BPT2423 – STATISTICAL PROCESS CONTROL.  Estimation of Population σ from Sample Data  Control Limits versus Specification Limits  The 6σ Spread versus.

Slides:



Advertisements
Similar presentations
Control Charts for Variables
Advertisements

Chapter 9A Process Capability and Statistical Quality Control
BMM 3633 Industrial Engineering
Quality Management 09. lecture Statistical process control.
BPT2423 – STATISTICAL PROCESS CONTROL
VIII Measure - Capability and Measurement
ISQA 572/ 449 Models for Quality Control/ Process Control and Improvement Dr. David Raffo Tel: , Fax:
Chapter 5a Process Capability This chapter introduces the topic of process capability studies. The theory behind process capability and the calculation.
Agenda Review homework Lecture/discussion Week 10 assignment
Chapter 18 Introduction to Quality
Chapter 10 Quality Control McGraw-Hill/Irwin
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
1 © The McGraw-Hill Companies, Inc., 2004 Technical Note 7 Process Capability and Statistical Quality Control.
CHAPTER 8TN Process Capability and Statistical Quality Control
The Quality Improvement Model
Statistical Process Control
Control Charts for Variables
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
Process Capability.
Process Capability What it is
INT 506/706: Total Quality Management Lec #6, Process Capability.
X-bar and R Control Charts
Chapter 6 – Part 4 Process Capability.
Statistical Process Control
Statistical Process Control (SPC)
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Quality Control Chapter 5- Control Charts for Variables
Statistical Applications in Quality and Productivity Management Sections 1 – 8. Skip 5.
Process Capability Process capability For Variables
 Review homework Problems: Chapter 5 - 2, 8, 18, 19 and control chart handout  Process capability  Other variable control charts  Week 11 Assignment.
Statistical Process Control (SPC) Chapter 6. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Capacity, Facilities, & Work Design.
Variables Control Chart Chapter 10. Variables Control Chart Dr. Walter Shewhart ( ) –Father of Statistical Process Control –Inventor of Control.
1 LECTURE 6 Process Measurement Business Process Improvement 2010.
Statistical Process Control (SPC)
 Review homework Problems: Chapter 5 - 2, 8, 18, 19 and control chart handout  Process capability  Other variable control charts  Week 11 Assignment.
1 MARKETING RESEARCH Week 5 Session A IBMS Term 2,
Chapter 6. Control Charts for Variables. Subgroup Data with Unknown  and 
Chapter 4 Control Charts for Measurements with Subgrouping (for One Variable)
Chapter 23 Process Capability. Objectives Define, select, and calculate process capability. Define, select, and calculate process performance.
Reid & Sanders, Operations Management © Wiley 2002 Statistical Quality Control 6 C H A P T E R.
Statistical Process Control04/03/961 What is Variation? Less Variation = Higher Quality.
Statistical Quality Control
ENGM 620: Quality Management Session 8 – 30 October 2012 Process Capability.
1 Slides used in class may be different from slides in student pack Technical Note 8 Process Capability and Statistical Quality Control  Process Variation.
Chapter 8. Process and Measurement System Capability Analysis
Statistical Quality Control in Textiles
Chapter 36 Quality Engineering (Part 1) (Review) EIN 3390 Manufacturing Processes Fall, 2010.
Chapter 16 Introduction to Quality ©. Some Benefits of Utilizing Statistical Quality Methods Increased Productivity Increased Sales Increased Profits.
1 Chapter 14 StatisticalProcessControl The Management & Control of Quality, 7e.
OPSM301 Operations Management Spring 2012
Process Capability What it is
Tech 31: Unit 3 Control Charts for Variables
Chapter 5a Process Capability
Chapter 7 Process Control.
36.1 Introduction Objective of Quality Engineering:
Agenda Review homework Lecture/discussion Week 10 assignment
Specification Limits, Tolerances
Higher National Certificate in Engineering
CHAPTER 6 Control Charts for Variables
DSQR Training Process Capability & Performance
Process Capability Process capability For Variables
Chapter 6 Revised Homework Problems 6, 8, 10, 21.
Basic Training for Statistical Process Control
Basic Training for Statistical Process Control
Process Capability.
Control chart (Ex 3-2) Subgroup No. Measurement Average Range Date
Individual values VS Averages
Process Capability What it is
Presumptions Subgroups (samples) of data are formed.
Presentation transcript:

BPT2423 – STATISTICAL PROCESS CONTROL

 Estimation of Population σ from Sample Data  Control Limits versus Specification Limits  The 6σ Spread versus Specification Limits  Calculating Process Capability Indices

 Understand the difference between specification limits and control limits  Learn to calculate and interpret the process capability indices: C p, C r and C pk

 Process capability refers to the ability of a process to produce products or provide services capable of meeting the specifications set by the customer or designer  Knowing the process capability gives insight into whether or not the process will be able to meet future demands place on it  Determining the process capability aids industry in meeting their customer demands – a customer may ask for part tolerances so fine that the machines are not capable of producing to that level of exactness  An undersized part A may not mate correctly with an oversized part B

 Sample values and their averages provide insight into the behavior of an entire population  ẋ becomes a more reliable estimate of µ as the sample size is increased  If the process can be assumed to be normal, the population standard deviation can be estimated from either the standard deviation associated with the sample standard deviation (s) or the range (R) :

 It is important to note that a process in statistical control will not necessarily meet specifications as established by the customer  There is a difference between a process conforming to specifications and a process performing within statistical control  Specifications communicate what the customers expect, want or need from the process – considered the voice of the customer  Control limits are the voice of the process – a prediction of the variation that the process will exhibit in the near future  Difference : specifications relay wishes and control limits tell of reality

The spread of the individuals in a process, 6σ, is the measure used to compare the realities of production with the desires of the customers Case I : 6σ < USL - LSL This allows for more room for process shifts while staying within the specifications. Notice that even if the process drifts out of control, the change must be dramatic before the parts are considered out of specification.

Case II : 6σ = USL - LSL Case III : 6σ > USL - LSL A shift in the process mean or an increase in the variation present in the process will creates an out of specification situation Process is incapable of meeting the specification set by the customer. To correct this problem, management intervention will be necessary. The capability of the process cannot be improved without changing the existing process

Capability Index, C p Cp > 1.00 : Case I situation exists. The greater this value, the better Cp = 1.00 : Case II situation exists. This is not optimal, but it is feasible Cp < 1.00 : Case III situation exists. Value of less than 1 are undesirable and reflect the process’s inability to meet the specification

Capability Ratio, C r Cr < 1.00 : Case I Cr = 1.00 : Case II Cr > 1.00 : Case III Centering of the Process, C pk Where Z (min) is the smaller of :

C pk = negative number C pk = zero C pk = between 0 and 1 C pk = 1 C pk > 1 Note : C pk is the ratio that reflects how the process is performing in relation to a nominal, center or target value.

1. When C p has a value of 1.0 or greater, the process is producing product capable of meeting specifications 2. The C p value does not reflect process centering 3. When the process is centered C p = C pk 4. C pk is always less than or equal to C p 5. When C p is greater than or equal to 1.0 and C pk has a value of 1.00 or more, it indicates the process is producing product that conforms to specifications 6. When C pk has a value less than 1.00, it indicates the process is producing product that does not conform to specifications 7. A C p value of less than 1.00 indicates that the process is not capable 8. A C pk value of zero indicates the process average is equal to one of the specification limits 9. A negative C pk value indicates that the average is outside the specification limits

Hotels use statistical information and control charts to track their performance on a variety of indicators. Recently a hotel manager has been asked whether or not his team is capable of maintaining scores between 8 and 10 (on a scale of 1 to 10) for “overall cleanliness of room”. The most recent data has a mean of 8.624, a standard deviation of and n = 10. calculate and interpret C p and C pk

State of Process Control  A process is considered to be in a state of control or under control when the performance of the process falls within the statistically calculated control limits and exhibits only chance / common causes  When a process is under control, it is considered stable and the amount of future variation is predictable  Several benefits to a stable process:  There is a rational basis for planning  Quality levels are predictable  When improvements are made, the effects of the changes can be determined quickly and reliably

Control Chart Interpretation  Correct interpretation of control charts is essential to managing a process  Understanding the sources and potential causes of variation is critical to good management decisions  Misinterpretation can lead to a variety of losses, including:  Blaming people for problems that they cannot control  Spending time and money looking for problems that do not exist  Spending time and money on process adjustments or new equipment that are not necessary  Taking action where no action is warranted

 There are two circumstances under which the control chart is revised and new limits calculated  If a charts exhibits good control and any changes made to improve the process are permanent  When the new operating conditions become routine and no out-of-control signals have been seen  The revisions provide a better estimate of the population standard deviation – a better understanding of the entire process can be gained  Control limits are also revised if pattern exist – provided that the patterns have been identified and eliminated  The new limits will reflect the changes and improvements made to the process – used to judge the process behavior in the future

Steps taken to revise the charts: 1. Interpret the original chart 2. Isolate the cause 3. Take corrective action 4. Revise the chart  It is necessary to remove any undesirable points or groups of points, the causes of which have been determined and corrected  If no cause can be found and corrected, then the points cannot be removed from the chart  The points removed will equal zero and the calculations will continue from there