Fraser Centre State College, PA Tyler Strange Structural Option Consultant: Dr. Thomas Boothby April 13, 2011 Tyler StrangeStructural Option Fraser Centre.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
CE A434 – Timber Design Structural Behavior.
MICA GATEWAY RESIDENCE BALTIMORE, MARYLAND SCOTT MOLONGOSKI SENIOR THESIS STRUCTURAL OPTION ADVISOR: PROFESSOR SUSTERSIC.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Integrated Civil Engineering Design Project (Building Structure Design Example) CIVL 395 HKUST By : Ir. K.S. Kwan Date: 4/07.
Slab Form Design.
High Rise Structural Systems
Hershey Academic Support Center Structural Option Shawn Jones Building Analysis of the Hershey Academic Support Center Hershey, PA Shawn Jones Structural.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
Michael Wiegmann BAE Structural Option Senior Thesis April 15,2008.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Duquesne University Forbes Expansion
University of Palestine
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Mathew Nirenberg AE Senior Thesis Structural Option.
Nicole C. Drabousky Pennsylvania State University Architectural Engineering Structural Option Spring 2006 Senior Thesis Presentation.
Seth M. Moyer Office Buildin g Sayre, PA Structural OptionAdvisor: Dr. Thomas E. Boothby.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Mountain Hotel Urban Virginia Senior Thesis 2013 Faculty Advisor: Professor Kevin Parfitt Benjamin Borden Structural Option.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
NEW VIRTUA VOORHEES HOSPITAL Voorhees, NJ Paul Stewart Structural Option Senior Thesis Presentation 2010 The Pennsylvania State University.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
 Building Background  Building Structural System  Problem Statement  Proposed Solution  Structural Investigations  Architectural Impact  Sustainability.
Chapter 13 Concrete Form Design. SLAB FORM DESIGN Method WALL AND COLUMN FORM DESIGN DESIGN OF LATERAL BRACING.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Hunter Woron Spring 2012 Structural Professor Parfitt.
PCI 6 th Edition Lateral Component Design. Presentation Outline Architectural Components –Earthquake Loading Shear Wall Systems –Distribution of lateral.
Structural Systems Design of the Lincoln Fire Department Headquarters Michelle Burback Structural Engineering Capstone and Senior Honors Project.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
North Shore Equitable Building
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Ryan Johnson - Structural Option
Structural Technical Report #4: Lateral System Analysis Study
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option

Introduction The Biomedical Research Building (BMR) is located in Hershey, Pennsylvania sq. ft, in 7 stories above grade Built between Cost $49 million Used a Bid-Build project delivery method Used for Education and Laboratory space Table of Contents Introduction Architecture Existing Structure Process Cost Comparison Conclusion

Introduction Site soil is considered poor, and as such, columns were designed as pinned at the bottom. Goal of this proposal is to determine if a steel structure is more cost effective than a concrete structure. Table of Contents Introduction Architecture Existing Structure Process Cost Comparison Conclusion

Architecture Façade of the BMR consists of long horizontal concrete and limestone slabs, and black glazing Façade designed to relate to buildings already existing on campus Cylinder and Planar wall on corners add to the otherwise flat building Table of Contents Introduction Architecture Existing Structure Process Cost Comparison Conclusion

Existing Structure The BMR is a monolithic concrete structure, using a two-way flat plate system with the average column size about 22” by 22” Building sits on a deep foundation system of caissons 3 to 7 feet in diameter Table of Contents Introduction Architecture Existing Structure Process Cost Comparison Conclusion

Process Assumed gravity loads were to be: 45 PSF dead 40 PSF snow 20 PSF superimposed 125 PSF live core, 100 PSF live offices Typical Floor Plan Table of Contents Introduction Architecture Existing Structure Process Gravity Cost Comparison Conclusion

Process Dead Load is from 3.5” slab (t = 3”) using 1.0CSV Conform decking from Vulcraft assuming 5’ joist spacing. Gives 45 psf, plus 20 psf superimposed for 65 psf dead. Preliminary Layout Table of Contents Introduction Architecture Existing Structure Process Gravity Cost Comparison Conclusion

Process Using 1.2D + 1.6L, loading is 278 PSF core. Loading for joist is 1.4 KLF with 5’ tributary width. Requires a W14x22 joist size. Deflection under this loading is.63”, satisfying L/360. Preliminary Layout Table of Contents Introduction Architecture Existing Structure Process Gravity Cost Comparison Conclusion

Process Beam loading with a tributary width of 21’ is 5.8klf. Braced at every 5’, under this load, requires a w12x120. Beams deflects.47”, satisfying L/360. Preliminary Layout Table of Contents Introduction Architecture Existing Structure Process Gravity Cost Comparison Conclusion

Process Gravity columns have a tributary area of 21’ by 33’. Total of 693 sq ft. Due to the large live load, live load reduction does not apply to members supporting only one floor, and those that do, maximum of 20% reduction. Preliminary Layout Table of Contents Introduction Architecture Existing Structure Process Gravity Cost Comparison Conclusion

Process Axial load per floor is Kips. After LLR, load is 165 kips. With alternate loading of bays, and axial loads, gravity column sizes range from W14x90 to W14x159. Gravity Column Shapes Table of Contents Introduction Architecture Existing Structure Process Gravity Cost Comparison Conclusion

Process Analysis was repeated for the office spaces, and no changes were made. Column sizes were the same aside from the third story where a reduction to a W14x132 could have been made, but it was decide to keep it uniform with the core. Preliminary Layout Table of Contents Introduction Architecture Existing Structure Process Gravity Cost Comparison Conclusion

Process Goal of Lateral Design was to keep the drift of the building under 2.6”, or H/400, with H = 88’ Hall/office spaces to have minimal drift as they attach to an adjacent building. Initial Layout Table of Contents Introduction Architecture Existing Structure Process Gravity Lateral Cost Comparison Conclusion

Process Initial Lateral design consisted of only Moment Frames. Frames were assumed to be equally stiff, and checked via RAM. Equal stiffness allowed for individual frame design. Initial Layout Table of Contents Introduction Architecture Existing Structure Process Gravity Lateral Cost Comparison Conclusion

Process Using ASCE 7-10, Wind loads were derived. Loads were then divided amongst the moment frames. Portal method was used to estimate loads. Wind Loads Table of Contents Introduction Architecture Existing Structure Process Gravity Lateral Cost Comparison Conclusion

Process Loads from both lateral and gravity forces were combined using interaction equations, including biaxial forces from overlapping lateral frames. Drifts from the initial design were too high, and frames were rearranged, and braced frames were added. Final Frame Design Table of Contents Introduction Architecture Existing Structure Process Gravity Lateral Cost Comparison Conclusion

Process Loads from both lateral and gravity forces were combined using interaction equations, including biaxial forces from overlapping lateral frames. Drifts from the initial design were too high, and frames were rearranged, and braced frames were added. Biaxial Lateral Columns Table of Contents Introduction Architecture Existing Structure Process Gravity Lateral Cost Comparison Conclusion

Process Braced Frames were designed in order to decrease the drift caused by torsion. A specific rigidity was found in order to move the center of rigidity to the center of mass, and braces were sized in order to acquire this rigidity in order to decrease torsional effects. Braced Frame Table of Contents Introduction Architecture Existing Structure Process Gravity Lateral Cost Comparison Conclusion

Process Problem with this braced frame being placed at the north side, is that the braced frame will be placed directly in front of the glazing. Braced Frame Table of Contents Introduction Architecture Existing Structure Process Gravity Lateral Cost Comparison Conclusion

Process Loads from both lateral and gravity forces were combined using interaction equations, including biaxial forces from overlapping lateral frames. Drifts from the initial design were too high, and frames were rearranged, and braced frames were added. Braced Frame Table of Contents Introduction Architecture Existing Structure Process Gravity Lateral Cost Comparison Conclusion

Process Braced Frames were placed in order to not block entrances into maintenance shafts Halls go through center bay Braced Frame Table of Contents Introduction Architecture Existing Structure Process Gravity Lateral Cost Comparison Conclusion

Process Overturning was checked, and was not an issue in either direction under controlling loads of either wind or seismic. Overturning Tables Table of Contents Introduction Architecture Existing Structure Process Gravity Lateral Cost Comparison Conclusion

Process Braced Frames were placed in order to not block entrances into maintenance shafts Halls go through center bay Final Frame Design Table of Contents Introduction Architecture Existing Structure Process Gravity Lateral Cost Comparison Conclusion

Cost Comparison Original Plan costs $49 million Proposal costs $.... million Calculations Table of Contents Introduction Architecture Structure Process Cost Comparison Conclusion