TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
This Part One will address; Type 1 – Fire Resistive and Type 2 – Noncombustible buildings. The future presentations, will cover; Type 3 – Ordinary Type.
Update on FCPS Construction/Renovation Projects August 2009.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Civil Engineering & Architecture 2.3 Residential Design.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
BIMception Proposal Thomas Villacampa Alexander Stough Christopher Russell Stephen Pfund.
Green Building Design Scott Lowe Professor Civil and Environmental Engineering Department Manhattan College.
1 The Central Team Ryan Sawasaki Holger Keitel Joanna Lennartsson Lan Yu Ben Thompson Kevin Nadolny Linda Strömgren 1.
OVERLOOK TOWERS AT DULLES CORNER HERNDON, VIRGINIA Anthony Perrotta AE Senior Thesis – Structural Option.
Commercial Foundations
PERFORMANCE & CODE ANALYSIS TIMBer Inc. ·Brooke Fedder · Marie Rottschaeffer· Izzie Molinuevo· Tena Pettit·
Cindy Miller – Cindy Frey – Ridge Road Rockwall, TX
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Reading Structural Drawings
General Contractors  Over 10 years of Service  Commercial  Military Institutions  Government Agencies  Female Owned and Operated Firm  Teamed with.
C1 Conceptual Design of Buildings Lecturer: XY. 2 List of lectures 1)Multi-storey buildings 2)Floor slabs, primary and secondary beams 3)Joints of floor.
Construction Drawing Occupational Safety and Fundamentals
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
First Baptist Church of Doylestown Senior Thesis Structural Emphasis James Chester Preliminary Phase II Design.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Robert M. Arnold Building Fred Hutchinson Cancer Research Center
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
South Halls: Ewing-Cross Renovation AE Senior Thesis: Tech. 1 Quaid Spearing CM Option September 16, 2013.
INTRODUCTION TO CONSTRUCTION TYPES Code Consultant:Steven R. Winkel, FAIA, PE The Preview Group, Inc. Contractor: Scott Smith.
CEE 578 Senior Capstone Design Types of Construction Drawings
Estimating and Scheduling CEE 492
ET 493: Senior Design Design of a New Hammond Head Start Center By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras Advisor: Mr. R. Edward.
Green Labs Symposium | March 15, 2016 Travis Wanat, Senior project manager Department of Facilities Efficient building design and operation Fueling high.
Alpine County Government Center Board of Supervisors Presentation October 2, 2012.
OTE Building PMG Report October 25, 2012 Rhonda Merchut 1.
Upon completion of this module, you will be able to:
Fun Facts: James M. Bennett High School
Pearl Condominiums Philadelphia, PA
How Completed Interiors Are Achieved: Designing & Building
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
(Refer to Chapter 2 of the textbook)
Multistory Office Building
Multistory Office Building
ET 494: Senior Design Design of a New Hammond Head Start Center
Final Thesis – Nathan Braskey Construction Option Craig Dubler
Prince Frederic Hall Tech One Lauren Kandt PSU AE Construction Sowers
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Minuteman Vocational Technical Regional High School Progress
The Bond Street Wharf Baltimore, Maryland
Building Construction I Sofia Sebastian 1
INDUSTRIAL / COMMERCIAL Facility For Lease
Minuteman Vocational Technical Regional High School Progress
Lehigh Valley Heritage Center
Value of contract: Length of contract: Contract start date:
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]

PROJECT SCHEDULE SUMMARY

BUILDING SYSTEMS SUMMARY  Precast Concrete  Above grade columns  Mechanical System  Variable Air Volume  Cooling Towers  Fan Coil Units  Fire Suppression  Pressurized Stairways  Sprinklers  Fire Dampers  Two hour rating  Demolition Required  Plumber’s Building  Slurry Wall  East street and utilities  Structural Steel Frame  Encased steel columns below grade  Steel composite deck  Cast-In-Place Concrete  Slurry Wall  Underground Slabs  Column Encasement [Cooper Carry, Inc.]

BUILDING SYSTEMS SUMMARY (CONT.)  Electrical System  PEPCO  460/265 Volt Switchboards  208/120 Volt Panelboards  3 Primary Electrical Rooms per floor  Masonry  New Structure  Load Bearing  Single-wythe veneer  LEED – Recycled content  Renovation  Load Bearing  Masonry Restoration and Cleaning  Curtain Wall  2,400 Wall Units  29,000 Punched Window Units  Steel Sunshades  Roof System  Glass Skylight  Roof Terrace  Excavation  Top-Down Excavation  Slab-On-Grade Pours [Cooper Carry, Inc.]

PROJECT COST EVALUATION Square Foot Analysis  $172,000,000 – $229 / SF  Elevator  Laundry Equipment  Emergency Lighting / Smoke Detectors  Reasons  Top-Down Construction  Slurry Wall / Concourse Excavation  Extensive below-grade excavation  Substantially more suites Actual Costs  Prime: $500,000,000 – $665 / SF  Building Systems Cost  Superstructure: $66 million  Exterior Enclosure: $48.5 million  Plumbing: $95.5 million  HVAC: $51.5 million  Fire Protection: $24.5 million  Electrical: $46.5 million

EXISTING CONDITIONS SITE PLANS Proposed Building Existing Building Construction Fence Traffic Flow Fire Hydrant Electrical Water Stormwater Sanitary Gas Telecom Nathan Braskey Existing Conditions Site Utility Plan C Height – 150 ft Height – 60 ft H: 110 ft

CLIENT INFORMATION  Owner: Hotel Developer  Hotel Manager: Hotel Franchise  New Facility – Expansion of Franchise  Design – Build / Guaranteed Maximum Price  Budget, Quality, Schedule  Importance of opening on-time

PROJECT TEAM

QUESTIONS?  Schedule Schedule  Systems Summary Systems Summary  Cost Evaluation Cost Evaluation  Existing Conditions Fly Around Existing Conditions Fly Around  Existing Conditions Site Plan Existing Conditions Site Plan  Client Information Client Information  Project Team Project Team

EXISTING CONDITIONS SITE PLANS Proposed Building Existing Building Construction Fence Traffic Flow Fire Hydrant Electrical Water Stormwater Sanitary Gas Telecom Height – 150 ft Height – 60 ft H: 110 ft Nathan Braskey Existing Conditions Site Utility Plan C - 300