Midterm Review 28-29/05/2015 Peter NOVOTNY Early Stage Researcher 3.2, Work Package 3.

Slides:



Advertisements
Similar presentations
Time & Frequency Products R. Peřestý, J. Kraus, SWRM 4 th Data Quality Workshop 2-5 December 2014 GFZ Potsdam Recent results on ACC Data Processing 1 SWARM.
Advertisements

Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Silvia Zorzetti. PACMAN CLICScientific ProjectThe Team PACMAN (Particle Accelerator Components Metrology and Alignment to the Nanometer Scale) Ph.D. training.
1 Sixth Lecture Types of Transducers and Their Applications Instrumentation and Product Testing.
Takanori Sekiguchi Italy-Japan Workshop (19 April, 2013) Inverted Pendulum Control for KAGRA Seismic Attenuation System 1 D2, Institute for Cosmic Ray.
Seismic sensors in PACMAN
Benoit BOLZON Nanobeam 2005 – Kyoto Active mechanical stabilisation LAViSta Laboratories in Annecy working on Vibration Stabilisation Catherine ADLOFF.
Vibration Stabilization Experimental Results CLIC Main Beam and Final Focus Magnet Stabilization A.Jeremie LAPP: A.Jeremie, S.Vilalte, J.Allibe, G.Balik,
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
CERN VIBRATION SENSOR PROPOSAL The research leading to these results has received funding from the European Commission under the FP7 Research Infrastructures.
Introduction to seismic sensors (subject 3.2) Peter Novotny PACMAN meeting, CERN, 7 October 2014.
Trends in seismic instrumentation Based on the book Instrumentation in Earthquake Seismology Jens Havskov, Institute of Solid Earth Physics University.
1 LAViSta Laboratories in Annecy working on Vibration and Stabilisation Catherine ADLOFF Andrea JEREMIE Jacques LOTTIN Benoît BOLZON Yannis KARYOTAKIS.
ISAT 303-Lab3-1  Measurement of Condition: Lab #3 (2005):  List of parameters of condition: –Linear distance, angular displacement, vibration, displacement,
1 ATF2 project: Investigation on the honeycomb table vibrations Benoit BOLZON 33rd ATF2 meeting, 24th January 2007 Laboratories in Annecy working on Vibration.
ATF2 week meeting: Impact of cooling water on the final doublets vibrations Benoît BOLZON Laboratories in Annecy working on Vibration Stabilization 15/10/08.
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
Techniques to approach the requirements of CLIC stability K. Artoos, O. Capatina (speaker), M. Guinchard, C. Hauviller, F. Lackner, H. Schmickler, D. Schulte.
Midterm Review 28-29/05/2015 Iordan Doytchinov ESR3.1, WP3 1.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
IN2P3 Les deux infinis G. Balik, B. Caron, L. Brunetti (LAViSta Team) LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry,
CERN, BE-ABP (Accelerators and Beam Physics group) Jürgen Pfingstner Orbit feedback design for the CLIC ML and BDS Orbit feedback design for the CLIC ML.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
QD0 stabilization L. Brunetti 1, N. Allemandou 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, C. Hernandez 2, (LAViSta.
The Actuator and Control unit CERN wire-scanner development review J.Emery for the BWS team.
1 LAPP in ATF2 Extraced from ANR bid A.Jeremie. 2 LAPP in ATF2 Current activities related to accelerators: The LAPP-Annecy team is currently developing.
An Approach to Stabilizing Large Telescopes for Stellar Interferometry It shakes like a…. [G. Vasisht, 31 March 2006] N. Di Lieto J. Sahlmann, G. Vasisht,
CLIC QD0 Stabilization J. Allibe 1, L. Brunetti 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2,C.Hernandez 2 1 : LAPP-IN2P3-CNRS,
CLIC MDI stabilization update A.Jeremie G.Balik, B.Bolzon, L.Brunetti, G.Deleglise A.Badel, B.Caron, R.Lebreton, J.Lottin Together with colleagues from.
STABILIZATION ACHIEVEMENTS AND PLANS FOR TDR PHASE CLIC MAIN BEAM QUADRUPOLE MECHANICAL STABILIZATION K. Artoos, C. Collette, P. Fernandez Carmona, M.
CLIC MDI Working Group Vibration attenuation via passive pre- isolation of the FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
July 5, 2007 C. HAUVILLER CLIC stabilization Beam line and final focus.
LISA R&D activities at APC A status report Hubert Halloin.
Status of training program N. Catalán Lasheras
November : PACMAN Kick-off Meeting Introduction to Work Package 3: “Precision mechanics and stabilization” Michele Modena - CERN.
Vibration Stability Studies of a Superconducting XFEL/ILC Accelerating Module at Room Temperature and at 4.5K R. Amirikas, A. Bertolini, W. Bialowons.
CARE / ELAN / EUROTeV Feedback Loop on a large scale quadrupole prototype Laurent Brunetti* Jacques Lottin**
Status of RF stations for NICA project MAC meeting october 2015.
WP5. Training N. Catalán Lasheras. Outline Introduction Existing vs. new training General training for all ESRs Training by work package Secondments in.
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
1 ATF2 Project Meeting December 2006 Ground Stabilisation with the CERN STACIS 2000 Stable Active Control Isolation System LAViSta Laboratories in.
Main beam Quad Stabilisation: Status of the stabilisation test program at CERN CLIC-stabilization day S. Janssens Contribution to slides by:
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
STABILISATION AND PRECISION POINTING QUADRUPOLE MAGNETS IN THE COMPACT LINEAR COLLIDER S. Janssens, P. Fernandez Carmona, K. Artoos, C. Collette, M. Guinchard.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Mid Term Review Meeting, 26 September 2012M.AUGUSTIN1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
SUM ESR ESR ESR ESR ESR ESR ESR ESR (TBC)
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Electron beams in order to sense nm-size mechanical vibrations? CERN: Marek Gasior: BBQ electronics (Andrea Boccardi: VME electronics) Juergen Pfingstner:
FP7: EuCARD after a year of preparation… A.Jeremie.
NLC - The Next Linear Collider Project Keeping Nanometer Beams Colliding Vibration Stabilization of the Final Doublet Tom Himel SLAC NLC MAC review October.
Test plan for CLIC MB linac quad LAPP option A.Jeremie.
QD0 stabilisation in CLIC CDR A.Jeremie with LAViSta team.
Instrumentation Symposium 10/9/2010 Nigbor 1 Instrumentation Selection Strategies Robert Nigbor
NIST 1-kilonewton Dynamic Force Calibration Facility Ako Chijioke, Rick. L. Seifarth, Zeina J. Kubarych Mass and Force Group Quantum Metrology Division.
PACMAN : technical objectives Hélène Mainaud Durand.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Work Package 1: Pixel detector systems for particle.
QD0 Stabilisation L. Brunetti 1, J. Allibe 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, A. Badel 2, R. Le Breton.
CARE05 – November Status report on active stabilisation of a linear collider final focus quadrupole mock-up J. Lottin, ESIA
EuroTeV WP7 activities at DESY Group Members: R. Amirikas, A. Bertolini, W. Bialowons, H. Ehrlichmann Total Man Power: 1.5 reaching 2 (maximum)
David Tshilumba ESR3.3, WP3.
Vibration issues at Linear Colliders:
Active isolation Target : a low cost dedicated table
3: ISI ASCR, Brno University of Technology, Brno, Czech Republic
Laboratories in Annecy working on Vibration Stabilization
Sub-nanometer displacement measurements in seismic sensors.
Ddd 4-Slides Challenge Silvia Zorzetti.
WP1 Metrology & Alignment
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Seismometer Development for the 1TeV Linear Collider
Presentation transcript:

Midterm Review 28-29/05/2015 Peter NOVOTNY Early Stage Researcher 3.2, Work Package 3

ESR3.2, WP3 /  Contract start date: 1 st April 2014  PACMAN subject: Seismic sensor development and vibration characterisation  PhD title: Measurement of sub-nanometer displacements for mechanical positioning  PhD Institution: University of Savoy  Secondments: LAPP (7M), DMP (3M) CERN SupervisorAndrea Gaddi Academic supervisorBernard Caron, Laurent Brunetti Industry supervisorsIgnacio Zuzuarregui Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/  Basic facts

Background / Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ Master’s thesis Work during my studies: Database developer System engineer Signal processing in low coherence interferometry Before PACMAN: Monte Carlo simulations in electron microscopy

PhD thesis /  Title: Measurement of sub-nanometer displacements for mechanical positioning.  Objective: To improve seismic sensor resolution in useful bandwidth  Start date: 1 st April 2014  Credits required / Already obtained: 36/26  12 credits have to be from university  University courses will be taken following semesters  Status:  Investigating possibilities of sensor improvement.  Characterisation and summary of State Of The Art (SOTA) sensors. Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ University of Savoy, Annecy, France

Project / Seismic sensor development and vibration characterisation Why seismic sensors in PACMAN? Ground is shaking all the time even if we don’t see or feel it. Place in PACMAN Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ Micro seismic peak Cultural noise Nano- meters!

Project / Vibration characterisation of PACMAN bench  When measuring beam position with nm resolution we need to know how a ground motion propagates through the bench and influence our measurements.  Therefore we want to measure ground motion at different positions of the bench. Place in PACMAN Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ Seismic sensors

Project / Medium-term objectives  Characterize the seismic sensors available on the market and those developed by laboratories  compare their sensitivity, self-noise and bandwidth.  Identify the sensor to be developed inside the PACMAN project.  Manufacturing and characterization of the developed sensor.  Integration within the PACMAN bench. Objectives 7 Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/2015 Main objective: To improve existing sensor or develop a new one according to PACMAN's specific requirements.

Project / Tasks description Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ Definition of the requirements Investigation of different technologies and SOTA CLIC BDS requirements Improve/build prototype to answer the requirements CLIC QD0 requirements PACMAN requirements Comparison of SOTA and sensors developed at LAPP Choice of a sensor for PACMAN Definition of procedure for sensors characterization BDS = Beam Delivery System QD0 = Final focus quadrupole

Project / Four phases: 1.Training and familiarization  With whole project, seismic sensors, data acquisition and processing. 2.Validation and characterization of the SOTA (current)  Measurements of sensor parameters.  Investigation of various development possibilities.  Electronics, mechanics, transducers, low noise data acquisition,… 3.Upgrade or new sensor development.  Evaluation and comparison with industrial SOTA sensors. 4.Integration to PACMAN bench and industrialization. Methodology followed Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/2015 9

Project / Requirements to PACMAN sensor parameters  Bandwidth = 0.1Hz – ≈200 Hz  Resolution ≤ 0.1nm  Stray magnetic fields resistance  Dynamic range ≥ 80dB  Weight < few kg & compact size Requirements Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/

State of the art / Different types of sensors for different use: Natural ground motion measurement (tides, micro seism) Building, structural monitoring Earthquakes and moonquakes monitoring Oil and gas exploration Particle accelerators … Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ Geophones Seismometers Piezoelectric accelerometers MEMS accelerometers Force balanced optical accelerometers

State of the art / Main parameters considered: self-noise, sensitivity & bandwidth. Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ Limitations for PACMAN Seismometers Noise Sensitivity ×Bandwidth PZT Accelerometers Bandwidth Sensitivity ×Noise at low frequencies Geophones Noise ×Sensitivity ×Bandwidth MEMS accelerometers Bandwidth Sensitivity ×Noise Most interesting candidate Force Balanced optical accelerometers Bandwidth Sensitivity ≈Noise

Research gap /  High resolution seismic sensor for required bandwidth.  Theoretical vs. measured noise values for various transducers.  Different interferometers for seismic sensors:  Their implementation possibilities.  Pros, cons and limitations. Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/

Project / Procedure for sensor’s self-noise measurement: Results Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ Familiarization with acquisition HW and SW Actual measurement and data acquisition Calculation of Power Spectral Density (PSD) Comparison with theory & values measured by LAPP If match Finished Detecting problem

Project / Results Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ Measuring and processing chain for sensor characterization. PSD

Project / Results Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ Ground motion displacement PSD Main problem is background signal!

Project / Results Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ Measuring noise with background signal Mass locking vs. corrected difference

Project / Results Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ Self-noise - theory vs. real measurement.

Project / Investigation of improvement possibilities:  Modification of PZT dimensions to increase sensitivity.  Using MBQ as seismic mass.  Molecular Electronic Transducers (MET).  Noise reduction in MEMS accelerometers. Results Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ Linear Encoder Interferometer  Implementation of interferometer, Fibre Bragg Grating or linear optical encoder.  Expensive, complex but very good resolution.

Training / Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ Secondment at LAPP, France. 7 months. Measurement and characterization of seismic sensors. Low noise data acquisition. Seismic data processing. Laboratoire d’Annecy-le-Vieux de Physique des Particules Desarrollos Mecánicos de Precisión Secondment at DMP, Spain 3 months - currently ongoing. Training in high precision mechanics. High precision assembly, measurement and adjustment techniques.

Training / Network wide activities: Team building Metrology training CATIA Smarteam basics Training on FSI Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ Academic training lecture: LHC Beam instrumentation Webinars: Vibration transducers by Data acquisition + vibrations measurement by Transferable skills: Making presentations French language course Communication for CERN Guides Safety awareness

Networking Opportunities / - seismological laboratory in Grenoble, FR:  Introduced basics of seismological activities and measurements.  Offered measurement of sensor parameters for results comparison. Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ Producer of interferometric seismometers, Austin, USA: Provided sensors evaluation kits in exchange for testing. Promising candidate.

Conferences & workshops: CLIC workshop, Attended topics related to measurements of ground motion and sensor development. Outreach & Dissemination / Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ PACMAN workshop, Presentation of my subject. Discussions with experts. Dissemination: Introducing PACMAN project to ISTerre laboratory (FR) and Silicon Audio company (USA) Outreach: Became an official CERN guide

Impact /  CERN is a great place to improve knowledge of various technologies involved in particle accelerators.  Gaining practical experiences in measurement, data acquisition and processing.  Improving chances to became a researcher in field of particle accelerators or similar.  Professional contacts and friendships. Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/

Midterm Review 28-29/05/2015 Thank you for your attention

Project/ Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ Dumped harmonic oscillator  Sensor working principle Characterized by parameters like: Bandwidth Sensitivity Resolution Dynamic range Ground motion

Project /  Requirements to PACMAN sensor parameters  Bandwidth = 0.1Hz – ≈200 Hz  Below 0.1Hz – orbit feedback.  High frequencies attenuated.  Resolution ≤ 0.1nm  Which means high sensitivity and low self-noise.  Derived from required stability for BDS which is ≤ rms.  Needed for preservation of low beam emittance (spread).  Stray magnetic fields resistance  Different mg. field on the ground and on the magnets.  Radiation resistance (for BDS).  Dynamic range ≥ 80dB  From 0.1nm to 1µm <- given by GM at different accelerators sites.  Weight < few kg & compact size  to fit inside the PACMAN bench Requirements Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/

Transducers Types of transducers:  Resistive  Capacitive  Piezoelectric, piezo-rezistive  LVDT - Linear Variable Differential Transformer  Optical (Interferometers, encoders)  Elmg. – coil + magnet  Eddy current  … Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/

Power Spectral Density (PSD) of ground motion PSD to RMS Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ Ground Motion in frequency domain RMS of ground motion

Noise sources Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ Sources of noise in seismic sensors: Thermomechanical (Brownian) noise Molecular collisions with mass Thermoelectrical (Johnson) noise Random thermal excitation of charge carriers Other semiconductor electronic noise Schottky noise Flicker 1/f noise Discretisation noise ADC converters

Theoretical nosie comparison Peter NOVOTNY, ESR3.2 PACMAN Mid-term review 28-29/05/ Producer Model name Noise [um*s -2 /Hz 1/2 ] Endevco 86 @100Hz bb rms 1um*s -2 Endevco 87 bb rms <4um*s -2 Wilcoxon DYTRAN MMF Brüel & Kjær Kinemetrics ES-U20.6 DJB Instruments IEPE PCB COLIBRYS SF1600S.A3 in Hz BW REF TEK 131A-02/BH2 Sercel DSU (10 – 200Hz) Metrozet TSA-100Srms rms rms ULN PE accl.