CERN Betty Magnin / Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Betty Magnin / Erik van der Bij CERN Electronics Design Office.

Slides:



Advertisements
Similar presentations
Due Diligence of Technology Mission Critical: The Rocky Research scientist, engineers & mfg specialist are dedicated to assist potential investors in.
Advertisements

TE-MPE-EM Costing Betty Magnin 29/11/ Costing History Operational budgets Invoicing Cost balancing over fiscal year 2 29/11/2012.
Introduction to IE 399 Minimum of 20 consecutive business days except for official holidays Some companies require longer durations Manufacturing or Service.
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
EUG 20/06/2012 News from Electronic Modules design, manufacturing and assembly Betty Magnin TE-MPE-EM 1.
Applied Technology High School ATE 1012 Grade 10 Eng. Rose Hasan.
We make hot joints.. 2 Who we are. Originally part of a leading international handheld repair and rapid prototyping company, Repair point was formed *
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) - Review.
Bringing your technology to life…
Bringing your technology to life…
U.S. customer service and design support with Asia manufacturing. U.S. customer service and design support with Asia manufacturing. The Tecate Advantage:
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
CLIC activity of Jukka Väinölä Feb 20121J. Väinölä, BE-RF-PM.
From Research Prototype to Production
WAP Quality Management Plan NASCSP 2013 Annual Training Conference Phoenix, Arizona September 11, 2013 Barb Klug-Sieja – Bureau Director Hoyt O’Brien –
1. QualityControl QualityManagement Before even today Standard: CSA Z Examples Petrobrás Dow Química Beginning: October 1992 ISO 9001 BVQI.
SAP ERP Manufacturing Solutions. Manufacturing Scope items.
Introduction of Quality Procedures in the Electronics Design Office
CERN Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Erik van der Bij CERN Electronics development support: how it is organized.
CREOCAD
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN CERN hybrid production experience (or how to stay out of trouble)
Customer Story Leggett & Platt’s Enterprise Procurement System.
1 FTK Rear Transition Module Mircea Bogdan The University of Chicago March 9, 2015 Production Readiness Review.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
Module Development Plan I believe that we are ready to proceed to a program to demonstrate a PS module based on “2.5 D” interconnections. This is based.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
TE-MPE-EM Budget Structure Betty Magnin 29/11/
EUG 01/02/2011 News from Electronic Modules design, manufacturing and assembly Betty Magnin TE-MPE-EM 1.
Tunnel Gallery Girders x ADC’s HV Power supply Rack channels digitizer VME module (SIS3300), 12 bits 96.
CERN CERN EP-DI-DDL-VV 1 D E M A C - meeting 30 August 2001 This presentation will probably involve audience discussion, which will create action items.
Micromegas NSW issues Tasks list. Scope  Preparation of New Small Wheel project  Set up task sharing => proto-Collaboration (MoU)  Project leader &
Bully Blue Lock Midterm Presentation 2014 Senior Design II.
CERN EST -DEM CERN Erik van der Bij EP ELECTRONICS ADVISORY BOARD 4th Meeting 7 November 2002 Erik van der Bij CERN EST-DEM Group leader.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
CERN Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Erik van der Bij CERN The role of DEM at CERN.
Software Testing and Software Quality Assurance Process.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
TE-MPE Annual Meeting Activity report of EM section 11/12/2015 Betty Magnin.
ELECTRONIC DOCUMENT SHARING AND MANAGEMENT BY: EDWARD DISI JUSTIN HEIN BROM ESPY Senior Design 1.
SJDAdvisory Committee May Production & Maintenance Steven J. Durand May 2006.
Technical students, Industry contacts and Technology Transfer April 16 th 2009 Ole Petter Nordahl Norwegian Industry Liaison Officer and Technology Transfer.
L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
TE-MPE-EM: Subcontracting Raphaël Berberat
TE-MPE-EM Assembly workshop Betty Magnin 29/11/
TE-MPE-EM Design Office William Billereau 29/11/
Technical Solutions Pvt. Ltd. Committed to Excellence.
PCB Assembly. INTRODUCTION  PCB abbreviation is a printed circuit board,also known as a printed wiring board.  For electronics PCB is used to build.
Technical Solutions Pvt. Ltd. Committed to Excellence.
CLIC Activities of M. Filippova Feb 20121M. Filippova, BE-RF-PM EDMS Quality assurance Component procurement.
Minimal Industrial Needs for a Minimal Mars Colony. A Home O'Centric Insight. By Andrew Tubbiolo.
EN-ICE-DEM Some figures for job requests throughout the whole section, including 280 designs (new or modifications) 700 in-house MPGD and PCB.
MPE-EM Workshop The assembly workshop S. KaufmannJune 16, 2016.
Performance Appraisal and Management at CERN
Performance Appraisal and Management at CERN
Subcontracting of electronics modules
Welcome ! Capstone Design Lab is a new 4 credit course specifically aimed to give you industry design exposure in a design team atmosphere The course.
Welcome ! Capstone Design Lab is a newer 4 credit course specifically aimed to give you industry design exposure in a design team atmosphere The course.
Subcontracting and company selection
MPE-EM Workshop Purchasing strategy for electronic modules
Emanuele Piemonti Spalazzi & Gaetan Richaud
Performance Appraisal and Management at CERN
MPE-EM Workshop Design Office William Billereau
Performance Appraisal and Management at CERN
Emanuele Piemonti Spalazzi & Gaetan Richaud
LIU Wire Scanner Series Costs
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Graduate Development Program Engineering
Electronics Contract Manufacturing Service Topscom provide an extensive turnkey electronics manufacturing service range of fabrication, engineering and.
Computer-Aided Design (CAD)
Presentation transcript:

CERN Betty Magnin / Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Betty Magnin / Erik van der Bij CERN Electronics Design Office

CERN Betty Magnin / Erik van der BijTS-DEM Contents Mission and means Tools Cost aspects Future Evolution

CERN Betty Magnin / Erik van der BijTS-DEM Mission From schematics to mounted PCBs 1 to 200 pieces / project Project cost: CHF to CHF 20’000.- Around 800 projects / year –(500 new designs, 150 modifications, 150 production only)

CERN Betty Magnin / Erik van der BijTS-DEM Turn-around time Prototype electronics production multi-layer PCB, standard priority Tight planning and follow-up needed Need companies that you can rely on Queue 2-3 weeks Layout 1-2 weeks Layout (and queue) 4 weeks PCB fabrication 3 weeks Assembly 2 weeks Margin 1 week

CERN Betty Magnin / Erik van der BijTS-DEM Tasks Plan the project Advice on finding manufacturable solutions Create components in librairies Design layout and specific mechanical parts Order PCB’s Order mechanical parts Order standard components from CERN Stores Order PCB assembly Invoice

Design office DEM-BE Circuit manufacturing DEM-PMT Assembly DEM-WS Sub-contracting Large quantities member states Planning office (DEM-BE) ‘commercial’ contact Ordering Tracking Invoicing Circuit or moduleRequest TS-DEM Sub-contracting (overflow of CERN capacity) Prototypes, fast turn-around local industry staff: includes section leaders staff prod: staff dedicated to production IS: industrial support

CERN Betty Magnin / Erik van der BijTS-DEM Means of DEM-BE Planning office –Planning and technical support (SL): 0.5 Staff –Ordering, administration and follow-up: 2 IS –Invoicing : 0.5 Staff Design office –Management (SL): 0.5 Staff –Librairies : 2 Staff IS –Layout and mechanical design : 8.5 IS

CERN Betty Magnin / Erik van der BijTS-DEM Production means In-house PCB Manufacturing: TS-DEM-PMT PCB Assembly : TS-DEM-WS Outside (we can subcontract all phases) PCB Layout and mechanical design: 1 company PCB Manufacturing: 4 companies PCB Assembly: 4 companies (Manufacturing and assembly for productions of over 10 pieces)

CERN Betty Magnin / Erik van der BijTS-DEM Tools CAE Cadence PCAD CAM350 Autocad Fabmaster EDMS Planning and billing Specific application on FileMaker Several EXCEL worksheets MS Project EDH JMT JMT2 should unify (with TS-CSE)

CERN Betty Magnin / Erik van der BijTS-DEM Document management via EDMS Schematics Specification PCB Layout Manufacturing Assembly Mechanics Pictures Supplier info We send only the EDA number to subcontractors! Items: EDA-xxxxx

CERN Betty Magnin / Erik van der BijTS-DEM Cost aspects Costs temporarily supported by Design Office One project = One Invoice (design+production) Controlled via contracts (suppliers or FSU)

CERN Betty Magnin / Erik van der BijTS-DEM Future evolution Improve IS polyvalence and competence level –Training (on-the-job or seminairs), HF and Fine-Pitch –Visits of PCB manufacturing and assembly subcontractors Improve planning, follow-up and invoicing process –JMT2 with DEM specific extensions made by TS-CSE Evaluate subcontractors for PCB Assembly Extend the service to larger volumes