Software Capabilities Status Software Capabilities Status Danette Likens and Mike Coyle AIM Team 19 September 2012.

Slides:



Advertisements
Similar presentations
Authoring Instructional Materials (AIM)
Advertisements

AIM Enterprise Central Site Planning
MT Continuum Status 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr Mike Lueken, LM SS for SSP Wendy Pester, CSF for SSP Joe Farbo, LSI Jamie Stewart, AIM team.
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Jake Aplanalp, AIM Pgm Mgr 23 Aug 11.
Demonstrations AIM II CTTL Import to CPM for pre-JDTA
AIM User Training Status
AIM User Training Status 24 August 2011 Tiffany Dombrowski, AIM Pgm Mgr Dave Donnelly, CSFE, AIM User Training CCMM Yvette Bartholomew, CPPD, CD Course.
AIM CPM/LOM Tom Bonnano N74 21 August 2014.
Mr. Mike Mosley Learning Standards Branch Head 04 Feb 2014
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Mr. Tom Bonnano Learning Standards Branch Head 24 FEBRUARY 2015
MT Continuum Status 25 February 2015 Presented by Mark Campbell, LMSSC Gerry Cullison, SSP.
AIM FRB Meeting 4-6 November Meeting Logistics Parking Base Access – not needed Coffee Vending Machines Food Facilities Come & Go as needed…
Authoring Instructional Materials (AIM) Roadmap
MT Continuum Status 4 February 2014 Gerry Cullison, SSP Peter St Jacques, MT Continuum Team System Integrator.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 LCDR Brewster, NAVMAC Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD 18.
Validata Release Coordinator Accelerated application delivery through automated end-to-end release management.
MT Continuum Status 21 August 2014 Presented by Bryan Miller, LMSSC Gerry Cullison, SSP Peter St Jacques, NUWC MTC Lead System Integrator.
MT Continuum Status Feb 11 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI Jamie Stewart, AIM team.
1 AIM User Training 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Dave Donnelly, CSFE, AIM Course CCMM Yvette Bartholomew, CPPD, Curr Dvlp Course.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
AIM Background & Current Capabilities Brief to FRB Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando November,
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
AIM Program Software Status
A look at the NETC End-to-End (E2E) Process using the Content Planning Module (CPM) / Learning Object (LO) Module.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2009.
Feb 2011 AIM FRB Action Item Review 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr.
NETC N6 Status Update on AIM in the NETC Enterprise Architecture 23 Aug 11 Bruce Bare, NETC, N62 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
Modernized AIM Functional Requirements 6 November 2009 Ron Zinnato, NAWCTSD, AIM Lead S/W Eng Jamie Stewart, AIM Team.
Module 16: Software Maintenance Using Windows Server Update Services.
NETC N72 Status Update to AIM FRB NETC N72 Status Update to AIM FRB John Wishall 23 April
New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 George Vogel, NAVMAC 00C Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.
Release & Deployment ITIL Version 3
Navy Job Analysis (NJA) 1.  Purpose: Restore, streamline and improve Navy Job Analysis Management Capabilities  Supports: Navy Occupational Classification,
1 Bruce Bare NETC Authoring Instruction Materials (AIM) Roadmap February 2014.
US Dept. of Housing and Urban Development Office of Community Planning and Development IDIS Project Status December 15, 2005.
FRB NAVEDTRA 136 Business Process Refinement FRB NAVEDTRA 136 Business Process Refinement Roy Hoyt, NETC N74 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD Jamie.
NETPDTC AIM Enterprise Centralization NETPDTC AIM Enterprise Centralization Peg David, NETPDTC N621, AIM Tech PM Roy Hoyt, NETC N74 Functional PM/Resource.
AIM Virtual FRB Meetings Sep, & 1400 Both Days.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
AIM Team Software Status AIM Team Software Status Mike Matzko AIM Team 20 August 2014.
MT Continuum Status 3 Apr 12 Tiffany Dombrowski, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, MT Continuum Team Jamie Stewart, AIM team.
End HomeWelcome! The Software Development Process.
MT Continuum Status 4-6 May 2010 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI.
Status of AIM I/II and CPM/LO Module Software 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Ron Zinnato, NAWCTSD, AIM Lead S/W Eng.
ICT Standards and Guidelines The Structure of the Project Akram Najjar CNSI – Senior Consultant Director of InfoConsult.
2010 Practice Management Annual Conference - LexisNexis Confidential - What’s New With Time Matters Steve Fetters September 15 th 2010 Las Vegas, NV.
AIM/CPM Briefing & Demo 4 November 2009 Jamie Stewart, AIM Team ISD Lead Danette Likens, AIM Team ISD.
SOW Update SOW Update Mike Matzko AIM Team 21 August 2014.
Overview September Agenda Overview of AIM Introduction to AIM Team AIM in the Navy Education and Training Command (NETC) Enterprise.
NETPDTC AIM Central Site and CPM Hosting 4-6 May 2010 Bruce Bare, NETC, CIO Denise Green, CNATT, N6 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
AIM User Training IPT Status Feb 11 Roy Hoyt, NETC N74 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Yvette Bartholomew, CPPD, CD Trng CCMM Dave Donnelly,
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr Feb 11.
NETC N7 Update to AIM FRB NETC N7 Update to AIM FRB Mike Mosley, NETC N74 23 April
JDTA Item and Learning Object Versioning – Proposed Approach JDTA Item and Learning Object Versioning – Proposed Approach Jamie Stewart, Steve Wicinski,
AIM FRB Briefing Mike Clifford LSO Kings Bay Submarine Learning Center November 2008.
In-Process and Potential Future Software Capabilities Status In-Process and Potential Future Software Capabilities Status Danette Likens and Jamie Stewart.
AIM FRB Meeting Overview 4-6 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
1 NETC N7 Status Update to AIM FRB 4 November 2009 Roy Hoyt, NETC N74 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
AIM Program Software Status FRB/CCB Meeting 24 February 2016.
Bill SahrNSF Review May , EVLA Monitor & Control.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Lesson Objectives 1) Review the steps involved in problem solving 2) Review the stages of the System Life Cycle 3) Describe what prototyping is and the.
Support 2001.
Enterprise Content Management Owners Representative Contract Approval
IS&T Project Reviews September 9, 2004.
Learning Management System (LMS) Alignment Meeting April 02, 2019
September 12-14, 2018 Raleigh, NC.
Presentation transcript:

Software Capabilities Status Software Capabilities Status Danette Likens and Mike Coyle AIM Team 19 September 2012

Overview Tasked and funded software enhancements Updated software release and distribution model Functional gaps between traditional AIM I/II and CPM/LO Module LO Module Webification New capabilities demonstrations

Future Distribution Model Continued major numbered releases driven through formal NMCI certification and released to users only when ready for NMCI push OR Central Site-based progressive release of enhanced functionality as software is accepted by the government and needed by user community

Assumptions All NETC domain AIM I/II/LO Module users will do production work on the NETPDTC Central Site instances after 30 Sep 12 Local AIM installations on NMCI PCs within the NETC domain will be minimal Non-NMCI PCs used for AIM-based curricula development or maintenance can be updated responsively by local IT staff (government and contractor)

Update Process Given assumptions, all future functional enhancements to AIM I/II/LO Module will be done as quarterly incremental updates vs. major numbered releases Update packaging will be determined and managed by the AIM Program Manager and Lead Engineer, as coordinated with NETC N74 and FRB NETPDTC Central Site System Admins will install updates as released by AIM Pgm Office AIM Lead Engineer will post updates and notify non- Central Site users (government or contractor) for responsive download and installation by local IT staff

Outliers Remaining local NMCI AIM I/II/LO Module instances (NETC and non-NETC) will still have to go through software push by NMCI, based on formal certification testing TRANET classrooms generally lag latest release: should we have a NETPDTC Citrix training instance with the implication of restricting training to CAC holders Likely result of this new release process: local NMCI users will lag (possibly far) behind capability of AIM I/II/LO Module users on NETPDTC Central Site or local non-NMCI instances

Mitigating Actions More aggressive action by NMCI to test and push annual or semi-annual updates can shorten the lag between Central Site and local NMCI instances Alternatives: ‒ Identify and bring remaining NMCI users into central site ‒ Wait until CPM & LO Module are merged into 1 web application

Full OCCSTDS Support in CPM NAVMAC and NETC N7 working closely to transition full support for OCCSTDS development, maintenance, and publication into OCCSTDS Tab in CPM Leverage ongoing functional prototype in work at NAVMAC to define complete business process Extend that functionality into CPM OCCSTDS tab (added in CPM Rel 5.0: ongoing functional enhancements for data import into CPM and for OCCSTDS-to-JDTA tab data mapping for the end-to- end NETC N7 learning content business process) Schedule and resources TBD

LO Module Webification Phasing Phase 1: TO 0005, Task g Final Design Document (FDD) – fully funded under TO 0005 Phase 2: Update Phase 1 release of ‘Webified’ LO Module to support desktop client LO Module Release 5.0 functionality as tasked under TO 0011 – partially funded under TO 0011; may required additional resources to provide all Release 5.0 comparable functionality Phase 3: Update Phase 2 release of ‘Webified’ LO Module to support all desktop client LO Module functionality tasked under TO 0011 and TO 0012 – TBD K$ under future TO Phase 4: Update Phase 3 release of ‘Webified’ LO Module support final desktop client LO Module functionality implemented prior to ‘freeze’ of desktop client enhancements – TBD K$ under future TO

LO Module Webification Schedule

Demonstrations (Thurs am) AIM II CTTL Import to CPM for pre- JDTA LO Module Webification Prototype 3 CPM Existing Interventions linking Front End Analysis Prototype

Questions?

Backup Slides