Estar Wide Format Shipping Container RIT MSD I PRELIMINARY DESIGN REVIEW RIT MSD Team: Thomas Benner Brandon Kilbury Phillip C. McKee Justin Mintz Jason.

Slides:



Advertisements
Similar presentations
Design Constraints For Engineering Projects
Advertisements

Teaching materials to accompany:
D-R Compressor Cell RIT Senior Design Team P13458 Week 4 Status Report.
EDGE™ MAV Control System - P Management Review (MSD I) Erik Bellandi – Project Manager Ben Wager – Lead Engineer Garrett Argenna – Mechanical Engineering.
ME Project: Air Conditioner Lab Team: 10 Members: Sean M. Gallagher, Brian Davison, Prathana Vannarath, Pam McDowell Customer: University of Delaware Mechanical.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
EDGE™ Project Status Update P09141 – Satellite Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
EDGE™ Project Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME),
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
System Engineering Instructor: Dr. Jerry Gao. System Engineering Jerry Gao, Ph.D. Jan System Engineering Hierarchy - System Modeling - Information.
Chapter 5: Project Scope Management J. S. Chou, P.E., PhD.
Project Scope Management J. S. Chou, P.E., PhD.
MANUFACTURING PROTOTYPE How do all the aspects of manufacturing come together to make a final product?
Thomas Benner Brandon Kilbury Phillip C. McKee Justin Mintz Jason Ryan RIT MSD II FINAL REVIEW ESTAR WIDE FORMAT SHIPPING CONTAINER.
Bicycle Harvesting Waste Energy: Bicycle Power Generation MSD-I RIT-Systems Design Review Winter/Spring P12414 January 13, 2012 Group # P12414.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Guide Workshop Tuesday, August 19, Agenda I.MSD Fall 14 Logistics Werth –45 minutes 1.Class Schedule high level 2.Grading Period Highlights 3.MSD.
INTEGRATING EHS INTO NEW PRODUCT DEVELOPMENT
P09713 – Bread and Roll Scaling Room Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Kate Gleason.
MSF Requirements Envisioning Phase Planning Phase.
From Research Prototype to Production
Industrial Engineering Roles In Industry
Task: Copyright © 2003 PM tec, Inc; D. Sankey; D. Padelford. All rights reserved. 1 Fast Start For Projects  Electric Dipole Moment Project Facilitator:
Systems Level Design Review P15010: Arc Wheelchair Swing Maggie Bates, Sean Kennelly, Owen Breese, Elizabeth Cutolo.
P13458 RIT Senior Design Team May 10, :30AM Dresser- Rand, Painted Post Final Presentation:
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Product Design for Manufacturability and Automation
Software Engineering Management Lecture 1 The Software Process.
D-R Compressor Cell RIT Senior Design Team P13458 Systems Design Review.
P13458 RIT Senior Design Team March 22, AM-11AM Dresser- Rand, Painted Post Air Bearing System & Layout.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Wegmans Bread Tray Lift Assist By Brendan Moran,Greg Feather Alex Phillips and Andrew Beasten.
Xtreme Robot Olympiad The Design Process Dr. Peter Laz Associate Professor Department of Engineering University of Denver.
Chapter 3 Dr. Bahaa Al-Sheikh & Eng. Mohammed Al-Sumady Intoduction to Engineering Introduction to Engineering Design 1.
Ch 4 - Learning Objectives Scope Management You should be able to: n Discuss the relationship between scope and project failure n Describe how strategic.
Project Active Vibration Cancellation. The Team NameDisciplineRole Kaitlin PeranskiIndustrial and SystemsProject Leader/ Edge Updating Jeremy BerkeElectricalScribe.
PROJECT STATUS UPDATE P10661-AERIAL IMAGING Dale Turley (Mechanical Engineering)
EPT 221 CONFIGURATION DESIGN. Objective of This Lecture Describe the configuration design phase Describe ways to generate product and parts configurations.
Sacramento Area Council of Governments ITS Partnership Meeting February 2, 2005.
P13458: Dresser-Rand Compressor Assembly Line Team Members: Lauren Kraft –Project Manager, Nick Feng – IE Cole Bowden – ME, Shawn Moseley – ME Jordon Boggs.
Junior Design Project Jesse Boudart.  Purpose American Society of Mechanical Engineers (ASME) Design Competition  Clean most amount of dirt (Dots) 
Dog Grooming tool Team 17 Justin Proctor, Roy Mason, Jordan Chupp, Dennis Pugh Sponsor: Engineering To Go.
Project Scope Management 1. 2 Learning Objectives Understand the elements that make good project scope management important. Explain the scope planning.
Nanofluidic Characterization David Sharp David West Justin Davis.
Ing. Šimon Kovář, Ph.D. Ing. Jan Valtera, Ph.D. Ing. Petr Žabka, Ph.D. Ing. Josef Skřivánek Term project.
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
7 November 2006Program Management Basics Purdue FIRST Programs Slide 1 Program Management Basics Purdue FIRST Programs Chris Fultz Rolls-Royce Corporation.
University of Southern California Center for Systems and Software Engineering RDCR ARB CS 577b Software Engineering II Supannika Koolmanojwong.
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
Manufacturing Management Prayash Neupane. Manufacturing Management MM refers to all aspects of the product manufacturing process. From assembly design.
Supportability Design Considerations
The Four-legged Water Walker
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
Equilibrate System upgrade
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
P08351: Automated Oiling System
Multidisciplinary Capstone Design:
Systems Level Design Review P15010: Arc Wheelchair Swing
Lesson 1- Operations Management
SENIOR DESIGN PROJECT P08455
PRODUCT SPECIFICATIONS chapter FOUR
Multidisciplinary Capstone Design:
Systems Level Design Review P15010: Arc Wheelchair Swing
Design Constraints For Engineering Projects
P18325: Automated Breast Pump Cleaning System (Team ABC’s)
Detailed Design Review: P18001
ESI 4554 ISE Systems Design Fall 2003
Presentation transcript:

Estar Wide Format Shipping Container RIT MSD I PRELIMINARY DESIGN REVIEW RIT MSD Team: Thomas Benner Brandon Kilbury Phillip C. McKee Justin Mintz Jason Ryan

 Project Summary  Key Requirements  Engineering Specifications  Functional Decomposition  Workflow and container concept development  Workflow and container concept selection  System Architecture  Present container concepts  Detailed design schedule & team concerns PRESENTATION OUTLINE

 Primary Task: Standardize pack to ship process for “new business” Estar products via: -Proprietary shipping container -Waste reduction in current pack to ship workflows  Secondary Tasks: -Provide ergonomic optimization -Quantify savings and future performance PROJECT SUMMARY

 Container must be compatible with current core and varying roll diameters and widths.  Unit cost ≤ $120  Container must last for at least 5 uses.  Must protect roll structurally (vibration and impact) as well as from contaminates (dirt and oil).  Throughput at windup ≤ 5 minutes  Total pack to throughput ≤ 10 minutes KEY REQUIREMENTS

 Must conform to all international shipping standards.  Container must meet or surpass current shipping capacity  dimensions and stackable.  Enable 4 way access for fork truck.  Container must be quick and easy to assemble/disassemble  safe and ergonomic. KEY REQUIREMENTS

ENGINEERING SPECIFICATIONS DescriptionRequired ValuesUnits Possible Additional Considerations Core Outer Diameter7Inches9" for Dryview Core Length58Inches Roll Diameter InchesOne roll has 32" dia Roll Width Inches Roll Weight PoundsRoll weighs 2600 lb. Overall Container Width29.5Inches Overall Container Length64Inches

ENGINEERING SPECIFICATIONS DescriptionRequired ValuesUnits Possible Additional Considerations Overall Container Height35Inches Container Re-Useability> 5Uses Container Impact Resistance10G Container Stack Height1 - 2Containers Container Cost120Dollars Container Component Lead Time < 4Weeks Packing Time in Windup Area<5Minutes Total Packaging Time< 10Minutes # of Operators Needed to Package 2Operators

FUNCTIONAL DECOMPOSITION

The Pack to Ship process must be considered before addressing the physical deliverable, much like design for manufacturing. This enables the MSD team to:  Ensure adequate waste reduction in current processes  Optimize the current manufacturing area layout & resources  Maximize the likelihood of the container and its assembly integrating well with existing resources in bldg. 317 and 318  Meeting throughput requirements CONCEPT DEVELOPMENT PROCESS

WORKFLOW CONCEPT DEVELOPMENT Pack to Ship workflow conceptualizationScore and rank workflows Select optimal workflows to pursueRevise workflows per market constraints

CONTAINER CONCEPT DEVELOPMENT Subassembly conceptualizationScore and rank complete concepts Select container concepts to begin design

SUBASSEMBLY DEVELOPMENT PROCESS Revise optimal workflow Revise concept to facilitate workflow Check feasibility of concept

PACK TO SHIP WORKFLOW CONCEPTUALIZATION

WORKFLOW SCORING VIA PUGH MATRIX

REFINED WORKFLOW SCORING

WEIGHTED RANKING & SELECTION

REVISED WORKFLOWS PER MARKET

CONCEPT FUNCTIONS & COMPONENTS

CONTAINER CONCEPT SELECTION

CONTAINER CONCEPT SCORING

SYSTEM ARCHITECTURE

CONCEPT ‘D’

CONCEPT ‘D’ - BASE

CONCEPT ‘D’ - SADDLES

CONCEPT ‘D’ - ROLL

CONCEPT ‘D’ - END BOARDS

CONCEPT ‘D’ - END BOARD SUPPORTS

CONCEPT ‘D’ - LID

CONCEPT ‘D’ – DOUBLE STACK

CONCEPT ‘D’ – OPTIMAL CONCEPT

CONCEPT “C-G” VARIANT

Task NameDurationStartFinish Choose concept for detailed design 1 dayFri 1/18/13 Finalize concept assembly5 daysMon 1/21/13Fri 1/25/13 Determine hardware and materials 5 daysMon 1/28/13Fri 2/1/13 Engineering Analysis5 daysMon 1/28/13Fri 2/1/13 Finalize detailed concepts5 daysMon 2/4/13Fri 2/8/13 Draft test plan5 daysMon 2/4/13Fri 2/8/13 Prepare for prototyping5 daysMon 2/11/13Fri 2/15/13 Detailed design review1 dayFri 2/15/13 DETAILED DESIGN SCHEDULE

 Straps?  Total prototype and testing budget?  Wood shop lead time and cost?  Packaging lab rules (scheduling, cost)  Customer approval issues, wrapping procedures, etc. who has final approval power?  Need to video current process  Throughput data at windup and for packaging, approximate annual overtime in 318 (hours, # rolls, and cost)  Safety and ergonomic concerns? Areas to focus on? TEAM CONCERNS