1 Overview CQC Asphalt Specifications.  Payment based on Contractor’s Quality Control tests.  FDOT runs verification tests at a lesser frequency. 

Slides:



Advertisements
Similar presentations
MnDOT 2007 Pilots n Mixture Sampling Modification –Increase randomness of sampling. »Sample is split in the field and stored in containers labeled with.
Advertisements

Carl Steinhauer Consultant
Paving Potpourri 2015 Spec Changes and More! Bob Dyer Assistant State Construction Engineer WAPA Joint Training March 2015 Lynn Peterson Secretary of Transportation.
Section Cross Slope District 1 Your logo here.
HMA Design (Surface) The surface course is the layer in contact with traffic loads and normally contains the highest quality materials. It provides characteristics.
Asphalt Specification Changes July 2005 Contractor Asphalt Training Rich Hewitt, PE District Bituminous Engineer District Five Materials & Research.
BASICS OF A GOOD ROAD ASPHALT AND AGGREGATES
Recycled Asphalt Program & Environmental Stewardship Program (Post Consumer Content) Robert C. Rea Nebraska Department of Roads WASHTO – Omaha, Nebraska.
2014 AAPA Conference March 11-12, 2014 Curtis Vincent, P.E. Construction Engineer Lyndi Davis Blackburn, P.E. Assistant Materials and Tests Engineer Specification.
Caltrans Changes SECTION 39 “Hot Mix Asphalt”
SMA Mixture Design Requirements
1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.
QUALITY CONTROL More Makes Money Less Leads Losses
Conversion of Petroleum Contaminated Soil into Asphalt-Treated Road Base U.S. Army Corps of Engineers, Alaska District.
Tolerances and Price Impacts Presented by:- Er. Bhagawan Shrestha.
Pavement Performance Specifications Research.
Bituminous Street Recertification Initiatives. Initiative Items n Stone Matrix Asphalt (SMA) n Longitudinal Joint Spec and other methods for longitudinal.
MICHIGAN RIDES ON US 2015 Local Roads Workshop Gaylord March 12, 2015.
1 Quality Control Program. 2 Objectives To know: To know: –How the QC Program is Doing –Effect of Specification Changes on the QC Program –Contractor.
2015 APAM Conference Hot Mix Asphalt (HMA) Update Kevin Kennedy HMA Operations Engineer Michigan Department of Transportation
SUPERPAVE MIX DESIGN Superpave Mix Design.
1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State.
Warm Mix for a Cold Climate Colorado DOT’s 2007 WMA Project.
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
Asphalt Quality Assurance Program
SB Certification for Mixture-Based Specification for Flexible Base Summary of Spec Test Procedures Actions to Take for Non-Compliance October 31, 2012.
EARTHWORK RECORD SYSTEM
Introduction to Asphalt Pavement Construction and Compaction For ODOT District 3 presented by.
Quality Control Testing
2002 FDOT/FTBA Construction Conference
2013 Year In Review APAI Winter Conference January 9, 2014 Matt Beeson, P.E. Asphalt Engineer.
Warm Mix for a Cold Climate Update on Colorado DOT’s 2007 WMA Project on I Rocky Mountain Asphalt Conference and Equipment Show.
Item 346 Item 346 is a QCQA specification for Stone-Matrix Asphalt (SMA) and Asphalt Rubber Stone-Matrix (SMAR) mixtures.
Update on End Result Specifications Celik Ozyildirim, Ph.D., P.E.
11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 1 QMP Specifications QMP base aggregate QMP base aggregate Review and comment.
Florida Department of Transportation 1 Overview of CQC Asphalt Specifications.
Asphalt QC 2000 The Adventure Begins….. Topics Terminology Specifications Sampling and Testing Reporting/CQR Who Does What? Lube & Oil Change All in 20.
Overview of the New Hot Mix Specifications Dale A. Rand, P.E. TxDOT Construction Division Flexible Pavements Branch TRB AFK10 Committee Meeting April 20-21,
Bituminous Street 2 General Information.
Developing a Mixture-Based Specification for Flexible Base.
WisDOT Bureau of Technical Sevices Spring 2014 QMP Training Base Compaction SPV’s and Project Design Guidance.
Pavement Performance Specifications Research.
Allen Hughes State Materials Office
 Have an approved mix design before paving.  The department has eliminated the use of PG -22 Asphaltic Material and replaced it with PG -28.  Tack.
Asphalt Roadway Daily Report of Quality Control (Form No ) A step by step guide.
AGGREGATES.
1 Reclaimed Asphalt Pavement in Arizona - Application and Verification October 3, 2008 Arizona Association of County Engineers.
Session #3 Asphalt 103- Materials: Basics of RAP, Usage and Specifications.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
PAPA Regional Meetings Meetings with PAPA in 2012: –January Remove and Replace Defective Material –May Table “H” instituted after PAPA meeting –June.
3 - 1 Holding The Contractor to 105% of the Target Spread Rate!
Asphalt Concrete Mix Design
ERLPM Workshop Statistical Analysis
By Terry Treutel Ride Quality Consultant Former WisDOT Ride Spec Coordinator.
Trenton M. Clark, P.E. Director of Engineering Virginia Asphalt Association.
Contractor QC Wesley Glass Kentucky Transportation Cabinet 2007 KAHC/KYTC Meeting Bowling Green/Lexington, Kentucky.
LLP HMA Reclaimed Asphalt Pavement ( RAP) Pre-Bid Meeting District 4 Oakland, CA September 14, 2012 Peter Vacura Chief, Office of Asphalt Pavement Division.
1 PWL/Local Acceptance 2013 demonstration Projects Three Possibilities - DOT does all testing - DOT does verification testing of 20% of samples & uses.
QUALITY CONTROL TESTS FOR VARIOUS LAYERS OF FLEXIBLE PAVEMENTS
Project Materials Usage and Concerns. Project Materials and Acceptance QC/QA Specifications QC/QA Specifications Quality Control Plans Quality Control.
An Overview of the Asphalt Mixture Performance Tester.
Russian Engineers Training March 2011
Marshall & Superpave Mix Design
Quantity Calculations Module 3. Quantity Calculations  Specifications  Post Bid Quantity Calculations  Production Quantity Calculations –Checking Yield.
Alabama Asphalt Pavement Association
Thin Hot Mix Asphalt Overlays PennDOT Research Findings
2018 Pavement Workshop Flexible Session May 23-24, 2018
Quality Assurance: Pay Factors and Dispute Resolution
Presentation 2 Phase A – Deformation Studies
Superpave5 Superpave Design at Five Percent Air Voids
Presentation transcript:

1 Overview CQC Asphalt Specifications

 Payment based on Contractor’s Quality Control tests.  FDOT runs verification tests at a lesser frequency.  Payment is based on roadway density, air voids, asphalt content and gradation.  Uses Percent Within Limits (PWL) statistical specs.  Separate Master Production Range to catch outliers.  Began with July 2002 workbook. 2

 Standard Lot size:  4,000 tons for dense mix or 2000 tons for OGFC.  Four sublots per Lot.  Plant Lot & Roadway Lot same.  Engineer establishes sampling points.  Random basis.  Use Excel spreadsheet.  Directs Contractor when to sample.  Contractor does all the sampling. 3

 QC = Quality Control = Contractor  VT = Verification Test = FDOT Project personnel (typically a consultant)  IV = Independent Verification = FDOT District Materials personnel  RT = Resolution Testing = FDOT District Materials personnel 4

Typical 1,000 ton Sublot - composed of 50 truckloads (20 tons each) 5

Lot 1, sublot 1 50 trucks, 20 tons each = 1,000 ton sublot Random Sample Numbers by Sublot 6

Sublot 1Sublot 2Sublot 3Sublot 4 LOT = 4,000 Tons QC randomly tests one per sublot. VT randomly tests one split per Lot. RT splits held until Lot is verified. QC Testing at Pla QC Testing at Plant Tons 7

Sample Splits G mb G mm Ext/Grd QC VT RT 8

9

10 Table Master Production Range CharacteristicTolerance (1) Asphalt Binder Content (%)Target ± 0.55 Passing No. 200 Sieve (%)Target ± 1.50 Air Voids (%) Coarse Graded2.00 – 6.00 Air Voids (%) Fine Graded2.30 – 6.00 Density, %Gmm (2) Coarse Graded (minimum)93.00 Fine Graded (minimum)90.00 (1) Tolerances for sample size of n = 1 from the verified mix design (2) Based on an average of 5 randomly located cores

 Terminate Lot if:  One sublot failure for Air Voids.  One sublot density failure.  Two consecutive sublot density failures for fine mix.  Two consecutive sublot failures for gradation.  Two consecutive sublot failures for asphalt content.  2 individual core densities for coarse mix less than 91.00% Gmm. 11

 At completion of each Lot  Test VT sample for randomly selected sublot  Split from QC sample  Use test method precision for comparison  Excel spreadsheet  If everything compares favorably…  Calculate pay based on QC results  If not….go to Resolution testing  District Materials Office 12

Sublot 1Sublot 2Sublot 3Sublot 4 LOT = 4,000 Tons QC tests one per sublot. VT randomly tests one split per Lot. VT Testing 13

Between-Laboratory Precision Values Table Table Between-Laboratory Precision Values PropertyMaximum Difference G mm G mb (gyratory compacted samples) Gmb (roadway cores – fine graded mixture) Gmb (roadway cores – coarse graded mixture) PbPb 0.44 percent P -200 FM 1-T 030 (Figure 2) P -8 FM 1-T 030 (Figure 2)

 If the verification testing does not compare on a pay property  Resolution samples tested by third party lab for the property in question  All sublots are tested  Use test method precision for comparison to QC  Excel spreadsheet  If everything compares favorably…  Calculate pay based on QC results  If the sample does not compare  Resolution results are used to calculate pay for that property 15

Sublot 1Sublot 2Sublot 3Sublot 4 LOT = 4,000 Tons QC randomly tests one per sublot. VT randomly tests one split per Lot. RT tests non-comparison property for each sublot. RT Testing Tons 16

 Roadway and Plant Lot the same.  6-inch diameter cores.  Five cores per sublot.  Randomly located (stratified manner).  Use spreadsheet.  Minimum of 3 cores/sublot.  Retain QC cores for VT & RT. 17

 Density testing not required for:  Total quantity of hot mix < 2,000 tons.  Widening or shoulders with a width of 5 ft or less.  FC-5  Misc. Asphalt, Variable thickness or overbuild layers.  Leveling, Bridge Decks, Approach slabs.  First lift of asphalt placed on subgrade.  Bike/shared use paths.  Crossovers or intersections.  Any course thickness < 1 inch or specified spread rate converts to < 1 inch. 18

 Testing not required for the following areas when they are less than 1,000 feet long:  Turning lanes  Acceleration lanes  Deceleration lanes  Shoulders  Parallel parking lanes  Ramps  Use rolling procedure (equipment and pattern) as approved by the Engineer.  Density testing required everywhere else. 19

 If two or less sublots:  Use Small Quantity Pay Table based on average deviations from target.  If three or more sublots:  Use Percent Within Limits (PWL) for the Lot.  Calculate Pay Factor for:  Density, Air Voids, AC Content, P-200, P-8 20

 Pay factor for each characteristic is determined.  Composite Pay factor is based on:  35%Density  25%Air Voids  25%AC Content  10%P-200  5%P-8  Calculations done by spreadsheet. 21

 Individual Pay Factors Below 0.90  First time correct, 2 consecutive – cease.  Composite Pay Factor 0.80 to 0.89  Cease until problem is resolved.  Composite Pay Factor 0.75 to 0.79  Handle per (EAR).  Composite Pay Factor Less than 0.75  Remove and Replace. 22

 Contractor must remove & replace…OR  Engineering Analysis Report…  If approved by Engineer / Paid by contractor.  Independent Lab approved by Engineer.  Remain in place at composite pay factor, or as determined by Engineer.  Can be waived by Engineer.  Delineation testing by Contractor  Only for asphalt content, density, and gradation. 23

 Handled by the District Materials Office.  One sample per 4,000 tons.  Sampled by Contractor with FDOT supervision.  Compare IV results with QC (test precision).  Use Master Production Range Table  IF IV fails MPR, cease production until problem resolved and then evaluate in-place material. 24

 FC 9.5 and FC 12.5  Handled in same manner as 334 HMA.  FC 5 (OGFC)  Same concepts but different material properties: ▪ Asphalt content, Gradation (P-3/8, P-4, P-200) 25