Construction Engineering 221 Drawings and Specifications.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

PROJECT MANAGEMENT 2 Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.
Construction Engineering 221
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Construction Contracting
Special Inspections
Construction Cost Estimating Class #2: Contract Documents Prof. Ralph V. Locurcio, PE.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
Chapter18 Contract Construction 1CE 417, King Saud University.
Marcy Mealy Procurement Specialist CDBG Program
CIVL202 Construction Engineering I
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
DESIGN PART 1 SELECTING THE DESIGNER AGREEMENT FOR PROFESSIONAL SERVICES.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
PROCEDURES FOR SELECTING THE CONTRACTOR
CSI Certification Presented to the Louisville Chapter of CSI November 13, 2014 Edmund L Brown, CSI, CCCA, Assoc. AIA Project Architect, Sebree Architects.
Cydney McGlothlin, Architect, University of Florida, Gainesville FL
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Six Cert IV - M. S. Martin March 2012.
Construction Engineering 380 Professional Design Services Chapter 12 Appendix G.
Construction Engineering 221 Cost Estimating and Bidding.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
Construction Contract Documents
What Are Construction Documents Construction documents serve as a means of obtaining bids from contractors and are used by contractors to obtain price.
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
Construction Specifications
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Construction Management: At Risk. PROJECT MANAGEMENT STRUCTURE: Contractual Relationships Owner Architect/Engineer General Contractor Sub Construction.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Dublin International Marine Claims Conference - 29th September / 1st October 2004 INTERNATIONAL MARINE CLAIMS CONFERENCE CLAIMS HANDLING FRENCH MARKET.
Construction Contracts and Project Delivery Methods
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
Company LOGO Introduction To An Example Project Prepared by: Alaa El Shorafa Munther Abdel-Hadi Ahmed El Zinati Shukri El Zaza Dr. Kamaleen Sha’th Supervision.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
Specification & Quantities Estimating
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
BCN 4708 Fall 2008 Chapter 4 Drawings and Specifications.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Lecture #2: The Design and Construction Team Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008 AREN 231: Methods and Materials.
PSU ISQA 440, Spring, 2012 Governmental Procurement 1 The Structure of Oregon Law Lloyd Rain Associates
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 9 Slide 1 Unit 9 Specifications and Commercial Construction.
Agency Construction Management :CM NOT AT-RISK
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
34 Specifications Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Explain the purpose of specifications.
MGT 575 Summer 2008 Purchasing. MGT 575 Summer 2008 Steps in the Purchasing Process Accurate description of desired commodity or service Selection of.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
Construction Management At Risk Process
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
CONSTRUCTION CHANGE DIRECTIVES UNDER THE NEW PUBLIC BID LAWS Speaker: STEVEN B. LOEB, Esq. BREAZEALE SACHSE & WILSON, LLP Tel: (225)
UNIVERSITY OF PALESTINE FACULTY OF APPLIED ENGINEERING & URBAN PLANNING CIVIL ENGINEERING DEPARTMENT ENGINEERING PROJECT MANAGEMENT CHAPTER 3 INTRODUCTION.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
CHANGING PROJECT DELIVERY SYSTEMS
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
Administration of a FIDIC Contract - Project Control
PROJECT MANAGEMENT 2 Chu Eu Ho
CHANGING PROJECT DELIVERY SYSTEMS
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Designers’ Manual Appendix Contents
Engineering Project Tendering.
Unique General Conditions of the Alabama Building Commission (ABC)
Directed Change Constructive Change
The Players OWNER/CLIENT Construction Manager (CM)
Presentation transcript:

Construction Engineering 221 Drawings and Specifications

Construction Engineering RPQs 1.Architects and engineers encourage their clients to use competitive bidding and price competition in the selection process for design services. A = True B = False 2.One good aspect of the traditional or linear construction process is that there is usually extensive contractor input into the design process. A = True B = False 3.The purpose of the “retainage” is to hold the contractor accountable to complete the project in accordance with the design. A = True B = False

Construction Engineering RPQ Answers 1.Architects and engineers encourage their clients to use competitive bidding and price competition in the selection process for design services. A = True B = False The correct answer is B. False

Construction Engineering RPQ Answers 2.One good aspect of the traditional or linear construction process is that there is usually extensive contractor input into the design process. A = True B = False The correct answer is B. False

Construction Engineering RPQ Answers 3.The purpose of the “retainage” is to hold the contractor accountable to complete the project in accordance with the design. A = True B = False The correct answer is A. True

Construction Engineering Architect-Engineer (AE) Term is used to designate the organization, person, firm or team that performs the project design, whether it be architectural, engineering, or a combination of both in makeup. Usually not one in the same except in large architectural firms In-House, Owner-Client, Design-Construct, CM, and Design-Manage AIA, NSPE and ACEC

Construction Engineering AE Selections Selection Process – Three options Professional qualifications alone Professional qualifications plus fee evaluation Fee evaluation only What set of circumstances would tend to push an owner to one of these options? NSPE ethical ban on competitive bidding – not permissible by U.S. Supreme Court in 1978 under the Sherman Antitrust Act of 1890.

Construction Engineering AE Scope of Service Prebid Services Needs and desires of the owner Develop the design Preparing documents for bidding or negotiation and contract purposes Aid in selection of contractor Estimate of construction cost Conceptual cost estimate Use ASPE standards manual

Construction Engineering AE Scope of Service Postbid Services Project inspection Checking of shop drawings Approval of periodic payments to contractor Certificate of completion (warranty) Processing of change orders AE will normally have authority from owner to decide contract interpretation questions, judge performance, condemn defective work and stop field operations under certain circumstances.

Construction Engineering AE Design Services Fees Percentage of construction cost Multiple of salary cost Multiple of salary cost plus nonsalary expense Fixed lump-sum fee. Total expense plus professional fee Hourly or per diem charge

Construction Engineering AE Liability To the owner To third parties Exculpatory clauses Statutes of limitations Product liability or strict liability

Construction Engineering Design Drawings Three important functions Basis for competitive bidding or negotiations Contract administration during construction Basis for settlement of claims and disputes Also, with modification serve as “as builts” Ownership of design Public – ownership is the public agency Private – Architect (most protect with “copyright ©”unless contract says otherwise

Construction Engineering Design Drawings Why is complete, intelligible, accurate, detailed and well correlated important? Typical subgroups in a set of drawings Site plan Structural Architectural Plumbing Mechanical Electrical Standardized drawing details (typically engineering details for site and civil work-roads, utilities)

Construction Engineering Specifications Written instructions concerning project requirements Bidding and contract documents with technical specifications Often master specifications are used – be careful Residential and Building – use CSI 16 Division format (see Appendix B, pages Engineering – use AASHTO (pages )

Construction Engineering Specifications General Conditions (AIA Document A201) (see Appendix C, pages ) Supplementary (Special) Conditions Project specific Requirements “MUST” Read for Bidding and Building

Construction Engineering Specifications Technical Specifications Most combine Performance and Design requirements Performance Design

Construction Engineering CLOSED Specifications One brand ONLY – Proprietary product Very non-competitive, therefore higher costs Not allowed in public projects Not recommended for any project, although allowed by private owners

Construction Engineering OPEN Specifications Allow competition between manufacturers Sets standards for material quality MAY list several manufacturers and their brand name of product Allow “OR APPROVED EQUAL” substitutions Substitutions are at the contractor’s risk, subject to the architect’s review and approval

Construction Engineering STANDARD Specifications Most common for roads, utilities Not issued as part of the specifications book for the specific project Issued as a separate specifications book by many state Departments of Transportation, Cities and Towns Cover standard materials used in most projects Concrete mix designs Fire Hydrants Manhole structures

Construction Engineering QUIZ #1 Tomorrow at the beginning of class Covers chapters 1, 2, 3 and 4 and material covered in class