Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.

Slides:



Advertisements
Similar presentations
Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010.
Advertisements

Yellowtail Dam & Bighorn Lake Billings, Montana October 18, 2007 RECLAMATION Managing Water in the West.
John H. Kerr Dam and Reservoir John H. Kerr Dam and Reservoir U.S. Army Corps of Engineers Wilmington District.
US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Water and the Confederated Tribes of Warm Springs.
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 8, 2009 RECLAMATION Managing Water in the West.
Aspinall Unit Seasonal Operation Goals Fill Blue Mesa Reservoir before end of runoff. Operate to the 2012 Aspinall ROD at the Whitewater Gage. Meet the.
Negotiating our Water Future in Colorado & the Colorado River Basin Colorado’s Water Plan & the Colorado Basin Plan February 2015 Update Presentation developed.
US Army Corps of Engineers BUILDING STRONG ® USACE – ACF Operations Bailey Crane Water Management USACE, Mobile District.
Yakima Project Operation Issues Drought 2005 Chris Lynch Yakima Field Office March 2005.
Upper Colorado River Endangered Fish Recovery Program.
Yellowtail Dam & Bighorn Lake Potential Revisions to Draft Criteria Based on Comments and Operating Experience Billings, MT October 13, 2011 RECLAMATION.
Yellowtail Dam & Bighorn Lake Billings, Montana January 2011 RECLAMATION Managing Water in the West.
Drought and the Central Valley Project August 2014.
How Much Do We Have Left? Coming to Terms With the Colorado River Water Availability Study Annual Colorado Water Workshop July 21, 2010 Ben Harding – AMEC.
Colorado River Overview February Colorado River Overview Hydrology and Current Drought Management Objectives Law of the River Collaborative Efforts.
CRFS Technical Committee Fall Meeting LC Operations Update November 20, 2014.
Federal Columbia River Power System Operations Planning.
WATER RIGHTS AND ENDANGERED FISH FINDING SOLUTIONS FOR FLOWS UTAH DIVISION OF WATER RIGHTS
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
Future of the Columbia River Treaty A British Columbia Perspective 2014 PNWA Summer Conference Coeur d’Alene June 23, 2014 Kathy Eichenberger B.C. Ministry.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
Yellowtail Dam & Bighorn Lake Operating Criteria Review Billings, MT September, 2010 RECLAMATION Managing Water in the West.
Title Slide HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY.
Youghiogheny River Lake Storage ReAllocation for Downstream Water Supply by Werner C. Loehlein, P.E.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
FERC Relicensing of the Toledo Bend Project – Hydroelectric Power Generation Drought Hydroelectric vs. Water Supply Sabine River Authority Issues.
US Army Corps of Engineers BUILDING STRONG ® Savannah River Basin Drought Workshop October 24-25, 2012.
Water Right Settlement Pyramid Lake Paiute Tribe.
January 29, 2013 Lake Diefenbaker Reservoir Operation Proposed Operating Manual Development.
Integrated Regional Watershed Management Plan Presentation – March 12, 2013 HLVRCD.
Middle Fork Project Project Description April 25, 2006.
Yellowtail Dam & Bighorn Lake Climate Change Billings, MT September, 2010 RECLAMATION Managing Water in the West.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
CORPS OF ENGINEERS NWS Meeting Tallahassee, FL, July 19, 2006.
Pyramid Lake Paiute Tribe Water Rights Settlement Presented by: Terri Edwards, Area Manager Lahontan Basin Area Office August 26, 2015.
Cowichan Lake Storage Assessment – 2015 Final Results Craig Sutherland, M.Sc., P.Eng. July 27, 2015.
CANADIAN COLUMBIA RIVER FORUM Biological Opinion: An overview of The impacts on Water Management Jim Barton, Chief of Corps of Engineers Columbia Basin.
Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING III U.S. Army Corps of Engineers Northwestern Division North Pacific Water.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
Managing Western Water as Climate Changes Denver, CO February 20-21, 2008.
Modeling Development CRFS—Technical Meeting November 14, 2012.
Yellowtail Dam & Bighorn Lake 2010 Operation Review Billings, MT January 2011 RECLAMATION Managing Water in the West.
USBR Updates: Green River CRFS Meeting March 27, 2014.
Overview of Alabama Power’s Tallapoosa River Operations Martin Dam Relicensing Informational Meeting April 1, 2008 Andy Sheppard, P.E. Project Mgr. - Hydro.
Yellowtail Dam Modeling Results Brian Marotz Hydropower Mitigation Coordinator.
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 9, 2008 RECLAMATION Managing Water in the West.
Aspinall Operations Operational Considerations Aspinall Unit Purposes – Water storage / Compact Development – Power Production – Flood Control.
US Army Corps of Engineers BUILDING STRONG ® Boise River Feasibility Study Ellen Berggren, PMP Outreach Coordinator/ Project Manager Idaho Governor’s Roadless.
USACE Managing a Drought  Overview  Timeline  Depletion Scenario Current Status– 17 Oct 07.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Columbia River Treaty Past, Present and Future Status of Columbia River Treaty Discussions: a BC government perspective October 7, 2015 Osoyoos, BC Kathy.
NON-TREATY STORAGE AGREEMENT “Introduction to Operations and the Non Treaty Storage Scenarios” Presenter: Jim Gaspard.
Bighorn Long-Term Issues Group Where Are We Going?
CVPIA §3406(b)(2) Water Operations on the Sacramento River Sacramento River Conservation Area Forum Technical Advisory Committee February 7, 2012.
Multi-objective Optimization
Title Slide HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY.
Yellowtail Dam & Bighorn Lake Reservoir Operating Criteria Proposed Modifications Lovell, Wyoming July 29, 2008 RECLAMATION Managing Water in the West.
Water Management of the Okanagan Lake Regulation System October 2015 Presented to the Osoyoos Lake Water Science Forum Shaun Reimer, P.Eng. Public Safety.
CRFS Technical Committee Fall Meeting LC Operations Update December 8, 2015.
Reclamation and Hoover Dam It’s All About The Water.
Strategies for Colorado River Water Management Jaci Gould Deputy Regional Director Lower Colorado Region.
CRFS Technical Meeting LC Operations Update March 27, 2014.
Trinity Lake Minimum Pool and Enforceable Temperature Standards for the Trinity River Tom Stokely, Pacific Coast Federation of Fishermen’s Associations.
Tillman Creek Acquisition
Native and Wild Trout Conference April 21, 2016 Phoenix AZ
Kansas Experience in Technical Negotiations for Tribal Water Right Settlements Symposium on the Settlement of Indian Reserved Water Rights Claims, Great.
Albeni Falls Dam Operations
How the Missouri River is Operated - WAPA’s Role - Mid-West Electric Consumer Association Annual Meeting December 11, 2018 | Denver, CO Lori L. Frisk VP,
Presentation transcript:

Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations and long term management discussions RECLAMATION Managing Water in the West

Yellowtail Unit and Bighorn Canyon National Recreation Area Long-Term Issues Group

Draft Problem Statement “The amount, timing, and location of water available in the Big Horn River system to support all required and desired uses including, but not limited to, tribal obligations, recreation, aquatic organisms, power generation, and irrigation is limited and variable. Our challenge is to take a new look at all uses and needs, while recognizing commitments to authorized project purposes and other legal obligations—including water rights.”

Draft Group Charter “The Big Horn River System Long-Term Coordinating Group has been formed to identify, explore, and recommend alternative courses of action to the federal and state agencies responsible for managing Big Horn River and Big Horn Reservoir resources for their consideration as part of long-term management strategies.”

Yellowtail Unit Authorization: Flood Control Act of Dec. 22, 1944 (ch.665 Stat. 887) Senate Document 191—USACE/Reclamation plan for Missouri River Basin Development Project Purposes –Flood Control –Hydropower –Irrigation –Recreation –Fish & Wildlife –Sediment storage

Bighorn Canyon National Recreation Area Authorization: Public Law , October 15, 1966 Purpose “In order to provide for public outdoor recreation use and enjoyment of the proposed Yellowtail Reservoir and lands adjacent thereto in the States of Wyoming and Montana by the people of the United States….”

OPERATIONS - A BALANCING ACT AMONG THE AUTHORIZED PURPOSES OF THE YELLOWTAIL UNIT and the AUTHORIZED PURPOSES OF THE BIGHORN CANYON NATIONAL RECREATION AREA

Administration of the Yellowtail Unit and the Bighorn Canyon National Recreation Area Memorandum of Agreements between Reclamation and the Park Service: December 1964 (signed by the Secretary) Updated March 1972

Operating Requirements & Objectives Mandatory /Legal –Recognize all Senior Downstream Water Rights –Fulfill Compact obligation with Native American Tribes –Meet Contract Commitments for Stored Water –Dam Safety Operating Objectives –Maximize Power Generation Benefit –Maintain Storage Space for Flood Control –Maintain desired Lake levels for Recreation, Reservoir Fishery and Waterfowl –Maintain desired River Flow levels for the River Fishery and water quality

Bighorn Lake Inflow Distribution Based on Data Bighorn River Accretions less Depletions (Gain) 30% Buffalo Bill Release 28% Boysen Release 42% Annual Total

MULTIPURPOSE OBJECTIVES Elevations Targets Sept – Oct: A Desired Lake Elevation of 3635 provides space for late summer and fall rainstorms, recreation enhancement and wildlife habitat March: Position Lake Level between 3605 and 3615 to provide good fall and winter generation, prepare reservoir for spring runoff and provide desired fishery flows. This also increases probability of raising pool during Walleye Spawning July: Fill reservoir to normal full level of 3640 to provide good water supply for all water uses while leaving adequate space to control summer and fall rain events.

MULTIPURPOSE OBJECTIVES Desired River Operating Range 1,500 cfs – Approximate discharge to provide “firm” power generation as identified in DPR and provide minimum target flow for river fishery. Provide more then adequate water for downstream irrigation demands. Protects Reservoir storage in low runoff years except for the period of ,500 cfs – Provides optimum power generation (allows full peaking) while providing more then adequate water conditions for river fishery and irrigation needs