ATF Cooling Water System Toshiyuki OKUGI, KEK 2015/ 2/ 24 ATF2 Project Meeting LAPP (Annecy, France)

Slides:



Advertisements
Similar presentations
CEPC BoosterDesign CEPC Booster Design FCC Week 2015, March, 2015 Marriot Georgetown Hotel Huiping Geng Presented for Chuang Zhang.
Advertisements

Status of ATF/ATF2 and machine schedule in this fall Impact of the earthquake Recovery status, alignment Schedule in this fall N. Terunuma, KEK.
10 October 2006 MICE CM-16 at RAL 1 Distributed versus Lumped Coupling Magnets Michael A. Green and Soren Prestemon Lawrence Berkeley Laboratory, Berkeley.
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Vacuum system Available beam scraper Beam dimensions, Target cell Machine Studies on February 7 th 2009.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
DORIS - 2 GeV Experiences in 2011 Olympus Collaboration Meeting April 27th, 2011 F.Brinker.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
IPBSM - Stability of the laser system - Nobuhiro Terunuma Feb. 12 th 2014, KEK, 17 th ATF2 project meeting.
BPM Orbit Data Analysis with Wakefields Glen White, SLAC January 2013.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
FFS Issues in the 2011 autumn continuous operation Toshiyuki OKUGI (KEK) 1/13/2011 The 11 th ATF2 project meeting SLAC, USA.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
Continuous Run in May K.Kubo. Final Focus Test Line IP; ~40 nm beam ATF Linac (1.3 GeV) ATF Damping Ring (140 m) Extraction Line Photo-cathode.
Vacuum Issues from the Beam Dynamics Point of View Marc Muñoz.
Status of X-Band PPM Klystron R&D for JLC KEK Yong Ho Chin ISG9 KEK December 10-13, 2002.
ATF2 Optics for the Commissioning Toshiyuki Okugi, KEK 2008 / 10/ 22 ATF2 commissioning meeting.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ATF DR Overview Introduction Low emittance history Present status S.Kuroda ( KEK ) GDE Review 3rd Apr.2013.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Plan in summer shutdown Magnet -SF1FF -Swap of QEA magnet - Multipole field of Final Doublet IP-BSM improvement.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
1 Injection tuning of ATF Design acceptance of the ATF-DR Emittance(x,y)3x10 -3 m Timing +/-350ps dE/E+/-1.5% To supply stable beams to ATF2, the injector.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
Status of ATF Fast Kicker Experiment
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Principals of fast injection and extraction R. Apsimon.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
Wakefield effect in ATF2 Kiyoshi Kubo
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
Status of ATF2 linear collider focus prototype emphasizing France-China joint contributions Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
LLRF regulation of CC2 operated at 4˚K Gustavo Cancelo for the AD, TD & CD LLRF team.
Operation Status of the RF Systems and Taiwan Photon Source
ATF2 Status N.Terunuma, KEK
Areal RF Station A. Vardanyan
BNL-SLAC-Annecy TeleConference
Expected hardware status and Priority of the commissioning task
SuperB Injection, RF stations, Vibration and Operations
Horizontal e+ instability Study & Solution
Beam-based alignment measurements
Status of ATF/ATF2 and machine schedule in this fall
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
Strip-line Kicker R&D at KEK-ATF
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
Design Study of the CEPC Booster
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Tuesday 20 September 2011.
Monday 27th August & night
Presentation transcript:

ATF Cooling Water System Toshiyuki OKUGI, KEK 2015/ 2/ 24 ATF2 Project Meeting LAPP (Annecy, France)

DR Magnet ( 1000 l/m ) DR Magnet Sub ( 400 l/m ) DR Magnet DR Vacuum DR RF DR Klystron DR RF Cavity DR Cavity EXT&FF Magnet AUX LUCX LINAC LINAC RF Cooling Facilities Loads Schematic Figures of ATF Cooling Water System Replaced to Unit System at 2014 October Cooling Tower was outside of Assembly Hall

Linac Cooling Water System June and July Operation Outside temperature was increased. The floor of Assembly hall was expanded. The frequency of RF system was changed to match the circumference of DR. The frequency of RF system was mismatched to the resonant frequencies of Linac cavity. The injection energy to DR was reduced. Before 2014, we stopped the beam, or operated with mismatched DR circumference. From 2014, the temperature of linac RF system was changed to match the appropriate frequency by Naito-san. We could operate in June (We achieved the minimum beam size.) LINAC LINAC RF

DR Magnet Cooling Water System DR Magnet ( 1000 l/m ) DR Magnet Sub ( 400 l/m ) DR Magnet Operate with 2 Cooling water system to increase the water flow. When we operate with single water cooling system, we sometimes have a water flow interlock for individual magnets. The temperature of each cooling system is stabilized within each system. Since the cooling tower for main cooling water system was located outside of assembly hall, the cooling power was very strong in winter. Temperature sensor for feedback Temperature sensor for feedback

DR Cooling Water Temperature (2014/12/01 – 2014/12/21) 2 degree C / div The DR horizontal orbit was oscillated with the DR cooling water temperature. The FF vertical orbit was also oscillated with DR cooling water temperature. - Since we operated with ultra-low beta optics at December 2014, we could clearly observed the oscillation in FF beamline. - Since the frequency of FF orbit oscillation was twice as DR cooling water temperature, DR horizontal orbit oscillation was converted to FF oscillation through skew sextupole field at septum. Naito-san adjusted the feedback parameters of the cooling water.

2014 March (03/03-03/07) 2014 April (04/14-04/18) AM 0: June (06/02-06/10) AM 0:00 AM 0:00 AM 0:00 AM 0:00 Maximum IP-BSM modulation was more than 50%. Maximum IP-BSM modulation was limited around 30%. Cooling Water Temperature in 2014 Spring Operation 2 ℃ / div 17.9 ℃ 21.7 ℃ 25.1 ℃ 21.0 ℃ 14.5 ℃ Maximum temperature at Tsuchiura city 8.9 ℃ 6.3 ℃ 9.1 ℃ 9.6 ℃ 7.0 ℃ Minimum temperature at Tsuchiura city by Japan Meteorological Agency 2 ℃ / div In 2014 January to March, the temperature of DR magnet cooling water was also fluctuated. In 2014 June, the temperature of DR magnet cooling water was stable.

Plan to be stable DR Magnet Cooling Water System DR Magnet ( 1000 l/m ) DR Magnet Sub ( 400 l/m ) DR Magnet The temperature sensor of main cooling water system will be moved to be after combined to that of sub-system. The sensor of sub-cooling water system will be kept to be same location. The water temperature within cooling water system will be changed for summer and winter season. Temperature sensor for feedback Temperature sensor for feedback

DR RF Cooling Water System (2014 December) Temperature variation of DR RF cooling water RED; DR RF cavity GREEN; DR RF klystron Kicker trouble was cured. The temperature of DR RF cavity was decreased. On the other hands, the temperature of DR klystron was a little bit increased. Was the most of RF power reflected at cavity ? - Tuner ? - Temperature ? Was the low power RF off ?

DR RF Cooling Water System (2014 June) Temperature variation of DR RF cooling water RED; DR RF cavity GREEN; DR RF klystron We observed same situation in other season too.

DR Vacuum Cooling Water System (2014 May) The IP beam size was increased. And we found that the cooling water system of DR vacuum was stopped. Therefore, the cooling water system was restarted. After the cooling water system was restarted, the FF orbit was changed, and the IP beam size was recoverd. Restart the DR vacuum cooling water system The current of FB corrector was changed before and after restart DR vacuum cooling water system FB kicker current ATF FF Y orbit The temperature or pressure of the DR vacuum cooling water also affect to beam.

We can store the beam to DR in June from 2014, because Naito-san prepared the LINAC cooling water temperature control system in order to adjust the resonant frequencies of LINAC RF cavities. Before 2014, the beam energy was reduced in LINAC after June, when we adjusted the LINAC frequency to adjust the DR circumference. Summary The stability of cooling water temperature is very important. LINAC RF Cooling Water System DR Magnet Cooling Water System Stability of DR MAG cooling water temperature strongly depends on the outside temperature, especially the summer season was stable. ( We measured smaller IP beam size in June 2014.) DR RF Cooling Water System We observed the temperature of DR cavity cooling water was dropped down. We should check the stored power in DR cavity (not yet). DR Vacuum Cooling Water System The temperature of DR vacuum system affect to the beam orbit. EXT&FF Magnet Cooling Water System The cooling water system was very old, and sometimes had troubles. Therefore, the system was replaced to new unit system at 2014 October.

DR Cooling Water Temperature (2014/12/01 – 2014/12/21) 2014/12/12 (1 hour) 2014/12/16 (1 hour) 2 degree C / div Maximum IP-BSM modulation was around 30%. Naito-san adjusted the feedback parameters of the cooling water.