Apparatus and Method To Test Drilling Fluid Stability “Sag Tester™”

Slides:



Advertisements
Similar presentations
Physician Selection Criteria 1) Perspective - Clinical - Political - Scientific 2) Technical - Inventor - Evaluator 3) Scientist/Investigator.
Advertisements

Due Diligence of Technology Mission Critical: The Rocky Research scientist, engineers & mfg specialist are dedicated to assist potential investors in.
SPE Getting the Most out of Networked Drillstring Petersen, Sui, Frøyen, Nybø Center for Integrated Operations in the Petroleum Industry & SINTEF.
MDT JOB PLANNING AND INTERPRETATION
Halliburton Makes Oil Exploration Safer Using MATLAB and Neural Networks MATLAB® and Neural Networks MathWorks Products Used: MATLAB Compiler MATLAB Neural.
SPE WITSML: Technology to Business (T2B) for the Oilfield J
Wind Flow Over Forested Hills: Mean Flow and Turbulence Characteristics CEsA - Centre for Wind Energy and Atmospheric Flows, Portugal J. Lopes da Costa,
Completion Object Overview June 2013 WITSML/PRODML Standards.
Software and hardware complex of experimental plant for pulp and paper production Master student of MMA department : Anton Kaverin Perm National Research.
Project Title (as descriptive as possible) Group Members CPE Computer Engineering Design I Electrical and Computer Engineering.
Integrated Drilling and Logging Program Approach in HPHT Environment: Successful Drilling of Deepwater Oberan Field, Nigeria, ENI Deepest Well in Deep.
HYDRUS_1D Sensitivity Analysis Limin Yang Department of Biological Engineering Sciences Washington State University.
Principles of Marketing
Team 10 Air Conditioning Experiment Members –Sean Gallagher –Pamela McDowell –Brian Davison –Prathana Vanarath Sponsors –Dr. Wexler –Dr. Advani Advisor.
Chapter 5 Control Using Wireless Transmitters. Measurement and Control Data Sampling Rate  To achieve the best control response, the rule of thumb is.
Team 10 ME Project: Air Conditioner Lab Members Customer Advisor Sean M. Gallagher, Brian Davison U of D ME Department Dr. Keefe Prathana Vannarath, Pam.
CENTENNIAL HYDRAULIC ISOLATION CONTROL SYSTEM (CHICS) Peter Bergin Trevor Hartley Centennial Newstan In conjunction with APT Training.
Confidential to SMD JIP
BASIC DRILLING SCHOOL. COURSE OBJECTIVES During this drilling school you will get all the knowledge about drilling oil and gas wells, design requirements,
Registration Fee : This fee does not include 7% VAT, accommodation, and transportation, but include 2 break and a lunch during the session day, instruction.
Scientific and production company “ALTERNATIVE TECHNOLOGIES”, CJSC Russia, Novosibirsk region, Koltsovo, 14 Tel./Fax: (383)
Well Testing Initial production tests at surface after wellbore cleanup and fracing. Sometimes called initial potential or IP. IP= Initial Production IPF.
ALRDC Seminar New and Novel Artificial Lift Technologies ConocoPhillips, Houston, Texas May 14, 2014 Retrofitted Continuous Chemical Injection – The Next.
Tolerance Synthesis “ Relationship between Geometrical Tolerancing and Product Function ” Irfan A Manarvi Prof. Neal P Juster DMEM, CAD Centre University.
Heliocentris Commercial Confidential 1 Integration of Industrial Fuel Cells in Technical Applications Using the NEXA ® Training System Dr. Claus Fischer.
1 Coal Mine Methane Emission Reduc tion Projects By Oleg Tailakov UNDP April 29 th, 2008.
2013 Nov. Research On Periodic Oscillation Test Equipment for Thyristor Valves TBEA Shenyang Transformer Group Co., Ltd. TBEA Energy (India) Pvt Ltd. Reporter:
Performance Through Engineering Extended Reach/Horizontal Drilling Solutions EXTENDED REACH / HORIZONTAL DRILLING.
Decontamination of filed equipment used in environmental site characterization and ground-water monitoring projects University of Arkansas 11/13/2006 By.
Audit projet Ste p 1 Margot Le Roux Josselin Le Testu Anne Lutignier.
Mechanical Measurement and Instrumentation MECN 4600
Department of Tool and Materials Engineering Investigation of hot deformation characteristics of AISI 4340 steel using processing map.
Pump Controller Team Number: May06-12 Team Members Dwayne Stammer CprE Francois Munyakazi EE Dan Paulsen CprE/EE Faculity Advisor Nicola Elia Client Viking.
Results Based Management: Logical Framework Matrix (LFM) December 30 th, 2009 Abeer Shakweer, Ph.D., Planning and Monitoring Manager Science and Technology.
MSc and BSc projects for 2005/2006 Supervisor: Rune W. Time These projects are mainly intended for MSc thesis work, but may be simplified to BSc thesis.
TT Conducting a Successful JIP By Dr. William C. Maurer DEA Fourth Quarter Meeting November 20, 1997.
1 Saxony-Anhalt EU Twinning RO 04/IB/EN/09 State Environmental Protection Agency Wolfgang GarcheWorkshop European Standards Requirements of.
Modeling of Cuttings Transport In Drilling Applications Using Intelligent Materials MOCUT Thematic Area Intelligent Materials Drilling Technology.
Viking Pump Flow Manager - Phase 2 Senior Design May
Identification of national S&T priority areas with respect to the promotion of innovation and economic growth: the case of Russia Alexander Sokolov State.
TOWARDS GREENISH WORLD TRITECH INTERNATIONAL HOW WE IMPLEMENT KAIZEN.
Track Your Keyword Rankings and Competitors Rankings - Live.
Fluid Flow Aspects of Hole Cleaning and Cuttings Transport in Well Drilling Responsible: prof. Rune W. Time An important problem in oil well drilling is.
ALFRED NOBEL UNIVERSITY, DNIPROPETROVSK THE DEPARTMENT OF INTERNATIONAL ECONOMY AND ECONOMIC THEORY Daria ANANIEVA MANAGING THE INTERNATIONAL COMPETITIVENESS.
CONTROL ENGINEERING IN DRYING TECHNOLOGY FROM 1979 TO 2005: REVIEW AND TRENDS by: Pascal DUFOUR IDS’06, Budapest, 21-23/08/2006.
DARREN'S PROJECT PRESENTATION 8051 Controlled Speedo For a Trolley On An Inclined Ramp.
A.L.F. Enterprise n Electrical Parameters Measurement Component (EPMC) n Boris Fradkin ©A.L.F.Enterprise Boris Fradkin.
Air Conditioning Experiment Department of Mechanical Engineering University of Delaware.
GEO Software & Chris Jacobson
Presentation of Drilling Rigs GBU-5M “Wasp” and GBU-7M “Colibri”
Supervisor services. Project manager Technological group Chief supervisor Supervisors facilities HSE Quality engineer HSE engineer Administrative support.
Kick Submited to :- Submitted by:- Er Akash Rana Devahish Yadav B.Tech IIIrd Year Petroleum Technology 1.
Seminar on SDS Final class 5/4/2015. Topics discussed ASR, NLU in dialogue Dialogue management NLG, information presentation Evaluation Error recovery.
Computational Fluid Dynamics - Fall 2007 The syllabus CFD references (Text books and papers) Course Tools Course Web Site:
New Technologies for Low- grade Heat Power Engineering.
Introduction to Well Completions
An Automated Approach to Wellbore Stability Analysis Petroleum Engineering Senior Design II GROUP L: QUENTYN GUGLIELMO HUGH HANNUM CARSON POLLAT BRONSON.
Engineering Design Process Objective: I will be able to describe the steps engineering design process as well as what a prototype is. Teacherspayteachers.com.
SITE INVESTIGATION ARUN MUCHHALA ENGINEERING COLLEGE-DHARI
Veego Instruments Corporation. 35 years successful years.
TRIBOLOGY IN DRILLING OPERATION CHIH LIN, PHD AUGUST 29, 2013.
The Rotation Sleeve System Triangle Equipment AS in co-operation with Ericsson Saab Avionics AB The EXPRO Group.
2. Building Information Modelling
Advisor: Dr. Shangchao Lin
CONTINUOUS PROCESS IMPROVEMENT
Completion Object Overview
سنسور نرم و کاربرد آن در صنعت نفت کشور
Design, Testing and Modeling of Axial Oscillation Tools
Chapter RESOURCE ACCESS AND DEVELOPMENT
CLASS® Compressible Liquid Adaptive Suspension System
Presentation transcript:

Apparatus and Method To Test Drilling Fluid Stability “Sag Tester™” Associate Prof. Shteryo Lyomov, Ph.D. Mining and Geology University Department Of Drilling and Oil and Gas Production 1700 Sofia BULGARIA

Project Background Field problems associated with drilling mud stability leading to barite sagging/hole cleaning still exist. Lack of relevant/suitable equipment for direct testing of drilling mud stability at the rig site and laboratories with respect to stability (barite sagging). Gained experience in barite sag investigation.

Project Goals Pre – project. Project. Development of equipment - hardware and software; Tuning the equipment (sensitivity, accuracy, reliability and software debugging) at lab conditions and setting of initial criteria for drilling mud evaluation. Project. Development and production of industrial Sag Tester™; Conducting of training seminars for the sponsors; Field testing and implementation; Field debugging of the firmware and software; Verify mechanical/software reliability; Determining best operation practice; Commercial promotion.

Description The barite Sag Tester™ uses pressure measurements in order to evaluate drilling mud stability. The main idea is based on the Boycott effect and is a further development of the work published by P. Skalle, K. R. Backe, S. K. Lyomov et. al.* *P. Skalle, K.R. Backe, S.K. Lyomov et. al. “Barite Segregation in Inclined Boreholes” JCPT, special Vol. I, paper 97-76. Pressure measurements are used because the process of barite/particle settling influences strongly/mostly the drilling mud density.

Description, (continued) Barite Sag Tester™* Components. V – pipe; Z – pipe;  – well bore inclination; Bypass valve; Pressure sensors; Temperature sensor; D/A and control system. * Patent Pending Reg. No. 107573/BGR patent office.

Description, (continued) Drilling mud is poured into the barite Sag Tester™, while the valve is opened. This assures equal height of the mud columns in the V - pipe and Z - pipe. Then the valve is closed, pressure and temperature measurements are taken in an interval of sec/min for a period of 5 - 6 h. The difference between the pressures measured in the bottom of V - pipe and Z-pipe after a ? h time interval is a direct indication for drilling mud stability. The results from a testing two drilling mud are shown on the next 2 slides.

Description, (continued)

Description, (continued)

Mud Stability Evaluation Criteria Pressure reduction in the V – pipe dP1; Pressure reduction in the Z – pipe, dPz2; Bottom hole T and P; Borehole inclination – .

Sag Tester™ Features Simple principle of measurement; Quartz pressure sensors with high accuracy; Temperature measurement; PC based D/A and control system allows real time measurement of the drilling mud behavior; The Sag Soft™ software accounts for the influence of the borehole P, T as well as inclination – ; Simple to use at laboratory and at the rig site.

Competitive Analysis Competitors. Strengths. Limitations. sag index, sag number and sag register; software (HYDRAUL™, MUDMAN™); controlled stress and low shear rate/gel measurements. Strengths. Equipment/software exists on the market. Limitations. track the barite sag, not predict (sag index/register), impractical to use (sag number) ; not direct measurements; flow conditions in wellbore differ from these in the viscometer.

Competitive Analysis, (continued) Sag Tester™. Strengths. Uses simple principle; Direct measurement of the mud parameter related to the barite sagging - density/pressure; Easy to operate and analyze - PC/Sag Soft™ software. Limitations. New unknown equipment; Lack of field experience/data; Needs market promotion.

JIP Team/Resources Team working on the project. Project leader – Ass. Prof. Sht. Lyomov, Ph.D. Experimental work leader- Ass. Prof. L. Gerov, Ph.D. Design work leader - Prof. N. Nenkov, Ph.D. Electronics - Rhoe BG electronics Ltd. Manufacturing - University workshop, ZMM - Sofia.

JIP Team/Resources, (continued) Project resources. Pre - project 64,000 $ (4 participants 16 000 $ each) Project 175,000 $ (5 participants 35 000 $ each) Location. Mining and Geology University, Department Of Drilling and Oil & Gas Production, 1700 Sofia, BULGARIA.

Schedule Pre - project 12 months. Design 2 months Project 12 months. Building the Sag Tester set up 3 months Laboratory testing 7 months Project 12 months. Design/production industrial prototype 2 months Testing of industrial prototype 9 months Field implementation and testing 9 months Data analysis and final reporting 6 months

Expected Results Development of apparatus and method to test drilling mud stability with respect to barite sag – The Sag Tester™. Set and field prove of criteria for drilling mud evaluation. Development of software Sag Soft™ to predict mud behavior based on measurement with the Sag Tester™. Market promotion of new equipment and technology, that reduces lost time for mud conditioning/circulation and extra expenses.

Thank you for your attention! Shteryo