QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.

Slides:



Advertisements
Similar presentations
Access BDD Survey School
Advertisements

Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
Stave 130 Tooling John Carrol & Tim Jones. Status First generation stave assembly tool model modified to incorporate… – Stave Geometry Length 1277mm Width.
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
PPAP Requirements Training
Interim Design Amy Eckerle Andrew Whittington Philip Witherspoon Team 16.
SEACORK INSTALLATION ON A CATAMARAN The first step is to make templates of all corner pieces to be cut from sheet material, which will be used for border.
3- Pipsqueak Piston and Cylinder. Work holding in the Lathe Collets have definite advantages over chucks in gripping work pieces in the lathe. They apply.
PERSISTENT SURVEILLANCE FOR PIPELINE PROTECTION AND THREAT INTERDICTION Micromachining of Inertial Confinement Fusion Fast Ignition Targets Michael Mauldin.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Quality control of raw materials In-process control
Introduction to Precision Metrology
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
Direct Shear Test CEP 701 PG Lab.
Module mounting Ian Wilmut (RAL). Martin Gibson Martin has been developing the module mounting system at RAL for the last two years – everything we have.
Gage Blocks.
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
PLAN #PartProcessTools and equipmentQuality controlSafety *Aprons must be worn is ALL stages of manufacture Tim e 1 MDF base Mark out on MDF piece Pencil,
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
LINEAR MEASUREMENT.
LSU 05/13/2004Mechanical Design Guidelines1 Ballooning Unit, Lecture 4.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
MICE Target Mechanical Design l Contents »Status of modelling and drawing »Work being undertaken at RAL on shaft and bearing prototypes »Procedure for.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
Raw Material & Sub-Assembly QA (Tim) 25/09/14 25/09/2014Material & Sub-assembly QA1.
Some Recent BNL, LBNL and Yale Work 1.Honeycomb flatness from manufacturer 2.Commercially fabricated C-channel 3.VCR Fittings 4.BN powder thermal evaluations.
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
OBTAINING QUALITY MILL PERFORMANCE Dan Miller
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Manchester Qualification M-O-048. Mechanical dummy. Check that tuning of alignment parameters had correct sign and adjustment of transfer chucks Z was.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 Assembly/QA status, schedule.
Plank #7 and beyond. 2 What was new for plank#7? Carbon-fibre jig Oversize (by 10mm) facesheets during stave core build –Facesheets now at the very limit.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
Homework: Use the information that you gathered this week to draw out your plan view working drawing, 1:1 scale. Use sheet 6. Hand in next week. Start.
Concrete Weight Coating Plant “Aladja”
Stave Core Thermo-mechanical and Electrical Performance Requirements (Tim) 10/07/2013Liverpool WP4 Meeting (11/7/13)1.
Stave130 Assembly Jig (Tim). Current Tooling Components – CF jig + ‘C’-channel jig & various face-sheet positioning aids It works! – Seems to produce.
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
Stave production.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Stave Tooling & Plans for Future Stave-building (Tim)
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
ENM208 INTRODUCTION to MACHINING ANADOLU UNİVERSITY Industrial Engineering Department.
Strip Stave Status & Plans at Yale Yale: Paul Tipton, Will Emmet, Tom Hurteau.
TWI Welding Inspection Duties/Terms Course Reference WIS 5 M.S.Rogers.
Task 5: Test / Shipping Status Report. Overview  Where are we  Chamber  Stavelet holder frame  Module mounting frame  What next QMUL Sept 10.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Direct Shear Test.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
MICE Target Mechanical Design
Manufacturing of the first FCC-hh beam screen prototype for ANKA
A comparison of Some Properties of Sandwich Test Tokens with Various Core Materials (Tim)
Taxonomy of Wood Products Engineered Wood Products
ATLAS ITK WP3 WP3 Bi-weekly meeting
Demilune Table Won the SAPFM Award Texas Furniture Makers Show
Presentation transcript:

QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL

QA / QC issues: Quality Control is the process that ensure quality during production. This should address the following issues: Dimensional accuracy;  Thickness check at various stages of production;  Every stage check of sub-assembly mass allow cross reference to finished dimension  Check critical tooling dimensions periodically to ensure tooling dimensions are consistent and not deviate during production / handling or glue built-up etc Bonding quality;  glue samples (i.e. take glue sample for testing every time of mixing glue during stave production);  Control of glue usage – not ultimate control of glue thickness, but indicates the correct amount being used;  Need a test procedure for detecting delamination both during and post production– e.g. use of finger printing technique (need to develop) Flatness control  This could be influenced by ambient temperature changes, machine tool weariness, internal stress in material,  Operator dependent errors such as Debris / particles in the glue, evenness in glue application and etc. A procedure is needed to minimise such error ;

QA / QC issues Quality assurance is a set of procedures that allows the monitoring of quality. This should address the following points: QC procedures – a set of procedures to ensure the above are implemented during production Manufacturing Records – check box on procedures, traceable records on production parameters; Procedures for Document version / Change / Repair Control; Machine tool weariness – affect on product dimensional tolerance Acceptance procedures – any test required to ensure products meets the required specifications; As build dimensions – a record of final dimensional check etc

Example of QC / QA Visual inspection the surface quality of co-cured face sheet, to see if there is any wrinkles, glue bleeds, delamination.. etc Record its mass Measure the length & thickness (By Georg)

QA: Weigh sheet; Visual inspection that sheet is placed in position correctly (By Georg)

At this stage, the exactly glue thickness is not controlled as the glue is brushed to the masked area. QA procedures needed to address this (By Georg)

The tooling controls the glue thickness. The current design requires 0 thickness glue layer, the glue will flows into the void region of the foam blocks (By Georg)

8 QA: Check the bonding quality between foam blocks and face sheet, by visual inspection, any other method? Do we need to find out how much glue are soaked into the foam? The amount of the glue used for this process can be obtained by weighing the subassembly before and after – but is this accurate enough? (By Georg)

QA issues: Check the cooling pipe is bond to the foam blocks (test method needed) Graham’s previous analysis showed a 30 mm length of pipe that is not glued would only give about a 0.7 deg-C rise in temperature. Need to make a test sample with missing glue joints along the pipe and then thermally image it, to see if this can be detected. Any thing else that need to test at this stage? (By Georg)

QA: Check cleanliness of glue areas, tooling and C-channel (By Georg)

11 QA: Check the glue bonding quality between the C channel and face sheet (by visual inspection) Check the placement position of C channels (use ruler … ) Check the glue thickness between C channel face and face sheet (this is controlled by the tooling, do we need to check it still? if so, it should be easy to measure.) Gluing C-channel (By Georg)

QA: Before machining, check the glue bonding quality between the honeycomb and lower face sheet. -- visual inspection. any other method? After machining, measure the core height (if it is necessary), using the depth gauge or other method…. Check the damage, and any sign of delamination caused by machining, i.e. the bonding between the honeycomb, foam blocks and C channels to the face sheet, to see if there is any sign of delamination caused by machining.. E.g. some small pieces of honeycomb have been snapped off during the machining (By Georg)

QA: check for gluing quality - Need a test procedure for detecting delamination both during and post production– e.g. use of finger printing technique (need to develop this) (By Georg)

Glue top face sheet Glue bath depth 0.5mm, with 1mm oversized Marking area for BN loaded glue if different glue for the cooling block area is required. Pin to locate the stave partial assembly 14

Final trimming The 10mm sacrificial rim of the face sheets along the longer edges will be trimmed off (milling) and de-burred after the stave core assembly. QA: – Trimming must reference to fiducial line – check the sign of delamination due to this process and any damage may caused. – Keep track of the weight (?)

Glue locking points NOTE: During the gluing of the locking points, the 10mm over-size region along the longer edges will be removed first, but at the both ends will remain for positioning the stave on the jig during the gluing and will be removed afterwards. 16 QA: Measure the locking point positions, straightness, and its parallelism wrt stave

QA after stave core assembly Weight: -- Take measurements at each stage of assembly Flatness scan – CMM survey. what is the required flatness for module mounting? 3- point bend test (just for development model or production models?): – to determine the bending stiffness of the structure. – Finger printing (frequency check) should be conducted after 3-point test to check for sign of delamination. Delamination – thermal image camera, pressure test or finger printing (if developed) to detect the sign of delamination. Thermal performance test – Cool the stave to -30 deg C, and then scan stave with thermal image camera. Thermal shock (for development model only)