Chapter 22 (p ) CH EN 4253 Terry A. Ring

Slides:



Advertisements
Similar presentations
Heat Transfer to Solids in a Flowing Fluid
Advertisements

INTRODUCTION TO PRESSURE VESSELS
Member, Mapua Alumni Association Alberta Chapter RAY ALVARADO, P.E. MECHANICAL ENGINEERING.
Piping and Instrument Diagrams
EQUIPMENT CALCULATIONS SELECTION & SIZING. DETAIL REQUIRED FOR A PROJECT COMPONENTS NEEDED FOR EVALUATION M & E BALANCE DATA EQUIPMENT COSTS OPERATING.
Capital Cost Estimation
Drums, Vessels, & Storage Tanks Design Considerations.
Blue-OX Energy Management TJ Chancellor Paul Cole Sara Habib Mira Kim Claudio Ramos Vicente Rosas.
Pumps, Compressors, Fans, Ejectors and Expanders
PUMPS AND GAS-MOVING EQUIPMENT
Rotating Equipment PUMPS.
Kathryn Knopinski Kara Shelden Kim Fink Justin Sneed Mark Shreve
EPOH Inc. Consultants: Hope Baumgarner Tyler Gibson Wes Hudkins Joseph Nick Josh Stephens.
POWER PLANT TECHNOLOGY INTRODUCTION AND OVERVIEW Prof. Anand Bhatt.
MER Design of Thermal Fluid Systems Pumps and Fans Professor Anderson Spring Term
Supervised by : Dr. mohammad fahim Eng. Yousef ali Yaqoub bader ali.
Pressure Vessels.
CHAPTER 4 CPB 20004: Plant Utility n Maintenance
Cyclohexane Production Unit
Equipment Sizing Preliminary Equipment Sizing for Capital Cost Estimation.
Crimson Consulting Cyclohexane Production Facility Analysis and Design.
Mechanical Design Of Process Equipment.
College of Engineering & Petroleum Depatment of Chemical Engineering
PROPLEM DIFINITION Heat exchanger is a device used to transfer heat from a fluid (liquid or gas) to another fluid where the two fluids are physically.
Section 1 Dr.Hoda’s part Sheet 1: Calculating equipment cost Eng. Reda Zein.
Propylene Oxide Production by ARCO Process Done By Fiasal Juhail.
Pumps and Lift Stations. Background Fluid Moving Equipment Fluids are moved through flow systems using pumps, fans, blowers, and compressors. Such devices.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
Solar Chimney Power Plant
For Sell and tube heat exchanger, pump, compressor and valve. Designed by:- Lulwa H. Hamada EQUIPMENT DESIGN.
FE Exam Preparation Design
CE 230-Engineering Fluid Mechanics Week 1 Introduction.
Propylene Production from
Final Exam Review This Powerpoint is a list of what we covered in Design I. Anything from this coverage may be on your final exam. (Obviously, I will emphasize.
Designer: Khaled Aldhaferi Supervised by: Prof.M.Fahim ENG: Yousif Ismail PROPYLEN OXIDE CO-PRODUCTION WITH t-BUTYL ALCOHOL BY THE TEXACO HYDROPEROXIDATION.
Process Design CEN 574 Spring 2004
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
Detailed Equipment Design
Team Yellow. Experiment 3 IRI Economics FCI and Annual Costs FCI is $4.63 million Annual product cost is $104 million Annual cash flow is -$77 million.
Equipment Design Designed by Eman A. Khajah. Outline Design of Heater. Design of Stripper.
Supervised by: Prof. Mohamed Fahim Eng. Yusuf Ismail Done by: Mutlaq Al_Shammari.
Costing of Pressure Vessels 1. Quick Method: simple cylindrical vessels 2. Costing by Weight: more complex shapes.
Costs in Ulrich: Scaled to CE Plant Cost Index = 315 (mid 1982)
Done by: Zainab Al-fadhli Supervised by: Prof: M.Fahim Eng : Yusuf Ismail Kuwait university Engineering and Petroleum college Chemical Engineering Department.
Gas Movers and Compressors Fans Centrifugal blowers and compressors Rotary blowers and compressors Reciprocating compressors Ejectors Discharge pressure.
Last Week of Project Terry A. Ring. Project Schedule.
Equipment Costing T&S - Chapter 7 Review CH EN 5253 Terry A. Ring.
About company Kurgankhimmash is the leading Russian company manufacturing process equipment for oil & gas producing, oil & gas refining, chemical, energy,
Tower Design in ProMax ChEN 4253 Design II Chapter 19 S,S&L Terry A. Ring University of Utah.
Welcome! Drafting 2323: Pipe Drafting Andrew Amini Full Time Instructor, HCC.
FLOW CHART OF INDUSTRIAL PROCESSING
RIVERA, ALYSSA A. 5ChE-C. Evaporation..  Evaporation is basically a separation step which uses heat transfer to separate products presenting differences.
CHE441 Lecture: Tank & Vessel. Introduction of Vessel Applications of Vessels:  (1) as a liquid surge drum for liquid storage  (2) as a vapor/liquid.
Chapter 22 (p ) CH EN 4253 Terry A. Ring
BSB Biomanufacturing CHAPTER 2 Process Plant Design – Part III
GOVERNMENT ENGINEERING COLLEGE, BHAVNAGAR TOPIC : INTRODUCTION TO PRESSURE VESSELS Prepared By :- 1.Aal Akash Ansari Aarif.
Costing and Project Evaluation
Natural Gas Processing Plant
INTRODUCTION TO PRESSURE VESSELS
Introduction to Chemical Process Design
Equipment Costing CAPEX
Estimating Capital Costs
Chemical Process Diagrams
Terry A. Ring Chemical Engineering University of Utah
ChEN 5253 Design II Chapter 13 Terry A. Ring University of Utah
Total Cost of Plant Purchased cost – equipment f.o.b.
CHPE308 Engineering Economy Estimation Of Capital Cost
CHPE404 Engineering Economy Estimation Of Capital Cost
CHPE308 Chapter Seven (Textbook) Estimation Of Capital Cost
Presentation transcript:

Chapter 22 (p558-597) CH EN 4253 Terry A. Ring Equipment Costing Chapter 22 (p558-597) CH EN 4253 Terry A. Ring

6/10th scale up/down Factor Used for scaling the total capital cost for a chemical plant of a different size Cost2/Cost1 = (Capacity2/Capacity1)0.6 Accounts for economy-of-scale

Accounting for Inflation Cost to purchase = Base Cost*(I/Ibase) Base Cost, CB, = Historical price at Ibase I is a Cost Index at present time Chemical Engineering, CE, Plant Cost Index Marshall and Swift (MS) Equipment Cost Index Nelson-Farrar (NF) Refinery Construction Cost Index Engineering News-Record (ENR) Construction Cost Index Cp(I) = Cp(Ibase)*(I/Ibase) Cp(Ibase)=FT*Fm*Cbase(Ibase)

Cost Estimate Methods Order of Magnitude Estimate Method of Hill Marshall Swift for I/Ibase Six Tenths Rule for Production Capacity CTCI-2 (I)=CTCI-1 (Ibase)*(I/Ibase)* (Capacity2/Capacity1)0.6 Study Estimate (±35%) Method of Lang CTCI=1.05*fL-TCI ∑ (Ii/Ibase-i) Cp-i Lang factors for different types of Plants Solids -3.10, Solids&Fluids 3.62, Fluids 4.73 Sum over all major equipment Preliminary Estimate (±20%) Method of Guthrie Bare module cost, CBM= Cp-base(I/Ibase)[FBM+(FdFpFm-1)] d= design factor, p = pressure factor, m =materials factor CTCI= ∑ CBM_i Quote Estimate

Purchase Costs for Equipment Size Factor, S, depends on type of equipment Cp(Ibase)=A*(S)b Cp(Ibase)=exp(Ao+A1[lnS]+A2[lnS]2+…) Your book gives 2006 base costs Ibase = 500 (2006) average

Pumps & Electric Motors Pump Types (Centrifugal, Gear, Plunger) Centrifugal Pump Size factor, S=Q(Head)0.5 Base Cost, CB=exp(9.2951- 0.6019[ln(S)] +0.0519[ln(S)]2) Cp=FTFMatCB Fm materials factor see Table 22.21 FT pump type factor see Table 22.20 Other types of pumps have different CB formulas Electric Motor to drive pump Size Factor=Power consumption, PC=PT/ηp/ηM=PB/ηM=QHρ/(33,000ηpηM) Q= flow rate, H = head, ρ = density Efficiencies (pump and motor) are a function of flow rate and break horsepower (power without any losses), respectively CB=exp{5.4866+0.013141[ln(PC)]+0.053255 [ln(PC)]2 +0.028628 [ln(PC)]3-0.0035549[ln(PC)]4} Cp=FTCB FT= motor types factor see Table 22.22 ηM=~90% Installation, etc, FBM=3.3 CBM=FBM*∑CP

Fans Fan Motor size by PC=QHt(in. water)/(6,350 ηFηM) Sizing factor is the volumetric flow rate, Q Different CB formula for different types of fans CP=FHFM CB FH Head factor see Table 22.24 FM material of construction factor Fiberglass 1.8 Stainless steel 2.5 Nickel Alloy 5.0 Motor size by PC=QHt(in. water)/(6,350 ηFηM) ηM =~90%, FBM = 2.15 CBM=FBM*∑CP

Blowers Sizing factor is the power consumption, PC Centrifugal (turbo) Blower CB=exp{6.6547+0.7900[ln(Pc)]} CP=Fm-fansCB Motor Motor size by PC=QHt(in. water)/(6,350 ηFηM) ηM =90% , FBM = 2.15 CBM=FBM*∑CP

Compressors Compressor types Centrifugal, CB=exp{7.2223+0.80[ln(PC)]} Reciprocating, CB=exp{7.6084+0.80[ln(PC)]} Screw, CB=exp{7.7661+0.7243[ln(PC)]} Size factor is the power consumed, PC=PB/ηC CP=FDriveFMatCB FDrive =1 (electric motor), 1.15 (steam), 1.25 (gas turbine) FMat = 1.0 Carbon steel, 2.5 SS, 5.0 Nickel Alloy CBM=FBM*∑CP FBM = 2.15

Heat Exchangers Types of Heat exchangers Size Factor is HX area, A Floating, CB=exp{11.667-0.8709[ln(A)]+0.09005[ln(A)]2} Fixed Head, CB=exp{11.0545-0.9228[ln(A)]+0.09861[ln(A)]2} U-tube, CB=exp{11.147-0.9186[ln(A)]+0.09790[ln(A)]2} Kettle, CB=exp{11.967-0.8709[ln(A)]+0.09005[ln(A)]2} Thermosiphon, CB= Double pipe, CB=exp{7.1248-0.16[ln(A)]} Size Factor is HX area, A CP=FpFMatFLCB Pressure Factor, Fp= 0.9803+0.018(P(psig)/100)+0.0017(P(psig)/100)2 Not for double pipe Materials Factor, Fmat=a+(A/100)b, a & b from Table 22.25 a≥1.0 note error in first row of Table 22.5 Tube Length Factor FL= 1.25 for 8 ft, 1.0 for 20 ft. on a sliding scale CBM = FBM*CP, FBM=3.17 (S&T), 1.80 (DP), 2.17 (Fin/Fan)

Fired Heaters Size Factor is the heat duty, Q CB=exp{0.08505+0.766[ln(Q)]} CP=FPFMatCB FP=0.986-0.0035(P(psig)\500)+0.0175(P/500)2 Fmat=1.4 Cr-Mo alloy steel, 1.7 for stainless steel CBM = FBM*CP, FBM=2.19

Pressure Vessels Storage Tanks Distillation Towers Absorber Towers Tray Packed Absorber Towers Stripping Towers

Pressure Vessels Sizing Factor is the weight of steel, W Horizontal Vessels, 1,000<W<920,00 lb CB=exp{8.717-0.2330[ln(W)]+0.4333[ln(W)]2} Vertical Vessels, 4,200<W<1,000,00 lb CB=exp{6.775-0.18255[ln(W)]+0.02297[ln(W)]2} Add Platform Costs, Horizontal, 3<Di<12 ft CPL=1580(Di)0.20294 Vertical, 3<Di<21 ft CPL=258.1(Di)0.7396(L)0.70684 Weight, W=π(Di+ts)(L+0.8Di)tsρs C=FMCB+CPL FM= materials factor see Table 22.26 Installation, etc, FBM=4.16 (V), 3.05 (H) CBM=FBM*∑CP

Hoop Stress Calc for thickness, ts Design Pressure is function of operating pressure, Po For Po> 1,000psig use Pd=1.1Po For Po< 1,000psig but not for vacuum Pd=exp{0.60608+0.91615[ln(Po)]+0.0015655[ln(Po)]2} Thickness (Hoop Stress Calculation) ts= PdDi/(2SE-1.2 Pd) S = max allowable stress for steel is f(T) E = weld efficiency (fraction) Minimum wall thickness for given diameters May add extra thickness for wind stresses, corrosion Different calculation for vacuum vessels Also account for leakage when vacuum vessel is used

Distillation Towers Pressure vessel with plates or packing and additional nozzles and manholes Tray Cost CT=NTFNTFTTFTMCBT NT= no. trays FNT= 1 for NT>20 otherwise FNT=2.25/(1.0414NT) FTT = tray type, 1.0 sieve, 1.87 bubble cap FTM= Materials, f(D) Carbon Steel FTM=1.0 316 SS FTM=1.401+0.0788 Di Installation, etc, FBM=4.16 CBM=FBM*∑CP

Packed Distillation Column Pressure vessel with platforms plus packing Packing Cost basis is volume of packing, VP C=VpCPK+CDR CPK= is installed cost per unit volume Distributors cost, CDR

Absorbers/Strippers Pressure Vessel plus platforms and packing Separate costs for blowers Separate costs for motors

Other process equipment Different sizing factors Different basis cost equations Same methods used for cost calculation

Other Process Equipment Various Size Factors Table 22.32