Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

WAREHOUSING MANAGEMENT
Process Selection and Facility Layout
CHAPTER FIFTEEN JUST-IN-TIME SYSTEMS Chapter 15 Just-In-Time Systems.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
Just-In-Time and Lean Systems
Organization of Workstations
Just-in-Time and Lean Systems
Location Strategy and Layout Strategy
Operations Management Just-in-Time Systems Supplement 12
Peta Luas Produk dan Luas Lantai Produksi. Multi-Column Process Chart Similar content Visually cleaner Compares processes side-by-side.
Material Handling Conventional. Operations Process (Flow) Chart Flow diagram is a plan of work area, indicating the position of machines, flow of materials.
CSUN - Prof. David Shternberg
Beni Asllani University of Tennessee at Chattanooga
MSE507 Lean Manufacturing
Just-In-Time “Eliminate Waste”.
Facility Layout Facility Layout Facility Layout decisions translate the broader decisions about a firm’s strategy such as competitive priorities, process,
1 Facility Layout. 2 What Is Layout Planning Layout planning is determining the best physical arrangement of resources within a facility Two broad categories.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. OPIM 310 –Lecture #8 Just-In-Time.
Operations Management
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Layout Strategy. Introduction What – Layout Decisions Where – For efficiency or customer appeal Why – Improve Profitability.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
JUST IN TIME. Just in Time Getting the right quantity of goods at the right place at the right time.
Session Pooja patnaik.
Operations Management Layout Strategy
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
Assembly Line Balance Balance.
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
Chapter 10 – Facility Layout
Layout Strategy.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
DOM 102 : Principles of Operations management
JIT and Lean Operations
Chapter 10 – Facility Layout
Chapter 9 : Layout Strategies
Chapter 4 Process Design.
Facility Layout Chapter 10 pages , ,
COPYRIGHT © 2008 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under license.
Flow Planner Presentation Selected Case Studies. Internet / Intranet based Process Engineering Flow Planner Features Analyze an unlimited number of flow.
Lean Production.
1 Office Space Requirements 2 Universal Axioms Manufacturing managers in large companies tend to overestimate their individual cell or departmental space.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
8.0 LEAN Chuah Shu Chin B Jennise Tan Teng Teng B Yeow See Leong B
Manufacturing/Office Cells
Operations Management JIT & Lean Systems
Facility Layout Part b.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
Part 3.
Definition: The physical positioning of processes, departments, equipment and work areas to optimize an organization’s effectiveness in achieving its operating.
Facility Layout Chapter 10 pages , ,
Lean operations and JIT
IENG 451 / 452 Just In Time Processes: Cells, Stores, Kanban, Demand
Process Layout Chapter #6.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
UNIT-III Operations Management PREPARED BY CH. AVINASH.
Inputs and Outputs to Aggregate Production Planning
Cellular Layouts Cellular Production Group Technology
What is Facility Layout?  The layout facility is the physical location of the various departments/units of the facility within the premises of the facility.
Just-In-Time and Lean Production
Just-In-Time and Lean Production
Process Selection and Facility Layout Lecture 5. Forecasting Product and Service Design Technological Change Capacity Planning Process Selection Facilities.
“Cellular Manufacturing”
Presentation transcript:

Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis2 Flow Flow is the continuous movement of material through the manufacturing processes and on to the customer. Wholesalers Retailers Primary components Supplier 2 Customers Information flow Material flow M M MM Manufacturers Supplier 1 Supplier n

Ch-5 Flow Analysis3 Flow If an operation with perfect flow could be established, it will nearly eliminate all waste associated with: (1) Inventory, (2) Storage space, (3) Transportation, (4) Waiting.

Ch-5 Flow Analysis4 The Impact of Flow Exceptional flow leads to: (1) Lower inventories (2) Better quality (3) Less floor space (4) Better communication (5) Quicker responses to problems (6) Faster throughput

Ch-5 Flow Analysis5 Two Basic Types of Flow Process orientation layout

Ch-5 Flow Analysis6 Two Basic Types of Flow Product orientation layout

Ch-5 Flow Analysis7 Process-oriented layout and product-oriented layout 1.Material flow will be much smoother. 2.The distance material has to travel will be much shorter. 3.There is less confusion about which process sequence to use, or when and where finished material should be transferred into next station. 4.One concern with the product-oriented layout is the restriction of the machine capacity. Instead of using one fast, flexible, expensive machine that can produce many different parts, cheaper machines that can be used solely for one part are acquired. In product-oriented layout:

Ch-5 Flow Analysis8 Versatile Versus Dedicated Equipment

Ch-5 Flow Analysis9 Flow The following lean practices merit strong consideration: (1) Pull system (2) One-piece flow (3) Cellular operation (4) Product orientation layout (5) Balanced operations

Ch-5 Flow Analysis10 Cellular operation Operations must be tied together in work cell. U cell: the best use of floor space

Ch-5 Flow Analysis11 Flow Analysis Techniques Flow analysis determines the path that every part takes through the plant, which minimizes (1) distance traveled (measured in feet), (2) backtracking, (3) cross traffic, (4) cost of production.

Ch-5 Flow Analysis12 Flow Analysis Techniques Flow analysis will assist the manufacturing facilities designer in the selection of the most effective arrangement of machines, facilities, workstations, and departments. If you improve the product flow, you will automatically increase profitability. A core principle of lean manufacturing is the product- oriented flow layout.

Ch-5 Flow Analysis13 Flow routing To establish the best arrangement of equipment, following four techniques are used: 1. A string diagram 2. A multi-column process chart 3. A from-to chart 4. A process chart

Ch-5 Flow Analysis14 Flow routing Example 1: 5 part-8 workstation layout. 5 parts: 1, 2, 3, 4, 5; 8 workstations: R, A, B, C, D, E, F, S. R: receiving station S: shipping end

Ch-5 Flow Analysis15 String diagram Efficiency = 35/67 = 52% Where is the number 35 from? Upper lines: jumping; Lower lines: backtracking.

Ch-5 Flow Analysis16 String diagram Efficiency = 35/67 = 52% Where is the number 35 from? C-D: four paths B-D: two paths A-C: four paths D-S: three paths …,

Ch-5 Flow Analysis17 Improved string diagram Efficiency = 35/57 = 61% How efficiency can you make this layout?

Ch-5 Flow Analysis18 Multi-column process chart It uses the same routing information as used in string diagram, but in different view.

Ch-5 Flow Analysis19 From-To Chart The from-to chart is the most exact technique of the three. We can develop an efficiency that considers the importance of the parts. Up until now, we have considered each part as equal in importance, but the quantity and weight of each part was recorded and should be considered. (Example 1 continued)

Ch-5 Flow Analysis20 From-To Chart From-To Chart of Part 1 with an equal importance value of 1. The routing of Part 1: RABDCFS

Ch-5 Flow Analysis21 From-To Chart From-To Chart –Alphabetical Layout for all 5 parts considering the importance values.

Ch-5 Flow Analysis22 From-To Chart (Original) From-To Chart –Alphabetical Layout for all 5 parts considering the importance values and penalty points. Upper triangle matrix: P.P. = Importance value X forward step(s) Lower triangle matrix: P.P. = IV X (2 FS)

Ch-5 Flow Analysis23 From-To Chart –Alphabetical Layout for all 5 parts considering the importance values and penalty points. Efficiency = 283/ = 26% From-To Chart (Original) Upper triangle matrix: P.P. = Importance value X forward step(s) Lower triangle matrix: P.P. = IV X (2 FS)

Ch-5 Flow Analysis24 From-To Chart –Alphabetical Layout for all 5 parts considering the importance values and penalty points. From-To Chart (Improved) Upper triangle matrix: P.P. = Importance value X forward step(s) Lower triangle matrix: P.P. = IV X (2 FS)

Ch-5 Flow Analysis25 From-To Chart –Alphabetical Layout for all 5 parts considering the importance values and penalty points. Efficiency = 283/548 = 51.6% From-To Chart (Improved) Upper triangle matrix: P.P. = Importance value X forward step(s) Lower triangle matrix: P.P. = IV X (2 FS)

Ch-5 Flow Analysis26 Flow Diagram The flow diagrams show the path traveled by each part from receiving to stores to fabrication of each part to subassembly to final assembly to packout to warehousing to shipping. These paths are drawn on a layout of the plant. The flow diagram will point out problems with such factors as cross traffic, backtracking, and distance traveled. Cross traffic: Where flow lines cross. Cross traffic is undesirable and a better layout would have less intersection paths. Anywhere traffic crosses is a problem because of congestion and safety considerations.

Ch-5 Flow Analysis27 Flow Diagram One partToolbox

Ch-5 Flow Analysis28

Ch-5 Flow Analysis29

Ch-5 Flow Analysis30

Ch-5 Flow Analysis31 Where Can One-piece Flow Processing Be Applied? A, B, C, D are workstations, and the bar indicates the cycle time. The dash line shows takt time for the processes.

Ch-5 Flow Analysis32 Where Can One-piece Flow Processing Be Applied? 1.The largest cycle time in the line should be less than takt time. 2.The line should be balanced (The cycle times should be even). Figure-13 shows re- balanced cycle times for the line. To balance the line, process D is taken off form the line.

Ch-5 Flow Analysis33 Balancing Concerns Bottlenecks: overloaded work stations (large cycle time stations) that do not have enough capacity for the prescribed load. Bottlenecks dictate throughput. Time saved at a non-bottleneck saves the system nothing. Using a non-bottleneck 100% of the time does not produce 100% utilization. The capacity of the system depends on the capacity of the bottleneck.

Ch-5 Flow Analysis34 Managing Bottlenecks Establish time buffer before each bottleneck. Control the rate of material feeding the bottleneck (gate operation). Do everything to increase capacity of bottleneck. Adjust loads, change schedule. Loads that can be split, should be.

Ch-5 Flow Analysis35 Push or Pull? In a push system, the traditional manufacturing, items from one workstation are “pushed” onto the succeeding workstation indiscriminately, regardless if that plant is ready to process the items or not.  The material movement is scheduled by ‘plan.’  That plan is made some time before and based on forecasting.  This is a production-oriented approach.

Ch-5 Flow Analysis36 Push or Pull? A push system

Ch-5 Flow Analysis37 Push or Pull? The main advantages of push system are: (a) It spreads overhead cost and continuous utilization of people and equipment. (b) It allows for the development of well-integrated production plant. (c) It is most familiar to the employees. (d) It has the flexibility to produce various product types.

Ch-5 Flow Analysis38 Push or Pull? The following problems may occur in push system: (1) High inventories (or WIP) (2) Potential quality problem (3) High floor space (4) Poor communication (5) Slow responses to problems (6) Over production or shortage (7) Queuing or starvation

Ch-5 Flow Analysis39 Push or Pull? In a pull system: production is triggered by the demand at the final stage. At each intermediate stage, it is triggered by its succeeding stage(s)—this process is carried all the way from the final stage to the beginning stage. Thus, the production is controlled (i.e., pulled) by demand of the succeeding stage.  The JIT (Just-in-time) system is easily implemented.  Kanban is usually a tool for ‘pull’ production system.  Lean manufacturing likes pull badly.  It is a customer-oriented approach.

Ch-5 Flow Analysis40 Push or Pull? A pull system

Ch-5 Flow Analysis41 Push or Pull? The main advantages of the pull system are: (a) It is relatively inexpensive as it does not require a comprehensive entourage of employees and information processing equipment to be functional. (b) Inventory is not perpetual. (c) The production model reflects the actual production better. (d) The approach leads itself to a very simple control mechanism, best known as kanban system. The workers working in a kanban controlled production line only need to follow the simple rule: No kanban, no production.

Ch-5 Flow Analysis42 Push or Pull? The disadvantages of the pull system are: (1) People and equipment may not be fully in use at all times. (2) No detailed plans. (3) People are unfamiliar with a pull system. (4) It does not maintain the same level of flexibility as push system.

Ch-5 Flow Analysis43 Push or Pull? Spearman and Zazanis (1992) examined the behavior of push and pull production systems. After comparisons, they included three conjectures: (1) pull systems had less congestion. (2) pull systems were inherently easier to control. (3) the benefits of a pull environment owed more to the fact that WIP was bounded than to the practice of “pulling” everywhere.