MeRHIC Design V.Ptitsyn on behalf of MeRHIC Design team: M. Bai, J. Beebe-Wang, I. Ben-Zvi, M. Blaskiewicz, A. Burrill, R. Calaga, X. Chang, A. Fedotov,

Slides:



Advertisements
Similar presentations
Beam Dynamics in MeRHIC Yue Hao On behalf of MeRHIC/eRHIC working group.
Advertisements

Overview of Low Energy RHIC e-Cooler (LEReC) project and needed RHIC upgrades Vladimir N. Litvinenko Department of Physics and Astronomy, Stony Brook.
Accelerator R&D towards eRHIC Yue Hao, C-AD For the eRHIC Team.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Ion Accelerator Complex for MEIC January 28, 2010.
4th Electron-Ion Collider Workshop, Hampton University, May BNL R&D ERL and Coherent Electron Cooling test at RHIC Outline Goals of R&D ERL.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Recirculating pass optics V.Ptitsyn, D.Trbojevic, N.Tsoupas.
ERHIC Main Linac Design E. Pozdeyev + eRHIC team BNL.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
V.N. Litvinenko, ElC Collaboration Meeting, Hampton University, May, 2008 Staging of eRHIC Increased Reach in c.m. Energy and Luminosity Vladimir.
Electron and Ion Spin Dynamics in eRHIC V. Ptitsyn Workshop on Polarized Sources, Targets and Polarimetry Charlottesville, VA, 2013.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC Engineering Challenges and Solutions for MeRHIC.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
ERHIC ZDR Design V.Ptitsyn. Detailed document (265 pages) reporting studies on the accelerator and the interaction region of this future collider. The.
18 th International Spin Physics Symposium Polarized Beams at EIC V. Ptitsyn.
Thomas Roser EIC collaboration workshop MIT, April 6, 2007 eRHIC Design eRHIC Schemes R&D Items Cost and Schedule.
Toward a Test Facility for an ERL Circulator Ring Based e-Cooler MEIC Electron Cooler Test Facility Planning Retreat January 31, 2012.
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
EIC Meeting, Stony Brook University, January 10, 2010 Dmitry Kayran for MeRHIC group EIC Meeting January , 2010 MeRHIC: Injection System.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Synchrotron radiation at eRHIC Yichao Jing, Oleg Chubar, Vladimir N. Litvinenko.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility EIC Collaboration Meeting, Hampton University, May 19-23,
MEIC Staged Cooling Scheme and Simulation Studies He Zhang MEIC Collaboration Meeting, 10/06/2015.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Overview of ERL MEIC Cooler Design Studies S.V. Benson, Y. Derbenev, D.R. Douglas, F. Hannon, F. Marhauser, R. A Rimmer, C.D. Tennant, H. Zhang, H. Wang,
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Beam Dynamics in MeRHIC Mike Blaskiewicz On behalf of MeRHIC/eRHIC working group.
ERHIC Conceptual Design V.Ptitsyn, J.Beebe-Wang, I.Ben-Zvi, A.Fedotov, W.Fischer, Y.Hao, V.N. Litvinenko, C.Montag, E.Pozdeyev, T.Roser, D.Trbojevic.
ERHIC with Self-Polarizing Electron Ring V.Ptitsyn, J.Kewisch, B.Parker, S.Peggs, D.Trbojevic, BNL, USA D.E.Berkaev, I.A.Koop, A.V.Otboev, Yu.M.Shatunov,
2009 RHIC & AGS Annual Users' Meeting June eRHIC Conceptual Design V. Ptitsyn, J. Beebe-Wang, I. Ben-Zvi, A. Burril, R. Calaga, H. Hahn, A. Fedotov,
ERHIC design status V.Ptitsyn for the eRHIC design team.
9/24-26/07 e- KOM Slide 1/20 ILC Polarized e- source RDR Overview A. Brachmann.
Thomas Roser EIC AC meeting November 3-4, 2009 EIC Accelerator R&D Strategy and Programs Thomas Roser/Andrew Hutton BNL / Jefferson Lab R&D program is.
D. Trbojevic, N. Tsoupas, S. Tepikian, B. Parker, E. Pozdeyev, Y. Hao, D. Kayran, J. Beebe-Wang, C. Montag, V. Ptitsyn, and V. Litvinenko eRHIC and MeRHIC.
1 V. N. Litvinenko, 1st ECFA-CERN LHeC Workshop, Divonne-les-Bains, France, September 2, Vladimir N. Litvinenko Collider-Accelerator Department,
09-21 Study of bunch length limits Goals: To identify and observe effects which put limits on the minimum bunch length in RHIC. Try to distiguish the limitation.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Jorg Kewisch, Dmitri Kayran Electron Beam Transport and System specifications.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
Bob Lambiase May 21, The purpose of eRHIC is to have the capability to collide heavy ions with leptons, such as electrons and polarized electrons.
ICFA Workshop on Future Light Source, FLS2012 M. Shimada A), T. Miyajima A), N. Nakamura A), Y. Kobayashi A), K. Harada A), S. Sakanaka A), R. Hajima B)
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
P OSSIBILITIES FOR MAINTAINING AA AND PP CAPABILITIES IN PARALLEL WITH E RHIC V. Ptitsyn Collider-Accelerator Department BNL RHIC and AGS Users Meeting,
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
V. Ptitsyn on behalf of eRHIC Design team: E. Aschenauer, M. Bai, J. Beebe-Wang, S. Belomestnykh, I. Ben-Zvi, M. Blaskiewicz, R. Calaga, X. Chang, A.Fedotov,
eRHIC Design and R&D From RHIC to eRHIC
Beam-beam effects in eRHIC and MeRHIC
R&D Topics for FOA Funding Proposals
Large Booster and Collider Ring
Beam polarization in eRHIC
CEPC-SppC Accelerator CDR Copmpletion at the end of 2017
eRHIC with Self-Polarizing Electron Ring
A brief Introduction of eRHIC
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Electron Source Configuration
LHC (SSC) Byung Yunn CASA.
Interaction Region Design Options e+e- Factories Workshop
Collider Ring Optics & Related Issues
Why is the CBETA Important for the Electron Ion Colliders?
JLEIC Collaboration Meeting Spring 2017
MEIC New Baseline: Luminosity Performance and Upgrade Path
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
MEIC New Baseline: Part 7
MEIC New Baseline: Performance and Accelerator R&D
HE-JLEIC: Do We Have a Baseline?
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

MeRHIC Design V.Ptitsyn on behalf of MeRHIC Design team: M. Bai, J. Beebe-Wang, I. Ben-Zvi, M. Blaskiewicz, A. Burrill, R. Calaga, X. Chang, A. Fedotov, H. Hahn, Y. Hao, L. Hammons, D. Kayran, V. N. Litvinenko, G. Mahler, B. Parker, E. Pozdeyev, T. Roser, A. Pendzick, S. Plate, T. Rao, S. Tepikian, D. Trbojevic, E.Tsentalovich, N. Tsoupas, J. Tuozzolo, G. Wang

Talk Outline  MeRHIC layout and general description  Design beam parameters and luminosity  Design components: Electron linac Recirculation passes Interaction region Injector  Summary

STAR PHENIX e-e- p 4 GeV electrons GeV protons 100 GeV/u Au ions RHIC and MeRHIC  MeRHIC – Medium energy eRHIC. First stage of the electron-ion collider at BNL.  Electron acceleration is based on energy-recovery linacs.  Electrons collide with protons and ions from RHIC Blue ring. Only minimal modifications of existing RHIC rings at IR region.  Polarized electron and proton beams. Longitudinal polarization orientation at the collision point for both beams.  Parallel operation with the p-p (or ion- ion) collisions at PHENIX and STAR detectors. Up to 63 GeV center mass energy

MeRHIC at IR2 region (April 09) Linac 1 Linac 2 Main ERLs; 36 cavities x 18 Mev/cav = 0.65 GeV per linac 0.75, 2.05, 3.35 GeV 0.1, 1.4, 2.7 GeV Pre-accelerator 90 MeV ERL Electron gun 0.1 GeV Beam dump 2 nd harmonic cavities Fundamental cavity on 4 Gev pass IR2 region features: - asymmetric detector hall (appropriate for asymmetric detector for e-p collisions) - long wide (7.3m) tunnel on one side from the IR (enough space to place energy recovery linac(s)) Main components: -100 MeV injector on the basis of polarized electron gun (50 mA) and pre-accelerator ERL. -Two main ERLs (one of them in the RHIC tunnel) with maximum 0.65 GeV energy gain per linac. -Recirculation passes: warm magnets, acceptable synchrotron radiation power. 4 GeV e-e- p

Proton and ion beam for MeRHIC  Goal: modifications for proton (ion) beam have to be minimal  IR design: use of existing triplets and D0 magnets, removal of IR2 DX magnets, addition of warm dipole magnets.  Addition of two spin rotators in Blue ring.  Required proton beam parameters are either already achieved or planned to be achieved in 2-3 years for RHIC operation.  MeRHIC will take advantages of planned improvements in RHIC (for RHIC operation): 56 MHz SRF, stochastic cooling (for ions) …

MeRHIC parameters for e-p collisions Baseline design (no cooling) Pre-cooled at the injection energy With high energy cooling (CEC) pepepe Energy, GeV Bunch repetition time, ns 105 Bunch intensity, Bunch charge, nC Normalized emittance, 1e-6 m, 95% for p / rms for e rms emittance, nm beta*, cm 50 rms bunch length, cm /200.2 beam-beam for p /disruption for e 1.5e e /30 Peak Luminosity, 1e32, cm -2 s

MeRHIC Linac Design MHz 1.6 m long Drift 1.5 m long 100 MeV 4 GeV 65m total linac length All cold: no warm-to-cold transition E.Pozdeyev Based on BNL SRF cavity with fully suppressed HOMs Critical for high current multi-pass ERL 7 Modular structure I. Ben-Zvi Current breakdown of the linac N cavities = 6 (per module) N modules per linac = 6 N linacs = 2 L module = 9.6m L period = 10.6 m E f = 18.0 MeV/m  dE/ds  = 10.2 MeV/m

Recirculation pass lattice  Achromatic and isochronous arc design  Flexible Momentum Compaction Lattice-> adjustable M 56 parameter  Large dipole filling factor (64%) -> reduced synchrotron radiation (< 2kW/m)  Initial dipole and quadrupole magnet design has been developed Vertical arrangement of recirculation passes D. Trbojevic, N. Tsoupas 27.8m

IR Design Features  Provides the integration of detector dipole magnets into the beam separation scheme  Provides the ability to vary the proton beam energy from 80 to 250 GeV at constant electron beam energy.  Provides effective SR protection: soft bend (~0.05T) is used for final bending of electron beam  Focusing elements are located far from the IP (first electron quad at 11m) © J.Bebee-Wang p, Au e Solenoid, 4 T 1T,3m dipole 1T,3m dipole 40 m Soft dipole Soft dipole 9

Injector and Pre-accelerator Design Gatling Gun (Ek=200keV) 10 MeV Injector 90 MeV Linac 1.4, 2.7, 4 GeV 11 m 10 MeV x 50 mA 0.5 MW Beam Dump from MeRHIC arcs to MeRHIC vertical combiner 10 MeV Booster Linac 30 m Injector Parameters: Polarized Gun (200kV) Cathode GaAs, Laser 780nm Emax= 10 MeV Iavr =50 mA, Q per bunch =5nC Design realizes bunch compression and spin direction control Pre-accelerator linac: Standard MeRHIC linac cryomodule (~10m) with 5x703 MHz 5-cell cavities and one 3rd harmonic 2.11 GHz inside. Two transition sections (0.5 m each) attached from both ends Energy gain 90 MeV Output beam parameters : E=100 MeV Iavr=50 mA Ipeak=500 A Reprate = 9.8 MHz Emittance =70 mm-mrad Bunch length = 2-3 mm dE/E = 1E-3 X. Chang and D. Kayran

Summary: MeRHIC Design Status The lattices of all machine components (injector, recirculation passes, linac, interaction region, mergers/splitters) have been developed. (D. Trbojevic’s and D.Kayran’s talks) The interaction region with the detector fully integrated into the accelerator environment has been designed. (J. Beebe-Wang’s talk) The most important beam dynamics effects, defining achievable beam parameters, machine luminosity and polarization have been studied. (M.Blaskiewicz’s, M.Bai’s amd Y.Hao’s talks) No show-stoppers had been found. Design development of high current polarized electron gun is underway. (X.Chang’s talk) Conceptual designs of superconducting linac and its cryomodule have been done. (I. Ben-Zvi’s talk) Engineering realization of various design aspects and accelerator system (magnets, vacuum, civil construction …) has been considered. (J. Tuozzolo’s talk) Detailed cost estimate of MeRHIC has been completed, including all machine systems, civil construction and utilities. In early October 2009, an Internal BNL Committee reviewed the MeRHIC cost estimate. The cost came to ~$350mln (without the detector).