Tube to Foam Interface (Tim). Outline Discuss what’s known about the tube to foam interface – Describe problem – Issues – Theoretical Calculations – Anecdotal.

Slides:



Advertisements
Similar presentations
Development of super module structures at Glasgow Calum I. Torrie 20 th April 2007.
Advertisements

Mechanics/Cooling U.S. Silicon Strip Upgrade Meeting M. Gilchriese August 12, 2008.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Recent Study Topics Full length model with wafers, hybrids and cable as dead weight.
Thermally Conductive Carbon Foam Properties
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
Pixel Upgrade Local Supports Based on Thermally Conducting Carbon Foam E. Anderssen, M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman,
M. Gilchriese Update on Pixel Prototype Mechanics/Cooling Structures at LBNL February 1, 2008 M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese and.
I T i womiller VG1 Meeting UCSC November 10, 2005 ATLAS Upgrade Workshop Silicon Tracker Stave Mechanical Issues.
Recent Mechanical Barrel Stave Development BNL; S. Duffin, A. Gordeev, D. Lynn, G. Mahler: LBNL; C. Haber, M. Gilchriese: Yale; W. Emmett, A. Martin, P.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Material calculation of petal core variants Sergio Díez Cornell with input from many people CERN AUW, 3 rd Nov 2014.
M. Gilchriese Integrated Stave Mechanics/Cooling Backup ATLAS Upgrade Workshop Valencia December 2007 M. Cepeda, S. Dardin, M. Gilchriese, C. Haber and.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
Raw Material & Sub-Assembly QA (Tim) 25/09/14 25/09/2014Material & Sub-assembly QA1.
Calorimeter Analysis Tasks, July 2014 Revision B January 22, 2015.
M. Gilchriese Integrated Stave Mechanics/Cooling June 5, 2008 CERN.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
M. Gilchriese SLHC Pixel Local Supports Based on Thermally Conducting Carbon Foam E. Anderssen, M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese,
LHC Phase II Collimator Compact jaw simulations New FLUKA => ANSYS mapping scheme New 136mm x 950mm jaw –60cm primary collimator –Helical cooling channel.
Thermally Conductive Carbon Foam Properties M. Gilchriese, M. Cepeda - LBNL W. Miller, W. Shih, R. Ramirez-Allcomp.
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
Ideas for LC mechanics (we will work on sensors as well – particular CMOS)
WP4 – Plans for next 6 months
Mechanical and Thermal Management for ATLAS Upgrade Silicon Tracking System W. O. Miller (iTi) Carl Haber (LBNL), Gil Gilchriese (LBNL) Carl Haber (LBNL),
BTeV Pixel Substrate C. M. Lei November Design Spec. Exposed to >10 Mrad Radiation Exposed to Operational Temp about –15C Under Ultra-high Vacuum,
Thermal & Mechanical Support for Diamond Pixel Modules Justin Albert Univ. of Victoria Nov. 6, 2008 ATLAS Tracker Upgrade Workshop.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
BNL & Yale Mechanical Stave Developments BNL: David Lynn, Marc-Andre Pleier, Anatoli Gordeev, Russ Burns, Ken Sexton Yale: Paul Tipton, Will Emmet, Tom.
Plank #7 and beyond. 2 What was new for plank#7? Carbon-fibre jig Oversize (by 10mm) facesheets during stave core build –Facesheets now at the very limit.
W.O. Miller i T i VG 1 Two Pixel Configurations Under Study First: A Monolithic Integrated Structure First: A Monolithic Integrated Structure –Axial array.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
Materials R. Bates. Contents What we said that we would do What we have done – What is left to do from original list New things to add.
12/3/2015R. Mountain, Syracuse University LHCb CO2 Cooling EDR2.
Pixel Upgrade Carbon Foam and Outer Stave Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, T. Johnson, J. Silber Lawrence Berkelely National.
Stave Core Thermo-mechanical and Electrical Performance Requirements (Tim) 10/07/2013Liverpool WP4 Meeting (11/7/13)1.
Thermal Model of Pixel Blade Conceptual Design C. M. Lei 11/20/08.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
Stave production.
UNIT-01. SIMPLE STRESSES & STRAINS Lecture Number - 06 Prof. S.C.SADDU MECHANICAL DEPARTMENT SIT LONAVALA Strength of Materials.
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
Some Comments on the Use of CGL for the Foam-Pipe Interface 1 D. Lynn (BNL), LBNL Mechanical Meeting, Sep 2012 We have been using CGL exclusively in the.
WP4 Liverpool 21 June 2012 Graham Beck 1 Summary/Update of Steady State FEA: Perfect Plank and Plank with a small fault. New: Simulation of Transient behaviour.
1 2S Module meeting, 24 September 2012 S tudies on module support inserts Refers to work by Riikka Häsä, Helsinki Institute of Physics, summer student.
Stave Tooling & Plans for Future Stave-building (Tim)
Stave Core Electrical Considerations Ned Spencer (UCSC), Sergio Diez (DESY), David Lynn (BNL) Local Support Assembly, AUW Nov
Module Radiation Length. Goals Estimate the expected radiation length of a module, based on the design and measurements on as-built modules Determine.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
(Tim Jones).  Who am I? ATLAS-UK Tracker Upgrade work-package leader for WP4 (Mechanics)  Materials, Cooling, Stave Core Assembly, Module Mounting,
Experiences and Issues with Carbon Foam at BNL & Yale BNL: David Lynn, Marc-Andre Pleier, Anatoli Gordeev, Russ Burns, Ken Sexton Yale: Paul Tipton, Will.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Strip Stave Status & Plans at Yale Yale: Paul Tipton, Will Emmet, Tom Hurteau.
Graham Beck (QMUL) LBNL Sept Berlin, March 2013: FEA of Side-Mounted Card + Straight Cooling Pipe (not wiggled through SMC region): For adequate.
Summary LBNL LSWG meeting
Strip Petals: Local supports and prototype tests
Summary of activities for LHC-b vacuum chamber supports
Are there better ways to build a stave?
A comparison of Some Properties of Sandwich Test Tokens with Various Core Materials (Tim)
Studies of Quad Pixel Module assembly using paper laminate
Material Studies for HL-LHC Strip Stave Design
Materials R. Bates et al..
CF testing pipe & testing plan
Presentation transcript:

Tube to Foam Interface (Tim)

Outline Discuss what’s known about the tube to foam interface – Describe problem – Issues – Theoretical Calculations – Anecdotal Experience 30/05/20122Tube to Foam Interface

Problem Heat Flow – The heat generated within the active components on a stave is removed through evaporating CO2 in small- bore tubes. – The heat is conducted from the facesheets to the tube via thermally-conducting carbon foam and two interfaces made using thermally-conducting adhesive. Geometry – Tubes (S/steel so far) 1/8” (3.175mm) OD x (0.50, 0.25, 0.22mm wall) – For the future 2.2mm OD x 0.14mm wall (ABCN130) – Thermally-conducting Foam Strip-staves: Two 10mm wide ‘bars’ Pixels:Full width ‘slabs’ Materials – Tubes 316L / 304L stainless steel (current staves & stavelets) CP2 titanium (only used in UK ‘nearly glue-less’ stavelet – Thermally-conducting foam Pocofoam Allcomp foam – Tube-to-foam adhesives CGL (compliant) Hysol EA9396 (30% BN by wt) (rigid) 30/05/20123Tube to Foam Interface

Issues / Concerns Thermal Performance – Is the thermal impedance of the tube-foam interface good enough to mitigate against thermal runaway Stave Mechanical Stability – Are the temperature-induced stave deformations (and associated stresses) small enough (stable enough) to ensure good tracking performance. Longevity – Will the thermal impedance of the joint deteriorate over time? – Could stresses induce creep 30/05/20124Tube to Foam Interface

Comparison Compliant Adhesive Could the adhesive ‘slump’? i.e. separate out under – Gravity – Capillary flow Could the adhesive ‘migrate’ away from the interface? – Closed Cell foams – Open Cell foams Could the adhesive become less compliant? – Irradiation induced ‘curing’ may produce a ‘rigid’ joint over time. Rigid Adhesive Could thermally-induced stresses lead to:- – Large dimensional changes – High stresses which might promote cracking & ultimate failure of thermal path Could the need to accommodate dimensional changes complicate stave mounting? – Fixations in Z – Mounting brackets What are the effects of long- term creep? 30/05/20125Tube to Foam Interface

Open and Closed-cell Foams Allcomp Foam – Open structure from low density (0.05g/cc) open cell foam – ppi (0.25mm) Pocofoam – Closed cell structure with voids typically 0.5mm diameter – Voids volume equivalent to 0.22mm thick glue layer 30/05/20126Tube to Foam Interface

Thermal Properties Second largest impact (after fluid htc) Doubling the thermal impedance of the foam glue reduces the coolant temperature headroom by 2⁰C (≈ 10%) 30/05/20127Tube to Foam Interface

Stave CTE Assuming Rigid Foam & Rigid Glue Simple 1D model (Classical Laminate Theory) – 2 Face sheets (all 0/90/0) K13D2U / RS-3[80gsm/29%RC] K13C2U / EX-1515[100gsm/40%RC] K13C2U / EX-1515[45gsm/40%RC] – 2 Cooling tubes S/Steel:3.185mm OD x 0.22mm wall (x2) Effective thickness 0.037mm Titanium:2.2mm OD x 0.14mm wall (x2) Effective thickness 0.017mm – 2 Bus Tapes 0.025mm Kapton cover-layer 0.025mm / 0.05mm Aluminium screen 0.100mm Kapton 30/05/20128Tube to Foam Interface

Stave CTE Assuming Rigid Foam & Rigid Glue Bare Facesheets + S/S Tube Facesheets + Ti Tube Facesheets + Tape (50) Facesheets + Tape (25) Facesheets + Tape(50) + S/S Tube Facesheets + Tape(50) + Ti Tube Facesheets + Tape(25) + S/S Tube Facesheets + Tape(25) + Ti Tube 30/05/20129Tube to Foam Interface

Historical Data Jones (2009) – Crude measurement of relative CTE of CLG & Rigid epoxy – Measurement of thermal performance vs Thermal cycling (15 cycles) Sutcliffe (2010) – Stavelet FEA LBNL (2010) – Thermal Cycling of 12cm rigid-glued prototypes 30/05/201210Tube to Foam Interface

Jones2009 Clip-type extensometer 30cm prototypes – CGL – ER2074 (rigid epoxy) Zero thickness glue line 0.1mm glue line Cool down to -40C and allow to rise back to room temperature 30/05/201211Tube to Foam Interface % strainCTE (ppm) ER2074(0.0) ER2074(0.0) ER2074(0.1) CGL

Jones cm single-tube prototypes – Equivalent thermal performance for CGL and rigid epoxy – Thermal cycling shows no deterioration of average temperature above cooling tube at -40⁰C 30/05/201212Tube to Foam Interface

Sutcliffe (2010) Standard UK build – 0/90/0 K13D2U/RS3 (80gsm,29%RC) – 1/8” s/steel tubes CTEs – No Al screen 0.02mm contraction CTE = 1e-6 – 0.05mm Al screen 0.042mm contraction CTE = 2e-6 30/05/201213Tube to Foam Interface

Critical Stresses Foam stress (likely) to cause failure – but structures survive! Two explanations – Glue bridging between facesheet and tube – Simple FEA assumes linear material properties but materials testing reveals otherwise UK Stave core design employs end close- outs to protect foam 30/05/201214Tube to Foam Interface

Mechanical Materials Measurements Pocofoam has different properties in orthogonal directions and a failure stress of typically 0.8MPa Allcomp (K9) – 130ppi has uniform characteristics and failure stress >2.5MPa Failure Tensile loading of foam Unloading of foam Strain Stress (MPa) 30/05/201215Tube to Foam Interface

LBNL (2010) Construction – Length 12cm – Hysol 9396/BN(30% by weight) to bond tube & facings to foam – K7 foam – One SS tube(2.8mm OD) – One Ti tube(2.2 mm OD) Thermal cycle and irradiation(time sequence) – 900 cycles (20C -35C) then – 1 cycle to -70C then – 1 cycle to about -175C with LN2 then – Irradiation to 50 MRad, then to 150 Mrad total No change in Thermal performance – No difference in SS and Ti tubes (with given ID/OD). Not a surprise (from FEA). – No significant change in thermal performance for any sample after any thermal cycle sequence, including LN2 – Effect of irradiation up to 1 GRad is <10% increase in  T. – Thermal performance with K9 foam is significantly better than with K7 foam, by about 25% 1630/05/2012Tube to Foam Interface

30/05/201217Tube to Foam Interface

30/05/201218Tube to Foam Interface

Stave 1.3m x 0.12cm 0/90/0 250 um thick K13D2U facings, gsm pre-preg CGL around s/steel pipe, Allcomp foam LBNL/BNL (2012) Stave 1.2m x 0.12m Co-cured facings, low density 45 gsm cf pre-preg. 0/90/0 370 um thick K13C2U + bus facings CGL around steel pipe, Allcomp foam 30/05/201219Tube to Foam Interface

Stave stiffness independent of temperature (simple support 120 cm apart) Comparison of Stave Stiffness, Room Temp and Chilled Stave is about 10% stiffer when chilled with -30 deg-C coolant. Bus cable glue layers responsible??? (simple support 120 cm apart) 30/05/201220Tube to Foam Interface

Co-cure stave contraction 30/05/201221Tube to Foam Interface

1.3 m stave and 1.2 m co-cure stave contraction Stave Contractions – 1.2m co-cure stave contracts 0.2mm CLT predicts 0.118mm assuming completely free tube NB Stave is held together with 2 x 15g of Hysol – equivalent to 0.082mm thickness spread over stave area – 1.3 m stave expands ~ um CLT predicts 0.040mm assuming completely free tube Similar glue mass / thickness Tube Length Changes – Pipe moves into co-cure stave ~ 100 um, into 1.3 m stave ~ 160 um – Free stainless steel pipe should contract ~ 1mm when cooled ~ 50 deg-C – Question is: does pipe really contract 1 mm? If so, see analysis of 1.3 m stave on next slide 30/05/201222Tube to Foam Interface

1.3 m stave contraction analysis But we expected pipe to be mostly fixed at U-bend 30/05/201223Tube to Foam Interface

Summary & Conclusions Stresses in staves come from – Bus tapes (primarily the aluminium screen) – Core assembly adhesive – Cooling tubes (if assembled with rigid epoxy) Evolving stave design reduces potential stresses – Smaller bore tubes (ABCN130) – Titanium (Progress in joining technology) – Bus-tape screen (0.05mm -> 0.025mm -> ‘0’ ?) CGL – Experience since 2008 Many staves built showing good thermo-mechanical performance – Concerns about migration into foam structure addressed by lining channel with rigid epoxy – Reliance on ‘sliding’ properties over long service life in high radiation environment – Some evidence that tube is not completely ‘free’ Rigid Adhesive (Hysol9396/30%BN) – Experience since 2009 – Thermal cycling (tens to many hundreds) No failures for ‘nominal’ cycling (Room temp to -40C) – FEA shows stresses in all components (in particular the foam) have large safety margins for ‘nominal’ excursions and indicate that structures will survive large (160C) excursions. 30/05/201224Tube to Foam Interface