Yellowtail Dam & Bighorn Lake Billings, Montana January 2011 RECLAMATION Managing Water in the West.

Slides:



Advertisements
Similar presentations
Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010.
Advertisements

Yellowtail Dam & Bighorn Lake Billings, Montana October 18, 2007 RECLAMATION Managing Water in the West.
John H. Kerr Dam and Reservoir John H. Kerr Dam and Reservoir U.S. Army Corps of Engineers Wilmington District.
US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
Nisqually Glacier Glaciers are important sources of fresh water to human, plant and animal components of downstream communities. Glacier-fed streams traditionally.
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 8, 2009 RECLAMATION Managing Water in the West.
® Cumberland River Basin 2007 Hydrologic & Hydraulic Drought Joy Broach – Aquatic Biologist Planning Branch - Environmental Section SWPBA Tennessee November.
Chinook Salmon Chinook Salmon, also called King Salmon, inhabit the White River. Construction of the flood-protection structure Mud Mountain Dam formed.
Aspinall Unit Seasonal Operation Goals Fill Blue Mesa Reservoir before end of runoff. Operate to the 2012 Aspinall ROD at the Whitewater Gage. Meet the.
US Army Corps of Engineers BUILDING STRONG ® USACE – ACF Operations Bailey Crane Water Management USACE, Mobile District.
Cedar River Instream Flow Management Balancing Certainty and Flexibility.
June 26, PCWA - Middle Fork Project Project Operations
Hoover Dam – Colorado River. Reasons for Dams Flood Control 39,000 dams worldwide higher than 15 m (ICOLD, 1988)
Yakima Project Operation Issues Drought 2005 Chris Lynch Yakima Field Office March 2005.
Upper Colorado River Endangered Fish Recovery Program.
Yellowtail Dam & Bighorn Lake Potential Revisions to Draft Criteria Based on Comments and Operating Experience Billings, MT October 13, 2011 RECLAMATION.
A Preliminary Analysis of the Impacts of Climate Change on the Reliability on West Side Water Supplies Richard Palmer and Margaret Hahn Department of Civil.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
‘The world’s greatest plumbing system’ An example of how a river is managed to use its water as a resource.
Colorado River Overview February Colorado River Overview Hydrology and Current Drought Management Objectives Law of the River Collaborative Efforts.
Hydropower Dams © The GlobalEd 2 Project Photo credit: Noodle snacks, Wikimedia Gordan Dam, a dammed hydro facility in Tasmania.
Federal Columbia River Power System Operations Planning.
WATER RIGHTS AND ENDANGERED FISH FINDING SOLUTIONS FOR FLOWS UTAH DIVISION OF WATER RIGHTS
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
U.S. Army Corps of Engineers TMT Annual Review Weather and Water Summary Presented by Karl Kanbergs USACE, Water Management Division December 7, 2011.
Future of the Columbia River Treaty A British Columbia Perspective 2014 PNWA Summer Conference Coeur d’Alene June 23, 2014 Kathy Eichenberger B.C. Ministry.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
Yellowtail Dam & Bighorn Lake Operating Criteria Review Billings, MT September, 2010 RECLAMATION Managing Water in the West.
Title Slide HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
BUILDING STRONG SM 1 Columbia River Salmon and Federal Columbia River Power System Rock Peters Senior Program Manager.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
Hydro Power 102. Hydroelectric Models in the Northwest.
Middle Fork Project Project Description April 25, 2006.
Yellowtail Dam & Bighorn Lake Climate Change Billings, MT September, 2010 RECLAMATION Managing Water in the West.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
CORPS OF ENGINEERS NWS Meeting Tallahassee, FL, July 19, 2006.
CANADIAN COLUMBIA RIVER FORUM Biological Opinion: An overview of The impacts on Water Management Jim Barton, Chief of Corps of Engineers Columbia Basin.
Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING III U.S. Army Corps of Engineers Northwestern Division North Pacific Water.
Managing Western Water as Climate Changes Denver, CO February 20-21, 2008.
Water Supply at Beaver Lake, Arkansas Little Rock District US Army Corps of Engineers ® One Corps Serving The Army and the Nation.
Modeling Development CRFS—Technical Meeting November 14, 2012.
U.S. Department of the Interior U.S. Geological Survey Simulating Temperature Management under Climate Change at Detroit Lake, OR Norman Buccola, John.
Missouri River Forecaster’s Meeting January 28-29, 2014 Scott Guenthner Great Plains Regional Office Billings, Montana Reclamation Reservoir Status.
Yellowtail Dam & Bighorn Lake 2010 Operation Review Billings, MT January 2011 RECLAMATION Managing Water in the West.
Yellowtail Dam Modeling Results Brian Marotz Hydropower Mitigation Coordinator.
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 9, 2008 RECLAMATION Managing Water in the West.
Watershed Management Muhammad Dilshad Habib 2004-ag-1414
USACE Managing a Drought  Overview  Timeline  Depletion Scenario Current Status– 17 Oct 07.
CANADIAN COLUMBIA RIVER FORUM U.S. Flood Control and Operational Perspective Jim Barton, Chief of Corps of Engineers Columbia Basin Water Management Division.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
NON-TREATY STORAGE AGREEMENT “Introduction to Operations and the Non Treaty Storage Scenarios” Presenter: Jim Gaspard.
Bighorn Long-Term Issues Group Where Are We Going?
NID Data Model based on HUC CE394K.3 Term Project by Seungwon Won December 7, 2000.
Title Slide HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY.
Model Overview Application of CALSIM II to Friant System.
US Army Corps of Engineers BUILDING STRONG ® Corps of Engineers Omaha District Forecast Update Brian Twombly Kellie Bergman January 2010 Jay Lincoln.
Yellowtail Dam & Bighorn Lake Reservoir Operating Criteria Proposed Modifications Lovell, Wyoming July 29, 2008 RECLAMATION Managing Water in the West.
Water Management of the Okanagan Lake Regulation System October 2015 Presented to the Osoyoos Lake Water Science Forum Shaun Reimer, P.Eng. Public Safety.
Defining Good Ecological Potential : Method used in the UK Niall Jones Hydro-morphology senior advisor Environment Agency.
CRFS Technical Committee Fall Meeting LC Operations Update December 8, 2015.
Group Members Tevin Walker Deidre Brown. Objectives Define the term HYDROELECTIC ENERGY To identify the use/importance of this energy source To explain.
Reclamation and Hoover Dam It’s All About The Water.
Strategies for Colorado River Water Management Jaci Gould Deputy Regional Director Lower Colorado Region.
1 Bonneville Power Administration. 2 BPA markets power from 31 federally owned dams, one non-federal nuclear plant, and wind energy generation facilities.
Wyoming Association of Rural Water Systems Harry LaBonde Jr, P.E. Director Wyoming Water Development Office April 19, 2016.
Yuma Agriculture Water - Rights and Supply Terry Fulp Director, Lower Colorado Region Yuma Agriculture Water Conference January 13, 2016.
Assoc. Prof. Dr. Tarkan Erdik
GANDHINAGAR INSTITUTE OF TECHNOLOGY
Albeni Falls Dam Operations
Presentation transcript:

Yellowtail Dam & Bighorn Lake Billings, Montana January 2011 RECLAMATION Managing Water in the West

Operating Requirements & Objectives Mandatory /Legal –Recognize all senior downstream water rights –Fulfill compact obligation with Native American Tribes –Meet contract commitments for stored water –Dam safety Operating Objectives –Maximize power generation benefit –Maintain storage space for flood control –Maintain desired lake levels for recreation, reservoir fishery and waterfowl –Maintain desired river flows for the river fishery and water quality

Multipurpose Benefits Water Rights –Regulate stream flow and release water for irrigation Compact Commitments with N. Cheyenne and Crow tribes Industrial water supply –6,000 AF contract with PPL- MT Flood control –Flood protection Benefits= $113 million since construction (2007) Hydropower –260 MW powerplant (8,000 cfs) –Peaking power supplied to two grid systems –Average Annual generation = million kwhrs ( ) –Average Annual power = $20 million per year –Montana and Wyoming both benefit from power generated Fish & Wildlife –Lake fishery, river fishery, and waterfowl Recreation –Bighorn Canyon Recreation Area and Bighorn River Water Quality –Reduce high levels of nitrogen supersaturation –Sediment retention

Operational Goals Prior to Review Desired lake elevations requested by lake interests –Minimum desired lake elevation recommended by the NPS for the summer recreation season –Minimum late fall lake elevation recommended by the Wyoming Game and Fish to provide suitable waterfowl habitat –Draft reservoir to 3630 to prevent ice-jams from forming in low end of Shoshone River –Maximum lake elevation recommended by the NPS for the summer recreation season to protect facilities –A rising reservoir level through the spring for walleye spawning.

Operational Goals (continued) Desired river flows requested by Montana FW&P by letter dated November 19, ,500 cfs – to provide good spawning, rearing and cover conditions in all major side channels. 2,000 cfs - to provide adequate spawning and rearing conditions in most side channels but cover for adult fish is limited. 1,500 cfs – to provide only main channel habitat and no side channel habitat Minimum release included in the 1962 Definite Planning Report for the Yellowtail Unit – 1,000 cfs

Operational Goals (continued) Power generation –Utilize available water supply to maximize generation at time of greatest demand –Maximize reservoir head to provide the greatest generation per unit of water Flood control –Coordinate operations with the Corps of Engineers to provide system benefits –Draft water from the Joint-Use pool based on mountain snowpack forecast to provide space for expected runoff while allowing the reservoir to fill to the top of the joint-use pool by end of July. –Operate the Exclusive flood pool as directed by the Corps of Engineers to control rain flood events and high snowmelt runoff.

QUESTIONS & COMMENTS