Walls crates cables gas chambers electronics CERN 18-10-5 adb.

Slides:



Advertisements
Similar presentations
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Advertisements

LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
25 October 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status & Plan.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of NA62 straw electronics Webs Covers Services Readout.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
cm 150 cm The Al foil is large as the M3 wall  we can put 1 raw (5 chambers) or 2 raws There is an insulating material (varnish) on the.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
L0 Workshop 17/10/2007 Wilco Vink / Martin van Beuzekom Leo Wiggers / Sander Mos 1 Commissioning/Status Pile-Up System.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
Expt. Area meeting – December V. Bobillier1 Cabling installation status.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
CLAS12 Drift Chamber Prototyping
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
V. Bobillier1 Cable installation status.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
Summary of FEE-Integration Meeting LNF, Summary of the Frascati meeting on chamber & front-end integration on 10 September 2003, provided.
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
S A Griffiths CM42 June 2015 Electrical & Control.
Florian Buchsteiner (HEPHY Vienna)
Berkeley status Aug 10th, 2012.
Cabling for LHCb Upgrade
VELO-installation meeting CERN, January 17, 2006
CMS Area Working Group Meeting
T1 Electronic status Conclusions Electronics Cards:
G. Carboni for the Muon Group
EMU Slice Test Run Plan a working document.
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
Presentation transcript:

walls crates cables gas chambers electronics CERN adb

walls crates cables gas chambers electronics

1,5 m M2 prototype at LNF transport & positioning scale 1:4 !!!

precision pin glue rivets assembly steps

3 panels 4 panels

photogrammetry (50  m) in horizontal position (holes for rivets are our main reference) delivery of two half-stations at the same time: long term stockage (up to 3 months) in Bld 156

- panels arrival at Bld lifting tools installation - panels transport to the pit installation sequence 1 panel in vertical position 2 balconies fixation 3 copper braid fixation 4 cable supports 5 panel lifting 6 positioning of the following panel 7 gluing & riveting 8 safety electrical soldering 9 check of some balconies alignment (with ruler)

- panels arrival at Bld 156 (M5 middle November; one wall every two weeks) - lifting tools installation (beginning of each installation week) - panels transport to the pit (in parallel with installation of lifting tools) installation schedule 1 panel in vertical position 2 balconies fixation (30  1 hour) 3 copper braid fixation (30 m  1/2 hour) 4 cable supports (100  1 hour) 5 panel lifting (1/2 hour) 6 positioning of the following panel (1/2 hour) 7 gluing & riveting (1 hour) 8 safety electrical soldering (1/2 hour) 9 check of some balconies alignment (with ruler) less than one working day for each panel: one half-station a week

beginning installation can delay due to lifting tools procurement (new supports + FC) PLANNING M5 (+M4?) cryo side installed before Christmas restarting middle January switch to pit side on February ending M2-M5 beginning March M1 in stockage area (or immediately after M2-M5 installation)

walls crates cables gas chambers electronics

M4-M5 racks modification for cooling critical positioning power and water distribution crates prototype in November arrival middle February backplane mounting Transition Boards necessary to install cables waiting for crates M2-M3 gas Q1-Q4 (top) Q2-Q3 (bottom) M2-3 M4-5

MARATON system when ? rad tests are delaying purchase

walls crates cables gas chambers electronics

status of the cabling materials procurement (middle October 2005) supports: ordered LVDScable: waiting for a big prototype connectors: ordered assembly: at CERN (1/3? 100%?) ECS cable: see LVDS connectors: soon ordered assembly: during vestition ? HV cable: probably soon on CERN catalogue connector:... assembly:... LV cable: waiting for a sample to be submitted to SC connectors: ordered assembly: commissioned GNDbraid: ordered

installation philosophy (possible scenarios  to be decided) LVDS:middle November measurement of actual length if realistic then assembly (fixed length) with connectors and capacitor on shielding installation starting on TB side (smaller space for extra lengths) if not assembly double length cables with two TB side connectors installation + cut + re-connectorization on chamber side + re-test ECS: assembly with nominal length (pulsing delay must be known) installation if too short/long  moved to closer/more distant chamber + re-labeling LV:assembly with nominal lengths (equal lengths from each PS source) cable recuperation “somewhere” HV:one cable/chamber + patch cords length ??? gas piping: copper pipes cut on situ distribution boxes screwed on the wall (over cables, under chambers)

installation sequence (a possible scenario  to be decided) 0 grounding braid already installed 1 LVDS on the wall (xxx/half station) 2 ECS on the wall if space is available 36 10/12 mm vertical piping 3 gas 36 distribution boxes (1 – 2 weeks/half station) 276 chamber connections 4 LV under balconies (supports?) 5 HV under balconies (supports?) 6 cooling ??? schedule ??? ??? how much parallelism ???

installation configuration (before June 2006)

MPO cassette 6 adaptators MPO-MPO Optical fibres (clock, TRG, DAQ) 12 fibers ribbon 1 fiber with SC connector MPO connector 96 fibers cable (8 ribbons 12 fibers each) 12 panels crate

+ long distance cabling (procurement phase...) MARATON 385V + controls + patch panels CAN powered and non powered links + patch panels HV long distance cables (???) + short distance cabling (procurement phase...) MARATON 385V + controls + patch panels optical patch panels and patch cords in ODE crates LV patch panels HV no more patch panels (?)

walls crates cables gas chambers electronics

chamber hanging system (to be designed from scratch) target on sensitive area centre (<0,5 mm)

chamber installation sequence (to be agreed) 1chamber transport to nacelle 2leveling on the nacelle with the hanging system 3gas, HV, LV, gnd, ECS, LVDS connections 4translation on balconies 5spacers (nominal height) under chamber 6fixation 10 chamber/day 4 on one side + 6 on the other (to be checked) start from wall bottom 10 chambers survey at the end of the day

schedule: survey: 1 hour every 10 chamber

tests on mounted chambers (when?) connection test CARDIAC - TB (pulsing with SB) LV connection test (measuring current) gas leakage test... how? HV test (measuring current) switch on (?)

walls crates cables gas chambers electronics

steps of electronics commissioning (to be decided) SB already installed IB installation (start when man power will be available) ODE installation test ODE CANbus link test of IB – ODE connections DAQ test using ODE histograms collected with noise optical transmission test to L0 trigger optical transmission test to DAQ switch ECS/L0/DAQ on (?)

following steps (too early to be discussed now) pit side M1 temporal alignment xxxxxxxxx

!!!