Monitoring of structures adjacent to geotechnical works Joanna Pieczynska, Jaroslaw Rybak Wroclaw University of Technology.

Slides:



Advertisements
Similar presentations
Airport planning.
Advertisements

Click to continue…. Railroad Track wetland Image Date: December 2003.
Challenges of Change Residential Land Use & Development in Rehoboth Beach is Undergoing Change.
Introduction and the Context The Use and value of Urban Planning.
KW Energy Solutions, LLC Increasing Energy Efficiency Increasing Energy Effectiveness.
Franco Barnard M&V Project Engineer Baseline Service Level Adjustments of ECM on Compressed Air Systems 16 August 2012.
What kind of demands does a new real estate market growth make on real estate quality in Estonia? Ene Kolbre Angelika Kallakmaa-Kapsta Tallinn University.
Health and Safety Manual Section F9 Working at Height.
Particle Impact: Example Problem 1 For the straight line impact problem shown below, please determine: (a) The velocities after impact. (b) The kinetic.
SCEC Annual Meeting - ITR 09/17/ Izmit Earthquake August 17, 3:02am, 1999 Mw 7.4 Mw earthquake: >18,000 fatalities >300,000 homeless.
What is a proper time for pile testing Jaroslaw Rybak, Wroclaw University of Technology.
A Revolutionary New Panelized Construction System Steel frame panels for each project are built in CHS’s manufacturing facility and delivered to job-site.
U U 1 Excitation of Structural Resonance Due to a Bearing Failure Robert A. Leishear David B. Stefanko Jerald D. Newton IMECE 2007 ASME, International.
Safety Hazard Identification on Construction Projects Gregory Carter1 and Simon D. Smith2 ASCE, February 2006.
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
Earthquake Measurement Lesson 4. Seismograph A seismograph is an instrument used by scientists to measure earthquakes. Seismologists who study earthquakes.
Green School Design Gary A. Jerue ED 846 Spring 2010.
Analyses of tunnel stability under dynamic loads Behdeen Oraee; Navid Hosseini; Kazem Oraee 1.
Energy: The Transition from Depletable to Renewable Resources
Earthquakes.
Dead - More than 3,000 A report of U.S. Army relief operations recorded: 498 deaths in San Francisco 64 deaths in Santa Rosa 102 deaths in and near San.
Intelligent Motor Controls, Inc. P.O. Box 1810 Goodlettsville, TN (615) E LECTRIC M OTOR P ERFORMANCE & T RENDING H ARDWARE EMPATH 2000.
9 Closing the Project Teaching Strategies
Details of Construction Lecture-2 “Shallow Foundation”
Section 3: Earthquakes and Society
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Quiz 1: Road Transport Case Study Evidence A – Fuel taxation, international experience 1. Why should ‘reducing traffic’ be an aim of government, separate.
A Cleaner Production Project in the South African Paper Industry – Lessons learnt Iain Kerr, MSc (Env. Biotech.) University of KwaZulu Natal, School of.
STH 145 Roundabout Presentation Bloom Companies, LLC July 3, 2012.
LIQUEFACTION FAILURE OF FOUNDATION - STRUCTURE COLLAPSE.
Underground Stations Typical Station Site Plan. Underground Stations Ground Conditions: Key Issues.
Semi-active Management of Structures Subjected to High Frequency Ground Excitation C.M. Ewing, R.P. Dhakal, J.G. Chase and J.B. Mander 19 th ACMSM, Christchurch,
A NON-TRADITIONAL HIGH PERFORMANCE BROAD-BAND SEISMOMETER PMD/eentec, USA
Earthquake Properties
Ground Improvement Dr. Talat Bader
Financial Statement Analysis
Embedded Design Using ARM For Strong Room Security System
Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
THE MEASUREMENT OF URBAN LAND CONSUMPTION AS A SOURCE OF INDICATORS OF ECONOMIC PERFORMANCE AND SUSTAINABILITY Rodrigo Bastías Castillo
Advanced Civil Litigation Class 12Slide 1 Settlements - In General A settlement is an agreement by both parties to resolve the dispute through compromise.
Earthquakes Chapter 8. What is an earthquake? Vibration of Earth produced by a sudden release of energy Movements along the fault line.
Planning and Organising Two Plant and Equipment Excavation calculation ConstructioConstrucc 2 : 2012 Construction Practice 2 : 2012 Presenter Tony Bosnich/Glenn.
Electric / Gas / Water Summary of Final Evaluation Report Prepared by: John Cavalli, Itron Beatrice Mayo, PG&E July 27, Express Efficiency Program.
Syndicate and its Impact on the Development of Russian Coal Mining Industry. The Late 19th – Early 20th Century. Methods of Analysis and Results Tamara.
Ground Vibrations and Air Blasts: Causes, Effects and Abatement.
Handout 3 (2-3) green “Recording Earthquakes”
CH. 8: Earthquakes and Volcanoes 8.1: Earthquakes.
Indian Hill Boulevard Grade Separation Proposal, January 25, 2016.
© Pharmaceutical Consultancy Services, All rights reserved. Quality System(s) Jaap Koster.
INDEX Sr noTopic 1.Introduction 2.Advantages 3.Product Types 4.Thermal Insulating Materials 5.Applicatiion.
Noise Control of Buildings
DESIGN OF AIRPORT TERMINAL AND CONTROL TOWER
ENERGY CONSERVATION IN MOTOR SYSTEMS. Introduction 2.
4/28/2017 Stress Corrosion Cracking Assessment in Pipeline Mohammed Abu Four October 11, 2010.
Deep Residential Basement, Chelsea. Toureen Plant Toureen Plant Toureen Contractors City Basements Groundworks RC Frames Groundworks RC Frames Petrol.
Project Cost Management
Bridge Pile Foundation Evaluation for a Soil Remediation Project
Direct Capital Value Comparison (Sales Comparison Approach)
Saint- Petersburg State University of Aerospace Instrumentation
Locating an earthquake
REVISION 1 1. Foundations.
SD INTRASTATE PUBLIC EDUCATION
Earthquake resistant buildings
Earthquakes.
Thermal Impact of Different Interior Finishing Materials on Energy Consumption YOGESH JATAV
Do Now: How do we measure earthquakes?.
Step 1 – Prediction of Vibration at Pile Bases
Decision Tree for the Selection of Appropriate Ground Improvement Technique in the Arabian Gulf Region Bashar Tarawneh, Ph.D., P.E Associate Professor.
Earthquake Measurement
SD INTRASTATE PUBLIC EDUCATION
Presentation transcript:

Monitoring of structures adjacent to geotechnical works Joanna Pieczynska, Jaroslaw Rybak Wroclaw University of Technology

Main ideas Sheet piling. –Piling technologies (driving, press-in method). Ground improvement –Technologies – impact on neighborhood. Case studies – examples of monitoring

Deep excavations Wroclaw – historical city-center

Traditional methods Pile driver Vibrator

Press – in method

Close, closer …

Deep excavation University of Wroclaw Faculty of Law

How to reduse the impact ? Pre-boring

How to reduse the impact ? jetting

How to reduse the impact ? jetting

Monitoring Type of property Peak particle velocity [mm/s] Continuous vibrationTransient vibrations Ruins, buildings of architectural merit24 Residential510 Light commercial1020 Heavy industrial1530 Buried services2540

Monitoring – Techniczna street Daily report – peak particle velocity

Monitoring – Techniczna street Daily report – peak particle velocity

Monitoring – Techniczna street At 12:33:15 on 5 February 2010 the sensor recorded an excitation increasing in the period of 15 seconds to the value of 200 mm/s, and in the subsequent 15 seconds – incremented by another 50 mm/s. The character of the value was not accidental, but rather illustrated a propagating seismic wave. Unfortunately, the sensor was set at the test range of 0 – 250mm/s and after exceeding this range, it turned off. It is obvious that after the above shown results are marked on the DIN4150 diagram, the effect will considerably differ from all possible safety levels. After the afore- mentioned situation had been recorded, tedious search took place in order to confirm that the seismic wave was truly excited in the neighborhood.

Monitoring – Techniczna street Finally, at about 3:00 p.m. the Bobrek – Bytom Centrum Mine provided information that there had been a crump which released a great amount of energy. The mine determined the excitation at the level of 2.7 degrees of the Richter scale. Unfortunately, the caution on the part of the investor did not prevent the neighboring houses from damages; it only saved the geotechnical company from paying damages, as the failure had not been caused by their work

Monitoring – examples Powązkowski National Cementary

Monitoring – examples Cementary wall

Monitoring of vibrations Cementary wall Graves

Peak particle velocities

Peak particle velocities / frequency

Monitoring – dynamic replacement Residential house near building site

Monitoring – daily report

Monitoring – bridge abutment New built bridge abutment. Problem of vibration impact on early concrete.

Monitoring – daily report

Monitoring – equipment Heavy noise control

Conclusion The analysis of vibrations of the background that permanently influences the monitored structures makes it possible to determine precisely the permissible frequency of vibrations and thus to take into account lower efficiency of works in calculating overall costs. Although the monitoring programs may be in practice diversified, complex and perfectly adjusted to even very demanding construction technologies, the difficulty lies in the assessment of the proportions between the real needs, the proper monitoring scope and the financial resources of the investor, who, in the end, pays for such investigation. It is however worth emphasizing that the costs of such examination are much lower than the potential damages that may be thus avoided.

Thank you for your attention