Magnetic circuits of transformers. Magnetic circuits of transformers - assembly Obtuse layout (no-overlapping) easy assembly for small-sized transf. disadvantages:

Slides:



Advertisements
Similar presentations
Inspection & Preventive maintenance of breakers
Advertisements

Properties of cast resin transformers
Power Distribution & Utilization
Packaging Materials An overview. Main Packaging Materials  Metals  Paper and Board  Glass  Polymers This session will concentrate on the first three.
BTEC First Engineering
Machine Tools And Devices For Special Technologies Plasma machining Slovak University of Technology Faculty of Material Science and Technology in Trnava.
Windings for stators and rotors. Winding for stators – AC machines Possible types of windings: According way of insertions in holes/grooves: –axial layout.
CNG Refuelling station. A company located in Cherasco (Italy), is among the world leaders in the field of designing and manufacturing of components and.
Contactor, Relays and Overloads
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Charges Force (field) Potential (energy) What for? positive (+)
Just cause you got the monkey off your back doesn't mean the circus has left town.
Transformer Construction
Transformers and Coupled Circuits
Transformer.
MONITORING AND FAULT DIAGNOSIS OF INDUCTION MOTORS
TRANSFORMERS?. Effects of electric current An electric current that flows in a conductor has a number of effects: 1. HEATING The friction caused by the.
Cooling of power semiconductor devices
Chapter 2 Transformers.
INTRODUCTION Definition:
1 Technical requirements on electrical goods for low voltage NV č. 17/2003 Sb. Dir. 2006/95/ES General requirements General requirements Goods or documentation.
Levels of high voltage: World over the levels are classified as: LOW MEDIUM HIGH EXTRA and ULTRA HIGH Voltages However, the exact magnitude of these levels.
“PCB” -AMIT NIKAM -ASHI NAGARIYA.
Vacuum system.
- heating on at required temperature - dwell at temperature - cooling
Charges positive (+) negative (-) conservation Force (field) Potential (energy) Force between point charges Force on charge in the field Connect field.
Dry type transformers Zaragoza Aluminum vs. Copper
Production and Control of High Voltage
DIELECTRIC HEATING KUMAR CHATURVEDULA. DIELECTRIC HEATING KUMAR CHATURVEDULA Dielectric heating, also known as electronic heating, RF heating, high-frequency.
Transformer Transformer is used to increase or decrease AC Voltage (potential difference). Transformer is consisted of a soft iron core, a primary coil,
Muoviteknologia Teppo Vienamo Joints / attachments Principles of joining plastics parts Mechanical joints / attachments Adhesives Welding.
ELECTRICAL HEATING. ELECTRICAL HEATING:- Electric heating is any process in which electrical energy is converted to heat. An electric heater is an electrical.
Submitted to: Submitted by:
A Presentation On Summer Training At Bharat Heavy Electricals Limited, Haridwar.
A Presentation On Construction Of Turbo Generator
Clean area for production absolute cleanness – does not exist! cleanness is given by money, that we want (can) spend big influence of used materials –
A Presentation on construction of Turbo Generator.
The Different Types of Inductors and Their Affecting Factors
1 Product Presentation January Normal BinROXELL Bin Old feed Normal bin: ‘centerflow’ feed flows first in center  bridging ‘mass flow’ feed.
Prepared by : Nishant .A. Raval
MANUFACTURING OF TURBO GENERATORS
EVAPORATION EVAPORATION By: Dr. Tahseen Ismail By: Dr. Tahseen Ismail.
PRESENTED BY:- HATHALIYA CHIRAG DESAI NIKHIL SHAIKH PARVEZ PATEL VISHAL.
Transformer vaishnav gaurav yadav shalu
Internal Guide : Batch No : 4 Mrs.Punyavathi Madam
D.C. Machine & Transformer Topic: Instrument Transformer Electrical:-1 presented by: Jill Chauhan ( ) Chirag Agarawal ( )
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
P.1 Book E3 Section 1.3 Cooking without fire Microwave oven accident Types of cookers Check-point 7 Choosing cookers Check-point 8 1.3Cooking without fire.
MSE Pulsed Septum for g-2 and Mu2e Design Review A. Makarov 2/11/2016.
Electric Pressure Transducer
Auto Transformer Current Flow. Principles of Auto Transformers H X H0/X0.
Electromagnetism Notes-3
Electromagnetism Notes-3
HIGH VOLTAGE ENGINEERING (HVE)
Government Engineering College Rajkot
Section 6: Air-Conditioning (Heating And Humidification)
Product Presentation January 2010.
Always with appliances V= 230V
Transformer -Types & Applications
Types of transformers.
Electrical Machine-I EE 2107 Dr. Md. Sherajul Islam
المحولات Transformers
Energy Conversion and Transport George G. Karady & Keith Holbert
OIL DISTRIBUTION TRANSFORMERS OIL DISTRIBUTION TRANSFORMERS Presented By 1 Dr. Eng. Adel Abdel-Twab Farag.
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
Overview of mechanical design & construction
ALTERNATOR.
SHELL FORM TRANSFORMERS Moscow - November 2018
Electric Machine Design Course
Presentation transcript:

Magnetic circuits of transformers

Magnetic circuits of transformers - assembly Obtuse layout (no-overlapping) easy assembly for small-sized transf. disadvantages: short circuits power losses air-gap Fixing of magnetic circuits: screw (out of magnetic circuits!!!) laminate skeleton welding (only small-sized transf.) Overlapping layout hard to assembly for big-sized transf. advantages: lower power losses better magnetic properties better solidity

Cross-section of magnetic circuits: (different efficiency of filling winding) Arrangement of windings and magnetic cores: Questions to solve: 1/3 phases? HV/low-voltage? cooling?

Possible arrangement and layout of sheets

Procedure of assembly (video) 1. Creating of bases layout 2. placing of boundary sheets (plates) 3. adjustment by rulers (sliding bar) 4. placing and assembly of all sheets 5. pressing – controlling of height 6. isolation / impregnation 7. check-in of cooling channels 8. final pressing, binding 9. drying (110 °C) and final pressing (screws) 10. inspection of isolation and magnetic proper.

old design – screws today – popular is bandage with laminate strips/binding

Testing of magnetic circuits Targets/aims: isolation of sheets influence of shaving additional power-losses in assembly/binding structure (vibrations etc.) How to do this? Auxiliary windings (one loop) Measuring of local temperature After 20 min Increase after 70 min. Noise (50 Hz), vibrations Big-sized transformers: important is binding (bandaging) after each manufacturing step!

Containers for transformers Requirements: mechanical solidity (weight – tons) climatic-resistant (lifetime – years) oil-resistant (check-in important!) inner-tension less (without internal cracks, stresses etc. temperature resistivity (-30 °C  100 °C)  important is quality of welding process

Type of transformer containers smooth/plain surface – independent cooling by oil wavy surface – air-flow cooling + air fans (waves, radiators, pipe systems, harps, etc.)  testing of containers leakages - by hot oil (90°C-100°C) Other testing techniques: water based testing – not convenient, possible corrosion, compressed air/nitrogen,

Containers for Trans. Wavy surface and cross-section of container’s wall Principle of cooling channels, harps etc. Conservation = cca. 10 % of volume of container contains preservation solution or chemicals

Radiators and harps for cooling pipes of containers:

Winding of transformers (coils) Types of windings 1. Concentric (cylinder) windings „One-stage“ or „multiple-stage“ windings Desk/boards winding Other types Issues: HW/low-voltage cooling Capacity of winding (minimizing) efficiency of filling („empty window“ !!!)

Basic layouts of windings

Possible cross-section of windings

Double layer, separation by paper/plastic foil Single layer, easy to manufacture

Permutations of layers in HV winding

Arrangement of cylinder winding HV winding LW winding Magnetic core Separation between windings Rulers / bars Bracing bars Isolation cylinder

Principle of „coil-winding“ Wires are turned as a multiple beam of wires

Isolation of windings Standard operation: –isolation layer on wires (organic/an- organic), or –isolation based on position of wires (Air-gap) Over-voltage isolation: –typically atmospheric transient effects (10 -6 s) –most critical parts – input bushing –protection – based on HV rings: against discharges and used for forming of electrical field (not displayed on the picture)

Production of isolation components 1. Isolation binding/bandage: hard bandage (isolation textile material is wind-up on metal rings, cylinders etc.), soft bandage (just strips of soft textile isolation material), processing – covering with epoxy varnish/paint, dried and than: –hardening in furnaces ( °C). 2. Wedges, insertion liners, cylinders: made from glass, wood, ceramics, etc. 3. Bushings: oil-proof (also for hot oil up to 130°C) typical material – ceramics – porcelain (up to 45 kV)

Finalization of big transformers binding/bandaging – very important procedure, drying of isolation – with continuous pressing and forming of magnetic circuits, impregnation by varnish (epoxy, polyimide, polyester etc.), impregnation processed by plunging into solution, drying in vacuum: –small-sized transformers – only 1x, whole part, –big-sized transf. – only winding, 2x, –drying in temperature 130 °C for 30 hours) assembly of bottom chassis – mechanical support which serves as a carrier (bases), assembly of upper chassis – mechanical support for connections, HW bushing, outlets etc.

Testing of transformers Testing procedure follows two basic types: Piece test – on EACH device (100 %); isolation is only tested!; typical for mass production of small-sized transformers. Verifying test – more difficult; typically focused on heat transport etc.; at the beginning of production – during a development process. Important tested parameters: short and open-circuit voltage; isolation protection – 4 kV between winding and magnetic circuit (ferromagnetic core); isolation protection – 7 kV for SAFETY transformers