RESTORATION OF A PNEUMATICALLY CONTROLLED END-OF-ARM-TOOLING (EOAT) FOR CLASSROOM TEACHING Trent Lott and Chase Keller Advisor: Dr. Mohammad Saadeh Class:

Slides:



Advertisements
Similar presentations
January 6. January 7 January 8 January 9 January 10.
Advertisements

Pneumatic Components & Systems Team 1640 Clem McKown – mentor November 2008.
Ray Schroeder ET 493 Senior Design I Advisor: Dr. Cris Koutsougeras Spring Semester /5/2014.
Ray Schroeder ET 494 Senior Design II Advisor: Dr. Cris Koutsougeras Fall Semester /5/2014.
X. X September Mo Tu We Th Fr Sa Su
Chubaka Producciones Presenta :.
Automotive Fire Fighting System Athan Jefferson Advisor Dr. Junkan Ma Instructor Dr. Cris Koutsougeras ET 493 Senior Design I.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Planning a Mentoring Program A CALENDER FOR A FIRST-YEAR TEACHERS’ PROGRAM.
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Automatic Dental Bur Loader NCDA Dental Products Development Group Progress Review Team 99.06: Jason Dickey, Greg Frantz, Allison Martin, Nancy Meyer Sponsor:
Ventricle Chamber Valve Imaging Chamber ECG Machine Aortic Compliance Chamber Buffer Chamber Secondary Compliance Chamber Flow Meter Pressure Sensors DAQ.
Team 10 ME Project: Air Conditioner Lab Members Customer Advisor Sean M. Gallagher, Brian Davison U of D ME Department Dr. Keefe Prathana Vannarath, Pam.
Chicas, este calendario si es pa' nosotras !!!!!.
ET 493 – Senior Design Southeastern Louisiana University Jarrett Johnson Mechanical Engineering Technology Instructor: Cris Koutsougeras Advisor: Mohammad.
PLC: Programmable Logical Controller
ENGR 8-4, Lesson 2 Hydraulic and Pneumatic Systems
Baldcypress and Water Tupelo Tree Pot Shelter By Clyde Walker Jr. INSTRUCTOR: DR CRIS KOUTSOUGERAS ADVISOR: DR. JUNKUN MA FINAL PROPOSAL PRESENTATION Southeastern.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSAT/SUN Note: You can print this template to use as a wall calendar. You can also copy the slide for any month to add.
Template For Building Project Schedule Jazz Presentation.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSAT/SUN Note: You can print this template to use as a wall calendar. You can also copy the slide for any month to add.
Sample System Specialists for Gas Analysis Information on Sample System Capabilities.
Steel Fabrication & Erection of Belle Chasse Primary School Belle Chasse, LA Derek Duhon ET Instructor: Chris Koutsougeras Advisor: Edward Rode’
Mentors Workshop Pneumatic Sub-System Mark McLeod Team 358 Festo/Hauppauge H.S. F For I Inspiration and R Recognition of S Science and T Technology.
Gasoline fuel supply systems Function: store, transport, Pressurize and filter gasoline going to carburetor or fuel injection system.
The Voice Operated and Wirelessly Controlled Elevator Jeremy Hester Advisor: Dr. Mohammad Saadeh Class: ET 494 (Senior Design II), Fall 2013 Class Professor:
ET 493 Senior Design Spring 2013 By: Justin Cifreo, Benjamin Gabriel, Nathan Taylor Instructor: Dr. Cris Koutsougeras Advisor: Dr. Junkun Ma Mechanical.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Restoration of a Pneumatically Controlled End-Of-Arm-Tooling (EOAT) for Classroom Teaching Trent Lott and Chase Keller Advisor: Dr. Mohammad Saadeh Class:
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
Water-saving Shower Faucet By: LaJerrika Carney & Ryan McDaniel Advisor: Dr. Mohammad Saadeh Class Professor: Dr. Cris Koutsougeras ET Senior.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
September 2008 SundayMondayTuesdayWednesdayThursdayFridaySaturday
RESTORATION OF A PNEUMATICALLY CONTROLLED END-OF-ARM-TOOLING (EOAT) FOR CLASSROOM TEACHING Trent Lott and Chase Keller Advisor: Dr. Mohammad Saadeh Class:
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Automatic Fire Fighting System Athan Jefferson Advisor Dr. Junkan Ma Instructor Dr. Cris Koutsougeras ET 493 Senior Design I.
RESTORATION OF A PNEUMATICALLY CONTROLLED END-OF-ARM-TOOLING (EOAT) FOR CLASSROOM TEACHING Trent Lott and Chase Keller Advisor: Dr. Mohammad Saadeh Class:
Virtual Lab on Automation Systems A Proposal under Mechatronics Laboratory Presented By Tanuja Sheorey PDPM IIITDM Jabalpur.
AUTOMATED ROD SINGULATION SYSTEM Student: James Welch Concentration: Mechanical Class: ET-494 Spring 2015 Instructor: Dr. Cris Koutsougeras Advisors: Dr.
Modular Flexible Manufacturing System for Industrial Engineering teaching and research ps-training-series/
Fluid Power systems Zonal hydraulics - industrial case 10 October 2017
Exoskeleton Robotic Arm
Southeastern Louisiana University
Commercial Office Building
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Centralized Classroom and Event Scheduling: Summer 2018
13-block rotation schedule
Servo Motor Control Using Variable Frequency Drive
McDonald’s Kalender 2009.
Problem Gambling Clicks to Opgr.org
McDonald’s calendar 2007.
Water-saving Shower Faucet
Proud As A Peacock! We are very proud of__________________
ACOE347 – Data Acquisition and Automation Systems
Teacher name August phone: Enter text here.
The Transformation of A Small Company Into A Golden Legend
February 2007 Note: Source:.
Wireless Door Lock System
MONTHS OF THE YEAR January February April March June May July August
Boxing Station Assembly
McDonald’s calendar 2007.
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

RESTORATION OF A PNEUMATICALLY CONTROLLED END-OF-ARM-TOOLING (EOAT) FOR CLASSROOM TEACHING Trent Lott and Chase Keller Advisor: Dr. Mohammad Saadeh Class: ET (Senior Design I) Class Professor: Dr. Cris Koutsougeras Southeastern Louisiana University Computer Engineering Technology Fall 2013

End-of-Arm-Tooling (EOAT)  The EOAT was an Intralox generous donation.  It came with various sensors, pneumatic actuators, pumps, and mechanical slides.  The EOAT was typically used to pick-and-place components through vacuum suction cups

Programmable Logic Controller PLC  The EOAT came with a PLC and other power components.  The power panel included some components that were not applicable to our project.  The 480V transformer and the high power components were removed.

Working System at Intralox: How did the EOAT operate? 1.Slide into the mold. 2.Extend the vacuum cups to grab the next part. 3.Lift it up so the next section could be molded to it to create a continuous belt.

Working System at Intralox: Then, the EOAT would slide back out so the mold could close and start the process all over again.

Objectives:  To restore the EOAT and learn the functionality of the entire system.  To provide our ET program with an extra training/simulation apparatus to better prepare our graduates for real work equipment.

Available Components:  EOAT  Allen Bradley MicroLogix 1200 PLC  Software  RSLinx  RSLogix 500  Air Compressor (4 hp)

 Wooden Frame  Pneumatic gauges, tubing, and fittings  Vacuum pump (VP80 – 200M)

Building the Frame:

MicroLogix 1200 PLC by Allen Bradley

RSLinx Software

RSLogix 500 Software

Air Compressor:

Valve Pack:  For controlling the air supply to individual components of the system.

Problems With The Vacuum  Three phase Vacuum Pump is not adequate for lab use.  In the process of buying a single phase Vacuum.

Multi-Port Venturi Vacuum Pump VP80-MP The VP80-MP vacuum pump has 4 vacuum ports that distribute vacuum equally to 4 locations

Schedule of Deliverables  September 2013:  The EOAT was picked up from Intralox facility in Hammond and delivered to Southeastern.  October 2013:  The EOAT, PLC power and pneumatic connections, sensors, and actuators were all identified.  November 2013:  The wooden frame was constructed and the PLC software was installed.  December 2013-January 2014:  Order remaining parts (vacuum pump, sensors, pneumatic tubing, pneumatic regulators).

Schedule of Deliverables  February 2014:  Connect sensors and actuators to PLC and train the system.  March 2014:  Connect vacuum and air compressor to PLC and actuators.  April 2014:  Test the system, document all components, and prepare a user manual that describes the operating mechanism.