TEAM 6 Case for Cambodia Eric Immerfall Elizabeth Smit Jordan Johnston Lisa Andela Aaron Goodman.

Slides:



Advertisements
Similar presentations
Sino-Africa Initiative Project Monitoring & Evaluation Final Exchange January 2014.
Advertisements

An-Najah National University Faculty of Engineering
SEMINAR IN ADVANCED STRUCTURE analysis and design of box culvert
Team 6 Eric Immerfall Elizabeth Smit Jordan Johnston Lisa Andela Aaron Goodman.
Team 6 Eric Immerfall Elizabeth Smit Jordan Johnston Lisa Andela Aaron Goodman.
Framing Agriculture Structures
Images and text from HKT Architects – Project Architects.
Outlines:-Outlines:- Environmental Design. Architectural Design Modifications. Structural Design Quantity compare Lighting and Mechanical Design.
Green Building Design Scott Lowe Professor Civil and Environmental Engineering Department Manhattan College.
Express Team University of New Mexico February 24, 2006.
Chapter 8 Plot Plans.
How to do an estimate. Steps 1) Estimate from bottom up –How you construct the project –Lets you get an understanding of project path –Lets you find errors.
Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.
Picture Lake Geneva, Switzerland Surrounded by the Alps 20°C mean temperature in summer Annual snow fall – 30in Site Context.
Standard Grade Graphic Communications
RAINWATER HARVESTING IN THE HOSPITALITY SECTOR
MEDICAL SEMI-TEMPORARY STRUCTURES Examples of medical semi- temporary structures in MSF programs By Jérôme Michon and Yannick Garbusinski and Hugues Robert.
Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.
Health Clinic – Las Mercedes, Honduras Janelle Barth, Stephanie Chang, Greer Mackebee, Walter Li.
2001 Winter Presentation. Site Location Site View.
Question 1 IrlEspCypGerm Solarx PVx Wind Heatx Water turbines xx.
Anouchka Poloubinski-Blandin Anastasija Krivonosova Anthony Baptista Luis Fernandes Plains-Wanderer N° 9.
Team 6 Eric Immerfall Elizabeth Smit Jordan Johnston Lisa Andela Aaron Goodman.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
RESIDENTIAL CONSTRUCTION UNIT Grade 10 Construction Technology TCJ200.
Copyright © Texas Education Agency, All rights reserved. Architectural Design The Foundation Plan.
Eric Immerfall Elizabeth Smit Jordan Johnston Lisa Andela Aaron Goodman.
Honduras 60 % Stephanie Chang Walter Li Greer Mackebee Janelle Barth.
WRIGHT ENGINEERING BY: CHAMPION HEIGHTS COMMERCIAL BUILDING ERIC BEALS RYAN KRAUSE CAMERON MILLER RANDY RODRIGUEZ HORACIO MONTEJANO.
Team Central Winter Presentationslide 1 of 65 Winter Presentation AEC Global Team Class 2002 Winter presentation Team Central.
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
By: Dakota White.  Slides  Elements  Project Description  Client Survey  Bubble Diagram  Design Sketches  Code Considerations  Habitat for Humanity.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
By Ahmed Munshey.  Front Page  Other Information  Contents  Objective  House Design  Basic Human Needs  Lowering Ecological Footprints  Materials.
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
UNT in partnership with TEA. Copyright © . All rights reserved.
Framing the House. Platform Framing Platform framing.
IET 120 CONSTRUCTION PROJECT Name: Elizabeth McClain.
Chapter 7 : Construction 1. Adobe – a mixture of clay and straw used as a structural material in the Southwestern United States.
BUILDING CONSTRUCTION
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
COFFERDAMS.
Estimating and Scheduling CEE 492
Drafting 2 (Arch) Quiz Review #4 Quiz Review. 1. What is the difference between a pier and column? Bearing capacity Soil impact Concrete block Reinforcing.
Drafting 2 (Arch) Quiz Review #3 Quiz Review. 1.Dashed lines that follow the counters in a kitchen floor plan most likely represent: A dishwasher Upper.
RESIDENTIAL RAINWATER HARVESTING PROJECT ALTITUDE ENGINEERING, INC. PRESENTERS: HAYLIE BREWER, ERICA KIESOW,& BRETT HIGHTOWER DATE: APRIL 28 TH,
Session 1: Identifying Construction Drawings and Drawing Components.
Fundamentals of Construction
North Hall | American University| Washington D.C.
}السلام عليكم ورحمة الله وبركاته{
THIS IS JEOPARDY.
Foundations of Technology Construction
APPLICATIONS OF TECHNOLOGY
Shyamaghat Rainwater Model Project
Multifamily and Single-family Homes
Redesigning of a Primary school
ET 494: Senior Design Design of a New Hammond Head Start Center
Building Planning And Drawing
Integrative Design of a Secondary School
Framing Agriculture Structures
Fundamentals of Construction GTT – Unit 7 – Green Architecture
International Building Materials and components
Framing the House                                                                                                                   
The sport hall.
Fundamentals of Construction Gateway – Unit 7 – Green Architecture
House Construction Budget Plan
Foundations of Technology Construction
How well do you know these industry terms?
Senior Design Project Prepared for: Dr. Koutsegeras Advisor: E. Rode
Presentation transcript:

TEAM 6 Case for Cambodia Eric Immerfall Elizabeth Smit Jordan Johnston Lisa Andela Aaron Goodman

Presentation Outline Master Plan Layout Design Norms Designs Budget Challenges Lessons Learned Questions

Master Plan Layout Well Solar Pump Fish Ponds Drip Irrigation Common Building Sanitary Facilities Bridge Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

Design Norms Cultural Appropriateness: Through the design, materials, and construction methods of the common Cambodian. Transparency: Communication about the simplicity and reliability of the design. Integrity: Design will facilitate relationships between people and their land. Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

Building Layout 2 nd Floor-  11 dorm rooms Tile roof Steel Roof Framing Concrete Wood/Stucco 1 st Floor- Classroom, Kitchen, 3 full bathrooms open space Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

Roof Design Clay Tiles  Local tiles used  Size no smaller than 0.369m long Steel Framing  Steel angles 3”x3” spaced at 0.369m O.C. Support Beams  W8x10  Spaced at 3m O.C Support Truss  WT4x5 used as outer shape  L30305 is used as bracing Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

Structure Design 2 nd Floor Columns  W8x24 in center at end of building  W10x12 at each corner of building Concrete Design  Second floor slab, beams, columns, floor, foundations  Designed as modular system  3 different modules  3x3m, 3x4m, 3x6m  Reinforcement steel designed Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

First Floor First Floor Includes:  Kitchen  Enclosed in concrete block (along with classroom and restrooms  Classroom  Large space for classes, meetings, worship, etc.  Potential for computer lab  Restroom facilities  Each include toilet, sink, and shower  Storage room  Battery bank storage  Stairway  Wrap design  Foundations  Wall foundations and column footings  Short perimeter wall  Keeps rain out Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

Renewable Energy Source Sizing of the components based on 6kWh demand System Autonomy 3 days Average solar irradiation 4.96 kWh/m²/d o Require 12 Sharp 175 w Panels Battery Bank 12 x 2 volt batteries in series o Require Total Capacity of 1500 Ah Inverter sized with all appliances running o Continuous output power should be approximately 1600 W at 25°C Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

Renewable Energy Source – System Configuration Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

Water Distribution & Irrigation  Water Needs from Well:  Existing common building: 564L/day  New common building: 1692L/day  Soursop Tree: ~8L/day Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions  System Components  Irrigation for vegetable garden (IDEal Drip Kits)  Solar pumps to meet demands PS600 BADU PS 600 HR/C

Sanitary Facility – Bathroom Layout Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions System Plan Three Bathrooms  Sink, Toilet, and Shower in Each Water Demand: 1692 Liters per Day Septic System for Waste Removal  2 Septic Tanks in Series  1 st Tank: 5678 Liters with Baffle  2 nd Tank: 5678 Liters  Drain Field  Approximately 950 sq ft in size

Sanitary Facility Septic System Design Specs 2 Septic Tanks in Series  Extra Storage  Sludge Movement Prevention  Schedule 40 Piping  Minimum Slope is cm per cm 88 sq meter drainage field  Level  Perforated 10 cm Piping  Baffle System Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

Sanitary Facility- Septic System Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

Sanitary Facility – Septic System Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

Bridge Design - Culverts The first model made was the stream as it is now The second model was made with the dam being assumed as part of the ground and with the sides of the stream being excavated to provide room for the structure From there culverts were inserted to find out how many were needed to convey the worst case flow. Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

Bridge Design – Final Design Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

Budget Budget for the Master Plan Water Distribution System$2, Sanitary Facility$3, Common Building$21, Bridge$2, Renewable Energy Source$21, Grand Total$50, Projected costs were based on  Cost of materials  Cambodian price if known, otherwise price in the US  Does not include cost of labor Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

Challenges in Design  Assumptions about site data  Finding local vendors and prices for system components  Different design codes and styles between countries  Culturally appropriate design choices Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

Lessons Learned Keep units straight -metric Document everything Things change- be able to adapt We don’t know everything-make assumptions Getting started is half the battle- where to start Learned a lot about different aspects of site development Communication is key between group members Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

THANK YOU Special Thanks To:  Prof DeRooy-Team Advisor  Prof Dornbos-Biology Prof  Rachel Koopman-Interim Data Coordinator  Interim Group  Roger Lamer-Industrial Consultant  Navy Chann-Chhay & Li Chhay-Client  Founders of Eden School of Agriculture  CEAC Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions