1 A.Baldini 23 sett CSN I Lecce Stato dellesperimento MEG Stato dellesperimento (LXe, T.C., Trigger a parte) Schedule Budget MoU Richieste finanziarie.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Günther Rosner EUROHORC/NuPECC, Paris, 29/11/04 1 Hadron Structure & Spectroscopy Experimental frontiers: High precision High intensity Theoretical symbiosis:
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
CALENDAR.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
CMS ECAL Annual Review - CERN Sept 2001 R M Brown - RAL 1 Test results from 500 preproduction VPTs R M Brown RAL - UK CERN 19 September 2001.
Richmond House, Liverpool (1) 26 th January 2004.
ABC Technology Project
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
VOORBLAD.
Squares and Square Root WALK. Solve each problem REVIEW:
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Addition 1’s to 20.
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
PSSA Preparation.
May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of.
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
MEG 1  e  search at PSI: SUGRA indications SUSY SU(5) predictions BR (  e  )   SUSY SO(10) predictions BR SO(10)  100 BR SU(5) R.
Status of the MEG Experiment W. Ootani ICEPP, University of Tokyo for the MEG collaboration.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
LEPTON-FLAVOUR VIOLATION AND NEUTRINO OSCILLATIONS
P.-R. KettleMEG-Review February MEG Beam Line Studies  E5 Z-Branch NOW !!! NOW !!!
P.-R. KettleMEG Review July MEG Beam Line Studies.
A. Baldini PSI July 04 General Introduction Work done in the past 4 months presented in the individual sub-detectors talks: highlights Construction is.
INFN of Genova, Pavia and Roma Flavio Gatti, PSI, February 9 th, Timing Counter status Timing Counter status.
Shuei YAMADA, ICEPP, University of tau04 Nara, Sep. 15, Search for the Lepton Flavor Violating Decay  e  in the MEG Experiment Shuei YAMADA.
Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Timing Counter july 2004.
MEG 1  e  search at PSI: SUGRA indications SUSY SU(5) predictions BR (  e  )   SUSY SO(10) predictions BR SO(10)  100 BR SU(5) R.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
MEG positron spectrometer Oleg Kiselev, PSI on behalf of MEG collaboration.
26 Jan, MEG Software Status Framework for MEG MC, Unification of LargePrototype/beam test, Schedule and DC reconstruction MEG Software Group.
M. Grassi – INFN Pisa La Thuile - March 15 th, A sensitive search fordecay: the MEG experiment Marco Grassi INFN, Pisa on behalf of the MEG Collaboration.
MEG DC (report June 04) DC report june_04,J.E. a)Foil stability and quench related problems b)How to get more stability c)Frame design d)Measurement of.
Status of the MEG Experiment  → e  On behalf of the MEG collaboration Stefan Ritt Paul Scherrer Institute, Switzerland.
PSI July 2002MuEGamma Review Meeting1 Beam Line Status update 1.  E5 Test Beam Overview : Aims + RequirementsAims + Requirements Zone Layout + Measurement.
Dec. 8th, 2000NOON A new   e  experiment at PSI For the MUEGAMMA collaboration Stefan Ritt (Paul Scherrer Institute, Switzerland) Introduction.
The MEG Experiment T. Mori for the MEG Collaboration.
Current status of MEG Experiment Yasuko HISAMATSU ICEPP, The Univ. of Tokyo ICEPP Symposium.
Overview of the experiment Collaboration (about 30 physicists at this meeting) Budget Realistic schedule and general status (few words) of each sub-detector.
Liquid Xe detector for m +  e + g search Kenji Ozone ( ICEPP, Univ. of Tokyo, Japan ) Introduction prototype R&D ー PMTs ー small & large type summary Outline.
Xenon Delivery Japan 1 MCHF 575 kCHF granted Additional grant 656 kCHF Last 50l subject to negotiation.
P.-R. KettleMEG-Review July MEG Beam Line Studies  E5 Z-Branch Collaborative Effort !!! Effort !!!  E5 Z-Branch Collaborative Effort !!! Effort.
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
9 Feb, MEG Software Status -for the coming review committee- Question from A.Blondel Our answer Schedule and Man power MEG Software Group.
g beam test of the Liquid Xe calorimeter for the MEG experiment
MEG  e  search at PSI: SUGRA indications SUSY SU(5) predictions BR (  e  )   SUSY SO(10) predictions BR SO(10)  100 BR SU(5) R.
The MEG Experiment at PSI: a sensitive search for m eg decay
Liquid Xenon Detector for the MEG Experiment
New experiment to search for mge g at PSI status and prospects
Stato del calorimetro elettromagnetico
Timing Counter Sept CSN I, Assisi 2004 Giorgio Cecchet.
Status of the experiment in Italy
Liquid Xenon Scintillation Detector for the MEG Experiment
The MEG Detector to Search for m -> eg Decays
MEG Summary T. Mori for MEG Collaboration February 9, 2005.
Presentation transcript:

1 A.Baldini 23 sett CSN I Lecce Stato dellesperimento MEG Stato dellesperimento (LXe, T.C., Trigger a parte) Schedule Budget MoU Richieste finanziarie

2 A.Baldini 23 sett CSN I Lecce Detector overview Liquid Xe e.m. calorimeter Magnetic spectrometer Timing counter FWHM resolutions espulsione dei positroni

3 A.Baldini 23 sett CSN I Lecce INFN & Pisa University A. Baldini, C. Bemporad, F.Cei, M.Grassi, F. Morsani, D. Nicolo, R. Pazzi, F. Raffaelli, F. Sergiampietri, G. Signorelli ICEPP, University of Tokyo T. Mashimo, S. Mihara, T. Mitsuhashi, T. Mori, H. Nishiguchi, W. Ootani, K. Ozone, T. Saeki, R. Sawada, S. Yamashita KEK, Tsukuba T. Haruyama, A. Maki, Y. Makida, A. Yamamoto, K. Yoshimura Osaka University Y. Kuno Waseda University T. Doke, J. Kikuchi, H. Okada, S. Suzuki, K. Terasawa, M. Yamashita, T. Yoshimura Budker Institute, Novosibirsk L.M. Barkov, A.A. Grebenuk, D.G. Grigoriev, B, Khazin, N.M. Ryskulov PSI, Villigen J. Egger, P. Kettle, H. Molte, S. Ritt La collaborazione INFN & Pavia University A.de Bari, P. Cattaneo, G. Cecchet, G. Nardo, M. Rossella INFN & Genova University S. Dussoni, F. Gatti, P. Ottonello, D. Pergolesi, R. Valle INFN Roma I D. Zanello INFN & Lecce University S. Spagnolo, C. Chiri, P. Creti, G. Palama, M. Panareo

4 A.Baldini 23 sett CSN I Lecce Magnet: Construction finished! Construction was finished! Construction was finished! Excitation test has started on June. Excitation test has started on June. Compensation coils Superconducting coil in cryostat Potentiometer Support frame

5 A.Baldini 23 sett CSN I Lecce Jan 2002: Jan 2003: Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Field Measurement Platform COBRA Magnet schedule

6 A.Baldini 23 sett CSN I Lecce Platform design status (June 24 th ) beam

7 A.Baldini 23 sett CSN I Lecce Area Layout optional wall small rail electronics LXe storage compressor LN 2 line Trigger & DAQ HV

8 A.Baldini 23 sett CSN I Lecce Measurements: Phase B – post Triplet 2 & Collimator Phase B – post Triplet 2 & Collimator Phase C – post Solenoid Phase C – post Solenoid Several unexpected problems encountered & Solved !!! Measurements: Phase B – post Triplet 2 & Collimator Phase B – post Triplet 2 & Collimator Phase C – post Solenoid Phase C – post Solenoid Several unexpected problems encountered & Solved !!! Z-Branch Measurements April/May2003

9 A.Baldini 23 sett CSN I Lecce Phase C Post Solenoid Remember !!! PSC only a Test Solenoid PSC-Solenoid 20cm Bore Beam Line 32 cm Bore Remember !!! PSC only a Test Solenoid PSC-Solenoid 20cm Bore Beam Line 32 cm Bore Triplet 2 1 Solenoid WIEN Filter Colli. Trip. µ+µ+µ+µ+ e+e+e+e+ e+e+e+e+ µ+µ+µ+µ+ Integrated Rate After Solenoid 4cm 1800µA N µ ~6.1·10 7 µ + /s (1.1·10 8 µ+/s 6cm Tg.) Beam Spot: σ X ~ 5.3 mm σ Y ~ 6.5 mm Transmission Factor Solenoid T Sol = 71 % Integrated Rate After Solenoid 4cm 1800µA N µ ~6.1·10 7 µ + /s (1.1·10 8 µ+/s 6cm Tg.) Beam Spot: σ X ~ 5.3 mm σ Y ~ 6.5 mm Transmission Factor Solenoid T Sol = 71 % Single Node SNM Double Node DNM Previous Excitation Curve DNM confirmed DNM focus Z A DNM focus Z A Previous U-Branch A A With larger Bore i.e. BTS T>71%

10 A.Baldini 23 sett CSN I Lecce Degrader & Stopping Distribution Measurements µ+µ+µ+µ+ CH 2 Tg e+e+e+e+ Foils CH 2 at focus Michel Range Curve using NaI: Measurement Simulation Fix Degrader 600 µ Geant say 580µ Nearly all Stopped in 400µ R ~ 870 µ CH 2 Degrader Target AIR Target Thickness vs. NaI Rate VAC Target Gives R Mean = 1150µ Equiv GEANT + TRIM 88% STOP in 400µ Tg !!! Solenoid Fix Degrader Var. Tg 88% stopped in 400µ CH 2 Tg.

11 A.Baldini 23 sett CSN I Lecce Jan Jan 2003: Test Milestone AssemblyDesignManufactoring Studies Solenoid Quadrupoles Target Beam

12 A.Baldini 23 sett CSN I Lecce Drift chambers Prototypes of cathodes supporting structure Print foils meeting the experimental requirements found Tests at M1: drift time measurements and cathodes read- out First studies on pattern recognition (Pisa + Lecce)

13 A.Baldini 23 sett CSN I Lecce Example of reconstructed tracks

14 A.Baldini 23 sett CSN I Lecce # of correctly reconstructed tracks # of correctly reconstructed tracks Efficiency = Efficiency = # of generated tracks # of generated tracks Michel positrons in the solid angle covered by the spectrometer or isotropically over the whole detector; no significant differences; positron momentum > 30 MeV; Algorithm performances

15 A.Baldini 23 sett CSN I Lecce Test Milestone AssemblyDesignManufactoring Full Prototype Medium PrototypeCharge division & Cosmics FP Full Detector (18 DC) Jan 2002: Positron Tracker

16 A.Baldini 23 sett CSN I Lecce Test Milestone AssemblyDesignManufactoring Design PMT EvaluationPMT Jan 2002: Timing Counter Tests of fine mesh PMTs (even in magnetic fields) and of counter prototypes ( M1) going on Good solution for transverse detector: scintillating fibers + APDs

17 A.Baldini 23 sett CSN I Lecce Photon Detector schedule Test Milestone AssemblyDesignManufactoring Large PrototypeBeam Test Vessel DesignAssembly & Test PMT Delivery + Testing RefrigeratorManufactoringAssembly Liq. Purification AssemblyTest Manufactoring Engineering runs

18 A.Baldini 23 sett CSN I Lecce Electronics Need of at least two prototypes (both for the trigger and the DRS) First trigger prototype is being tested Second DRS design is being designed

19 A.Baldini 23 sett CSN I Lecce Full System Test Milestone AssemblyDesignManufactoring Prototype Board 2 nd Prototype Jan 2002 Trigger

20 A.Baldini 23 sett CSN I Lecce Test Milestone AssemblyDesignManufactoring 2 nd Prototype Tests1 st Prototype Boards & ChipTest Jan 2002 DRS (DAQ)

21 A.Baldini 23 sett CSN I Lecce Test Milestone AssemblyDesignManufactoring Platform Detector Integration Engineering Runs Jan 2002: Complete Detector Start of the experiment in 2006 All possible engineering runs in 2005

22 A.Baldini 23 sett CSN I Lecce Budget (K) Approved in april Approved in may Deficit per 350 PMT MoU

23 A.Baldini 23 sett CSN I Lecce LXenon PMT(300) 550 K Criostato 400 K Trigger Secondo prototipo 20 K Sistema completo 430 K Timing counter APD + fibre (interno)160 K PMT (100: esterno)315 K Scintillatore 50 K Calibrazione100 K Meccanica 50 K 675 K Splitters Sistema completo 115 K TOTALE 2190 K 1095 K 545 K 550 K Stime di costo aggiornate

24 A.Baldini 23 sett CSN I Lecce Preventivo globale

25 A.Baldini 23 sett CSN I Lecce Preventivo Tot Settembre 2003 PMT LXe 550 K APD 80 K Scint T.C. 50 K 680 K Prima meta 2004 PMT T.C. 315 K fibre 80 K Criostato 400 K Splitters 1 50 K 845 K Seconda meta 2004 Trigger K Calibr. T.C. 100 K Mecc. T.C. 65 K 380 K 2005 Trigger K Splitters 1 50 K 265 K Proposta...

26 A.Baldini 23 sett CSN I Lecce Milestones 2004