project (1992, LTPP study) N7-7 (1987) P24-1 (1999) ± 20 Promising projects in total HVS Tests: N3-4, Mooi River N2-16, East London P9-3 Petrus Steyn P243-1 Vereeniging N7, near CT N12-19 (current)

Classification Approach ETB/Foam source material ETB/Foam stability & flexibility properties Support Layer quality and class Subgrade quality and class Maximum deflection range before/after construction Standard axle range accommodated in field or HVS Develop a design approach that relies on measurable, non-ambiguous parameters Ensure transparent, straightforward validation of recommended designs For each project, assess and classify: Vision: