Verify Isolation before work begins and use the specified life protecting equipment Isolations, Mechanical & Electrical, shall be applied and recorded.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Lockout/Tagout Awareness Training
Basic safety rules and procedures for controlling hazardous energy
Lockout/Tagout Training: 29 CFR Lockout Tagout Standard
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
1 Smoking is dangerous, it can cause fire in the presence of gas, flammable materials, etc. Smoking is only allowed in the Smoking Designated areas. Any.
Lock Out/Tag Out Training Lock-Out/Tag-Out OSHA Definition. Lockout/Tagout (LOTO) refers to specific practices and procedures to safeguard employees.
Today’s Meeting There are approximately 25 people killed by electricity per year in Australia (average for the last 7 years), 700 people are hospitalised.
LOCKOUT TAGOUT Introduction Each year nearly 150 people die because there was a failure to control energy.
Two-mode Safety and Battery System Service
De-energization and Lockout
General Electrical Safety. Why is it so important to work safely with or near electricity? The electrical current in regular businesses and homes has.
Introduction Most accidents are caused by the uncontrolled release of hazardous energy. Many of these accidents can be prevented by proper lock-out/tag-out.
Work with a valid work permit when required
1 The purpose is to prevent falls and reduce the consequences if a fall occurs when Working At Height. Use fall protection equipment when working outside.
Presented by Environmental Health and Safety
Lockout and Tagout.
THE INTERNATIONAL SOCIETY OF FIRE SERVICE INSTRUCTORS Electronic INSTRUCT-O-GRAM Program Lockout / Tagout Policy.
Lockout/Tagout Authorized Employee. What Is Hazardous Energy? –Often invisible –Can be hydraulic or mechanical –Live or stored –Moving machine or equipment.
Controlling Hazardous Energy
MNM 30 CFR Standards Review Clarification of eight standards: 30 CFR §§ 56/ CFR §§ 56/ CFR §§ 56/ CFR §§ 56/
Obtain authorization before entering a confined space
1 When entering a confined space Before and during normal working in a Process or Hydrocarbon Area When breaking containment on a process system When hot.
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Isolation “Imagine yourself performing maintenance inside of a machine and suddenly,
Lockout - Tagout Control of Hazardous Energy CFR
1 Medical Equipment Safety Orientation to Laboratory Safety.
Health and Safety. The Health and Safety at Work Act 1974 An Act to make further provision for securing the health, safety and welfare of persons at work,
Lockout/Tagout Affected Employees. © Business & Legal Reports, Inc Session Objectives You will be able to: Recognize hazardous energy sources Carry.
Lockout/Tagout Authorized Employee Slide Show Notes
NWACC Business & Industry Workforce Development Institute J- 1 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) FOR GENERAL INDUSTRY.
/0309 Copyright ©2003 Business and Legal Reports, Inc. BLR’s Safety Training Presentations Lockout/Tagout Refresher 29 CFR
Lockout/Tagout for Affected Employees Understand the Basics.
Lockout/Tagout Training Division of Facilities Construction and Management 2001.
Safety on Call LOCKOUT / TAGOUT. Safety on Call WHAT IS LOCKOUT/TAGOUT? A method of keeping equipment from being set in motion and endangering workers.
Copyright  Progressive Business Publications Electrical Safety.
Control Of Hazardous Energy
CONTROL OF HAZARDOUS ENERGY. Types of Energy To Be Controlled  Kinetic – Energy of motion  Potential – Energy of position  Electrical – From generated.
Health & Hygiene/ELB Sample LOCKOUT/TAGOUT “APPROVED” TRAINING.
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
Lockout - Tagout Control of Hazardous Energy OSHA Standard
Safety Training Presentation No 3 Electrically isolate and lock off when power is not required and when working close to unguarded machinery V5-12 August.
1  Confirm if a Safe Journey Plan is required before starting the journey.  Discuss the Safe Journey Plan with the Journey Manager.  Understand the.
1 Always wear your seat belt correctly when driving or as a passenger in a vehicle. Never remove the seatbelt until the vehicle has come to a complete.
Lockout/Tagout.
Basic Lockout Guidelines
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
Electrical Safety, Subpart K
An introduction to… Lockout Tagout. Aim Every year thousands of workers get killed or injured while performing repairs or maintenance on industrial equipment.
Procedures for work on Fixed Electrical Installations Toolbox Talk 2: Duties of Staff and Contractors.
Confined Spaces 29 CFR is the OSHA regulation that requires employers to protect employees in general industry from the hazards of entering a.
© BLR ® —Business & Legal Resources 1408 Lockout/Tagout Authorized Employee.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
LOCKOUT – TAGOUT TRAINING PROGRAM. Lockout/Tagout + The OSHA Standard for the Control of Hazardous Energy (Lockout/Tagout) 29 CFR covers the.
Striving For Safety Excellence HunterDouglas Corporate Environmental, Safety, Risk Management Lock Out Tag Out Affected Employees.
Lockout/tagout for authorized employee
Lockout Tagout Program
Energy is a good servant but a cruel master.
Lock Out & Tag Out.
DESCRIPTION AND GUIDE TO OPERATIONS
Confined Spaces 29 CFR is the OSHA regulation
Electrical Safety Equipment
Personal Protective Equipment
Control of Hazardous Energy
Follow the rules to save a life
Always verify isolation before starting any electrical job!
LOCKOUT/TAGOUT By: Kory Hildebrand.
Presentation transcript:

Verify Isolation before work begins and use the specified life protecting equipment Isolations, Mechanical & Electrical, shall be applied and recorded before any work is started. Removal of the isolations shall also be checked and recorded on completion of the work. To comply with this rule ensure that: To comply to this Rule always ensure that Required level of isolation has been identified before the work is started (when Permit to Work raised) Isolation is compliant with the relevant procedures All isolation are recorded on the appropriate Certificates and attach to the Permit to Work Mark the isolations on As-Built drawings and attach to the Permit Locked Open / Locked Close registers are maintained Isolations are witnessed and check against isolation plan Isolations are applied by competent personnel Isolations are proven before the work site is released and work started Approval for any changes to isolation during execution of the work is obtained and recorded All isolations are removed and checked against the marked up As-Built drawings Pre start-up inspections is carried out

Verify Isolation before work begins and use the specified life protecting equipment Mechanical isolations shall comply with PR-1076 – Isolation of Process Equipment and be recorded on the Mechanical Isolation Certificate Electrical isolations shall comply with PR-1947 – Electrical Safety Rules and be recorded on the Electrical Isolation Certificate Locked Open and Locked Closed valves shall comply to PR-1086 – Locked Open / Locked Closed and Spectacle Blind Control and be recorded on the respective registers as well as on the Mechanical Isolation Certificate The ‘Pro-Lock’ system shall be used to secure valves that must not be operated when forming part of an isolation boundary

Verify Isolation before work begins and use the specified life protecting equipment Under normal circumstances ‘valves’ alone shall not be considered as ‘positive’ isolation for ‘major’ work on hydrocarbon systems. Double block and bleed isolation shall be used as a minimum isolation when swinging spectacle spades & blinds on ‘live’ hydrocarbon systems containing H2S. Actuated valves isolated in the fail safe condition shall have the motive energy source physically disconnected i.e. Air, hydraulics, electrical etc. For electrical isolation to be considered ‘positive’ either the control fuses should be removed or the circuit breaker ‘racked’ out. Positive isolation of a tank or vessel for entry requires all nozzles to be spaded or blinded.

Verify Isolation before work begins and use the specified life protecting equipment Control of Electrical Activities : All Activities conducted in electrical equipment that belong to PDO or under PDO premises are controlled by the following Electrical Safety Documents Electrical isolation/ De-isolation Electrical Permit To Work Limitation of Access Sanction For Testing

Verify Isolation before work begins and use the specified life protecting equipment Switching Procedures : No HV SWITCHING shall be carried out without the agreement of the Control Person (CP) In normal circumstances all HV SWITCHING shall be carried out only after a written APPROVED SWITCHING PROGRAMME has been agreed. The remote opening and closing of HV circuit breakers may be carried out by unaccompanied suitably authorized operators. All other HV SWITCHING shall be carried out by an AEP who shall be accompanied during the SWITCHING operations. If a CIRCUIT MAIN EARTH is to be applied using portable EARTHING leads then the AEP carrying out this SWITCHING shall be accompanied by a CEP. When operating pole mounted switchgear by mechanical means from ground level, the operator shall wear rubber gloves of an APPROVED type and an APPROVED safety helmet. Making LIVE or DEAD by signal or prearranged understanding after an agreed time interval is forbidden.

Verify Isolation before work begins and use the specified life protecting equipment Precautions to be taken before Working on or Testing High Voltage Apparatus: No person shall undertake any repairs, maintenance, alterations, cleaning or testing on HV APPARATUS until such parts of that APPARATUS are:- Switched off from all points of supply, made DEAD and proven DEAD ISOLATED and all steps taken to secure with SAFETY PADLOCKS from all points of supply. The keys for the SAFETY PADLOCKS shall be placed in a KEY SAFE or another APPROVED security method shall be used. Connected to EARTH at all points of disconnection from HV supplies to such APPARATUS or between such points and the points of work or testing. Screened where necessary to prevent DANGER and DANGER NOTICES attached. Released for work by the issue of an ELECTRICAL PERMIT-TO-WORK to a CEP who shall be accompanied by another CEP during the progress of the work. OR Released for testing by the issue of a SANCTION-FOR-TEST to an AEP who shall be accompanied by another AEP or CEP during the progress of the testing. And the person receiving the ELECTRICAL PERMIT-TO-WORK or SANCTION-FOR-TEST is made fully aware of the nature and extent of the work or testing to be done. Any work on LIVE HV conductors or insulators shall be carried out under the LIVE LINE WORKING Rules in Section 8.0 or LIVE LINE WASHING Rules in Section 9.0.

Verify Isolation before work begins and use the specified life protecting equipment Precautions to be taken before Working on or Testing Low Voltage Apparatus : No person shall carry out any repairs, maintenance, alterations or cleaning on LV APPARATUS until such parts of that APPARATUS are:- Switched off from all possible points of supply and made DEAD. ISOLATED from all possible points of supply by opening circuit breakers/switches and by removing fuses or links. The operating handles of these circuit breakers/switches shall have been, where practicable, locked in the 'open' position with SAFETY PADLOCKS or similar type locking devices and CAUTION NOTICES attached at all points of ISOLATION. Screened where necessary to prevent DANGER, and DANGER NOTICES attached to draw attention to LIVE APPARATUS near to the point of work. Proved DEAD with an APPROVED voltage testing device suitable for the rated voltage of the circuit. The voltage testing device shall be checked before and after use to check it is working correctly. EARTHED, where necessary, by an AEP, with LV EARTHS Released for work to the CEP when the above precautions are complete. The CEP who is to be in charge of the work, is made fully aware of the nature and extent of the work to be done, and understands the precautions that he and his WORKING PARTY shall take to avoid DANGER from LIVE APPARATUS

Verify Isolation before work begins and use the specified life protecting equipment Incident: Unconfirmed / Incorrect Isolation leading to Hydrocarbon Build-up in a Pipework In mid- 2010 an incident occurred in PDO during a shutdown which caused a ‘flash’ explosion in a pipe resulting in burning injuries to two workers. Although not the prime cause of the incident, incorrectly applied isolation did contribute to the nature of the incident by allowing hydrocarbon impregnated liquids to accumulate in the pipework. The incident and the subsequent investigation highlighted ‘shortfalls’ in PDO isolation control which have been corrected, effectively ensuring the chances of this type of incident happening in the future are much reduced.

Verify Isolation before work begins and use the specified life protecting equipment Supervisor Tips Pose Question to your group Allow 5 minutes for discussion on each Question Summarize what you have heard before moving to the next Question Split big groups up into smaller discussion teams Take your time Encourage everyone to take part Look for real examples from your own workplace Find and use real examples of incidents related to this rule from your site Link the discussion to real work on site involving the people in the tool box talk

Verify Isolation before work begins and use the specified life protecting equipment Question As the Permit Applicant you want to carry out work in the process area. When will you propose the isolations required to undertake the work? Prior to starting the work When the Permit is handed to the Area Authority for Validation When the Permit to Work is raised correct answer

Verify Isolation before work begins and use the specified life protecting equipment Single tight valve Double block and bleed Shutdown, depressurise and gas free first Question What type of isolation is required to be in place to swing spectacle blinds on a ‘live’ hydrocarbon systems containing H2S? correct answer

Verify Isolation before work begins and use the specified life protecting equipment Question ‘Positive’ electrical isolation requires: Turning off the electrical power Disconnecting the starter Removal of control fuses and / or racking out the circuit breaker correct answer

Verify Isolation before work begins and use the specified life protecting equipment Answer the following questions: What is a Safety Padlock ? What electrical document shall be used for work on isolated and earthed transformer ? What is an Electric Shock? How to protect from Electric Shock?