Where Innovation Is Tradition SYST699 – Spec Innovations Innoslate™ System Engineering Management Software Tool Test & Analysis.

Slides:



Advertisements
Similar presentations
Animal Tracking Component Private and State Animal Tracking Databases (ATD) Animal Trace Processing System (ATPS) National Animal Identification System.
Advertisements

What’s New for 2013 Steve Allen CEO, iDatix Corproation.
Test Automation Success: Choosing the Right People & Process
WP 2 Usability Attributes Affected by Software Architecture Deliverable D2 – Usability Patterns Presenter: Robert Chatley - ICSTM.
Innoslate™ Systems Engineering Management Tool Test and Analysis
Software Development Services
Alternate Software Development Methodologies
© 2005 by Prentice Hall Appendix 2 Automated Tools for Systems Development Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
Rational Requisite Pro Usage at NYSDOT BA CoP
Basic guidelines for the creation of a DW Create corporate sponsors and plan thoroughly Determine a scalable architectural framework for the DW Identify.
Trade Study Training Need and Goals Need Consistent methodologies and practices performing trade studies Pros/cons, advantages/disadvantages, customer/management.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Agenda Background Project Approach & Timeline
Project Management Methodology (PMM)
The Solution to Your Product Problems. Overview - What is PDS? ➲ Project Management System ➲ Web Based Easy to use Scalable ➲ Streamlined tools for software.
WRAP Technical Support System Project Update AoH Call October 19, 2005.
IS&T Project Management: Project Management 101 June, 2006.
Certified Business Process Professional (CBPP®)
Introduction to Software Testing
IS&T Project Management: How to Engage the Customer September 27, 2005.
MSF Testing Introduction Functional Testing Performance Testing.
Where Innovation Is Tradition SYST699 – Spec Innovations Innoslate™ System Engineering Management Software Tool Test & Analysis Aron Ceely Justin Mathews.
“This presentation is for informational purposes only and may not be incorporated into a contract or agreement.”
ISA–The Instrumentation, Systems, and Automation Society SP99 Work Group 2 TR#2 “Second Edition” Long Beach Meeting April 28, 2004.
What is Business Analysis Planning & Monitoring?
TESTING STRATEGY Requires a focus because there are many possible test areas and different types of testing available for each one of those areas. Because.
1 Our Expertise and Commitment – Driving your Success An Introduction to Transformation Offering November 18, 2013 Offices in Boston, New York and Northern.
4.2 Develop Project Management Plan
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
Where Innovation Is Tradition SYST699 – Spec Innovations Innoslate™ System Engineering Management Software Tool Test & Analysis.
Software Configuration Management
LECTURE 1 What does a Business Analyst do? IFS 231 Business Analysis.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 1 Slide 1 An Introduction to Software Engineering.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Relationships July 9, Producers and Consumers SERI - Relationships Session 1.
SacProNet An Overview of Project Management Techniques.
1 MODERNIZATION OF BELARUSIAN STATISTICS _________________________________________________ IMPLEMENTATION OF THE PROCESS APPROACH IN ORGANIZING THE STATISTICAL.
CHECKPOINTS OF THE PROCESS Three sequences of project checkpoints are used to synchronize stakeholder expectations throughout the lifecycle: 1)Major milestones,
Fifth Lecture Hour 9:30 – 10:20 am, September 9, 2001 Framework for a Software Management Process – Life Cycle Phases (Part II, Chapter 5 of Royce’ book)
Introduction to the Continual Service Improvement Toolkit Welcome.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Project Management Cross lifecycle Activity
PRJ566 Project Planning & Management Software Architecture.
Enterprise Architecture HOW COMPANIES ARE EXPLOITING INFORMATION TO THROUGH IT.
Project Initiation at The Regence Group 12/19/2015John Garrigues1.
The principles of an object oriented software development process Week 04 1.
ITC Software ITC FUNCTIONAL TESTING SERVICES.
D R A T D R A T ABSTRACT Every semester each department at Iowa State University has to assign its faculty members and teaching assistants (TAs) to the.
An organizational structure is a mostly hierarchical concept of subordination of entities that collaborate and contribute to serve one common aim... Organizational.
Team SHARP February 10,  Sponsor ◦ Dr. Will Tracz  Faculty Coach ◦ Robert Kuehl  Members ◦ Samuel Goshen ◦ Leo Torbochkin ◦ Dan Edenhofer ◦ Dominic.
Fluent in all the World's Business Languages.. Merging Content Development with the Localization Process. November 19, 2003 Integrating with Language.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
Viewpoint Modeling and Model-Based Media Generation for Systems Engineers Automatic View and Document Generation for Scalable Model- Based Engineering.
11 ADM2372 Management Information Systems (MIS) Chapter 10 – Part I Systems Development Chapter 10 – Part I Systems Development.
Info-Tech Research Group1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
Adaptive Software Development Process Framework. Version / 21 / 2001Page Project Initiation 2.0 Adaptive Cycle Planning 5.0 Final Q/A and.
Business process management (BPM)
Testing Process Roman Yagodka ISS Test Leader.
Business process management (BPM)
BSA 376 AID Lessons in Excellence-- bsa376aid.com.
Introduction to Software Testing
Project Lifecycle and IT Product Life Cycle
Planning the Prepare Stage
UML Design for an Automated Registration System
NMDWS Internship Portal
Presentation transcript:

Where Innovation Is Tradition SYST699 – Spec Innovations Innoslate™ System Engineering Management Software Tool Test & Analysis

Where Innovation Is Tradition Agenda Background - Innoslate Problem Definition Project Objectives Project Approach Project Status Project Schedule

Where Innovation Is Tradition Background – Innoslate™ Innoslate™ Systems Engineering Tool Tool was developed as the aggregation of several systems engineering tools and concepts that have been utilized for the past 25 years. Cloud-based web application developed specifically for systems engineers to encompass activities related to the full systems lifecycle. Includes capabilities related to requirements management, collaboration, system modeling, reporting, and discrete event simulation.

Where Innovation Is Tradition Problem Definition Software product development is very new to SPEC Innovations necessitating a critical review and analysis of the Innoslate™ tool to provide independent feedback and recommendations. SPEC Innovations’ primary need is an evaluation of the tool’s usability and the functionality to measure its ability to assist system engineers in doing their job.

Where Innovation Is Tradition Project Objectives Testing and critical/comparative evaluation of the capabilities offered by Innoslate™. Compile and detail test results, feature comparisons, recommendations, and trade study analysis as part of a report to the sponsor. Deliver the final project report and present project and finding to the sponsor and GMU faculty.

Where Innovation Is Tradition Project Approach [1] Based on feedback the scope was defined to utilize the final report for a project from SYST513, Meeting and Event Planning System (MEEPAS). MEEPAS is a Meeting and Event Planning Assistant System Intended for increasing efficiency and reducing technical difficulties for requesting, scheduling, executing, and monitoring meetings

Where Innovation Is Tradition Project Approach [2] Project activities during MEEPAS project included: Development of CONOPs, System Requirements, as well as measures of effectiveness and performance. Test cases will be developed based on the system development lifecycle phases that are addressed in the final report; concept of operations (CONOPS), requirements elicitation and management, system architecture design and modeling.

Where Innovation Is Tradition Project Approach [3] The tool will also be utilized to capture the project requirements, test cases, and test execution results. Mozilla Firefox and Google Chrome web browsers will be utilized to conduct the system testing to provide broader usability feedback. (Internet Explorer is not supported currently) Provide feedback and functionality gaps to SPEC Innovations via the InnoSlate feature tracker tool.

Where Innovation Is Tradition Project Status [1] Hold kick-off meeting with sponsor - Competed; bi-weekly progress meetings established. Identify scope and methodology – Completed; identified project and stage of the SELC to focus tests for Innoslate. Components selected within Innoslate to focus testing on: Database functions- storing of Assets, Artifacts, etc. Requirement Gathering functions- Our project requirements as well as requirements of the selected MEEPAS project.

Where Innovation Is Tradition Project Status [2] Report Generation functions: Based on inputted objects into the database. Document Analyzer functions: Automated versus Manual parsing of inputted documents. Identify and document user requirements – In progress Develop Project Status Report – Target completion: 10/11/2012 Develop test plans and testing requirements - In progress; target completion: 10/11/2012

Where Innovation Is Tradition Conduct tests and evaluation – Target completion: 11/8/2012 Develop Final Presentation – Target completion: 12/6/2012 Develop Final Report – Target completion: 11/29/2012 Project Status [3]

Where Innovation Is Tradition UIDActivityStart DateFinish DateContact 1SEM Analysis Kick- Off 8/30/20129/13/2012Ceely/Matthews/St evenson/Woldie 1.1Hold Initial Meeting with Sponsor 9/10/2012 Ceely/Matthews/St evenson/Woldie 1.2Problem Definition Presentation 8/30/20129/13/2012Ceely/Matthews/St evenson/Woldie 1.2.1Develop Presentation 8/30/20129/12/2012Ceely 1.2.2Present Presentation 9/13/2012 Ceely/Matthews/St evenson/Woldie Schedule [1]

Where Innovation Is Tradition UIDActivityStart DateFinish DateContact 2SEM Project Scope and Methodology 9/14/201210/14/2012Ceely/Matthews/St evenson/Woldie 2.1Analyze Past Projects for Selection 9/14/20129/21/2012Ceely/Matthews/St evenson/Woldie 2.2Select Past Project9/22/20129/23/2012Ceely/Matthews/St evenson/Woldie 2.3Scope SELC Phase 9/22/20129/23/2012Ceely/Matthews/St evenson/Woldie 2.4Requirements10/1/201210/14/2012Matthews 2.4.1Develop Requirements 10/1/201210/7/2012Matthews 2.4.2Review Requirements 10/7/201210/9/2012Ceely/Matthews/St evenson/Woldie Schedule [2]

Where Innovation Is Tradition Schedule [3] UIDActivityStart DateFinish DateContact 2.4.3Incorporate Inputs10/10/201210/13/2012Matthews 2.4.4Submit Requirements 10/14/2012 Matthews 2.5Approach Presentation 9/24/201210/4/2012Ceely/Matthews/St evenson/Woldie 2.5.1Develop Approach Presentation 9/24/201210/1/2012Stevenson 2.5.2Present Approach Presentation 10/4/2012 Ceely/Matthews/St evenson/Woldie

Where Innovation Is Tradition UIDActivityStart DateFinish DateContact 3Test and Evaluation of Innoslate 10/4/201211/8/2012Ceely/Matthews/Stev enson/Woldie 3.1Develop Test Plans10/4/201210/11/2012Woldie 3.1.1Requirements Test Plan 10/4/201210/11/2012Woldie 3.1.2Design Test Plan10/4/201210/11/2012Woldie 3.2Conduct Test10/12/201210/26/2012Ceely/Matthews/Stev enson/Woldie 3.2.1Requirements Test10/12/201210/19/2012Ceely/Matthews/Stev enson/Woldie 3.2.2Design Test10/20/201210/26/2012Ceely/Matthews/Stev enson/Woldie 3.3Evaluate Test Results 10/26/201211/8/2012Ceely/Matthews/Stev enson/Woldie Schedule [4]

Where Innovation Is Tradition Schedule [5] UIDActivityStart DateFinish DateContact 4Final Presentation10/4/201212/6/2012Ceely/Matthews/Stev enson/Woldie 4.1Develop Final Presentation 10/4/201210/31/2012Stevenson 4.2Submit Draft Final Presentation 11/1/2012 Stevenson 4.3Incorporate Presentation Feedback 11/2/201211/26/2012Stevenson 4.4Final Presentation Rehearsal 11/29/2012 Ceely/Matthews/ Stevenson/Woldie 4.5Final Presentation – Faculty 12/6/2012 Ceely/Matthews/ Stevenson/Woldie 5Final Report10/11/201211/29/2012Ceely/Matthews/ Stevenson/Woldie 5.1Develop Phase I (Initial) of Final Report 10/11/201211/15/2012Ceely

Where Innovation Is Tradition UIDActivityStart DateFinish DateContact 5.2Incorporate Input11/16/201211/19/2012Ceely 5.3Develop Phase II (Final) of Final Report 11/08/201211/25/2012Ceely/Matthews/ Stevenson/Woldie 5.4Tech Edit Final Report 11/25/201211/28/2012Stevenson 5.5Submit Final Report 11/29/2012 Stevenson 6Administrative Presentations and Reports 10/4/201210/18/2012Ceely/Matthews/Stev enson/Woldie 6.1Project Status Report 10/4/201210/11/2012Stevenson 6.2In Progress Review Presentation 10/11/201210/18/2012Ceely/Matthews/Stev enson/Woldie Schedule [6]

Where Innovation Is Tradition Questions