COMPARISON OF 3PHASE AND SINGLE PHASE POWER PLANTS REMOTE SENSING IN BTS STATION.

Slides:



Advertisements
Similar presentations
Poseidon 4002 Rack monitoring 1. Poseidon: Monitor & Control 2.
Advertisements

King Fahd University of Petroleum and Minerals Mechanical Engineering Department Presented by Mohammad A. Al-Muaigel /10/2004 National Energy.
Variable Frequency Drives VFD Basics
AWARENESS PROGRAM ON METER & HOUSE WIRING
Delta Confidential Apr GAIA-series 5-11KVA Introduction.
Sleek Stabilizer for A/C Units By Executive Engineer (Electrical) BSNL, Electrical Division,Tirunelveli.
Aditya Pavan Kumar.T (08FE1A0202) VIGNAN’S LARA INSTITUTE OF TECHNOLOGY AND SCIENCE 1.
Delta Confidential DES UPS introduction UPS training June 2006 Markus Schwab.
1 Training Session on Energy Equipment Electricity Presentation from the “Energy Efficiency Guide for Industry in Asia” ©
Plant Utility System (TKK-2210)
PM-RS / March Industrial CMC. PM-RS / March Industrial CMC III Where did it start? Where is it headed? Rittal supplies infrastructure for.
The League of Extraordinary Engineers Dominick D’Angelo Scott Whiteman Jason Ellis.
American Control Technologies,Inc Power Factor Correction Technology 1152 West 2400 South Suite ‘C’ Salt Lake City, Utah
Technical Presentation on the new Power Saving Unit (PSU) Introduced By View Power.
Confidential & Proprietary. What happens when Wind /Solar do not meet requirements? What next?
SOLAR POWER SOLUTION FOR TELECOM APPLICATIONS
Energy Efficiency: Load management potential savings in the telecommunications network in Africa Author and Presenter; Mohammed Adamu Regional Power Expert.
ENERGY CONSERVATION BUILDING CODE – 2006 PRESENTATION BY VP GUPTA PRINCIPAL CHIEF ENGINEER (ELECTRICAL), BSNL CHENNAI.
NATIONAL ENERGY CONSERVATION AWARD PRESENTED BY : A.GANESAN EXECUTIVE ENGINEER (E) BSNL ELECTRICAL DIVISION MADURAI.
DSM : International Experience (Energy Efficient AC Equipment : Greece) A.K.Asthana Sr. Technical Expert German Technical Co-Operation (GTZ) Bureau of.
Loss Reduction and CDM at Gubbi Substation Energy Economy & Environmental Consultants Bangalore INDIA.
Plug-in Electric Vehicles David Ellis May 20, 2010 AABE National Conference.
Introduction to Electricity PART 1
Solar-Powered Fuel Stations
Bigger Things happen the Micro Way Presenting A Revolution In The Ceiling Fan Technology BLDC Ceiling Fans MicroCad.
Delivering Innovative Solutions Sun Power Technologies is committed to developing innovative, integrated power electronics solutions for the markets that.
Green Initiative on Rail Coaches – A case study of Northern Railway.
July 26, 2014 Refrigeration Subcommittee Proposed Revision of Refrigeration Provisional Data Requirements.
Auxiliary Power Supply System By CGS Gunasekara. Content Why auxiliary supply is needed ? Equipments supplied through auxillary. Modes of operation. Demonstration.
THE NEXT step towards a greener footprint for your NETWORK
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
 Each transmitter’s power monitored individually  Battery charging monitored  Diesel generator monitoring  Cabin temperature + Air conditioner working.
INVERTER PO-1500 SERIES 4 LOCATED IN PORT SIDE NOSE COMPARTMENT PROVIDES 115V AC SINGLE PHASE, 400HZ IN CASE OF FAILURE OF BOTH ALTERNATORS EQUIPMENT.
ENERGY AWARD PROPOSAL FOR NATIONAL ENERGY CONSERVATION AWARD 2007 Shevapet TE Building, Salem.
Off Grid Living Without a Generator Solar Powered AC Coupled Micro Grid © Boyd Solar corp. Didsbury, AB
1. 1.History Of Indian Railway 2.Types of Traction System 3.Non Electric traction system coaches 4.System Of Track Electrification 5.Power Supply For.
Week 9 Common Commercial Building energy efficiency measures (Energy Management Opportunities)
Electricity pricing Tariffs.
Potential of electrical trailer cooling during rest periods Analysis of emission and costs.
Installing a servo-stabilizer in Woodland Guest House  A servo-stabilizer installed Woodland Guest House lighting load.  Date: 24 th February 2012 
18240 Element two - Components INPUTS OUTPUTS PURPOSE TYPICAL USE.
On-Board Electrical Use D.C. Systems Alaska Fisheries Development Foundation University of Alaska Sea Grant Marine Advisory Program Alaska Longline Fishermen’s.
Topic 7: Measuring Electric Power. Getting electricity to your home Power generating station  transmission lines  home Step- up transformer Step- down.
Power to the Coast Project Presented by: Su Wei Tan Industrial Research Ltd.
ALTERNATE / SUPPORT SOLAR ENERGY BY “ECONOMIA” PRESENTATION ON MUHAMMAD ASLAM AZAD MD OF AGECO (PVT) LTD. MEMBER OF ASHRAE (AMERICAN SOCIETY OF HEATING,
INTRODUCTION TO DEMAND SIDE MANAGEMENT(DSM) PRESENTED TO ZAMBIA ASSOCIATION OF MANUFACTURERS ENERGY EFFICIENCY AND CONSERVATION WORKSHOP 5-6 SEPTEMBER.
Economic Comparison off Grid System. Q1 : Sizing of Solar Panel System Let us consider that one house needs following loads; 10W, 2 lamps for 3 hours.
Established in Started by visionary Engineers & Entrepreneurs with Proven Power Electronics background. Committed to energy conservation. Made a.
IEA INTERNATIONAL ENERGY AGENCY PHOTOVOLTAIC POWER SYSTEMS PROGRAMME Overview 1.Introduction / Summary 2.PV-diesel hybrid systems 3.Measurement equipment.
2 SISCON TECHNOLOGIST PVT.LTD ISO 9001:2000 CERTIFIED COMPANY SISCON is a leading group of Electronics Company dealing with automation product. This company.
California Power Deregulation in 1996 Provider selection Fossil fuel (gas, oil, coal) Waste products Renewables (wind, hydro, solar, geothermal) Pricing.
SATURN – GAS TURBINES POWER GENERATING AND GAS COMPRESSOR SETS
E Control Devices have a wide range of Latching Relays. The range of latching includes Relays, 16 Amp Latching Relays, 30Amp Latching Relays, 80 Amp Latching.
Technical Panel Session. Sunday January 11, DC System Failure Modes IEEE PES SBC Winter Meeting. January 11 – 15, New Orleans, LA Part 3.
Dušan Petráš ENERGY AUDITING AND CERTIFICATION OF BUILDINGS IN SLOVAK REPUBLIC Slovak University of Technology in Bratislava, Faculty of Civil Engineering,
E & I 8 th Summit Shree Power Bwr 22-Jan  25 MVA TR-1 testing carried out. TR-1 Power-Transformer-Testing-12jan15.pdf.
Power Generation and Distribution
Power Factor Correction The Definitive power solution
Poseidon 4002 Rack monitoring.
Less power consumption than running a light bulb.
EXTERNAL ALARMS AT BTS SITES
Economic Operation of Power Systems
Green Initiative on Rail Coaches – A case study of Northern Railway
Understanding Olympian Generator Set Schematics
International Wind – Diesel Workshop Overview & Discussion
Calculation of energy consumed
Award for Excellence in Energy Conservation
Your Solution for: Energy Smart Management Real Time Power Monitoring Fuel Theft Prevention Technical presentation.
Sr. Lecturer in Electrical Engg. Govt. Polytechnic,Manesar
Products FM Radio Rebroadcast Unit– RFR-2J0 ]
Presentation transcript:

COMPARISON OF 3PHASE AND SINGLE PHASE POWER PLANTS REMOTE SENSING IN BTS STATION

POWER PLANT 3 ph. Vs 1 ph. DATA COLLECTION EB TARIFF: Rs. 5.50/UNITEB TARIFF: Rs. 5.50/UNIT DIESEL : Rs.35/ LTR.DIESEL : Rs.35/ LTR. POWER DISRUPTION: 12 HOURS PER DAYPOWER DISRUPTION: 12 HOURS PER DAY

EQUIPMENTS R PHASE: 1.5 TR S/T AC UNITS- 1NoR PHASE: 1.5 TR S/T AC UNITS- 1No Y PHASE : POWER PLANT- 35 A DCY PHASE : POWER PLANT- 35 A DC B PHASE: LIGHT AND FANSB PHASE: LIGHT AND FANS POWER PLANT: 150 A, SINGLE PHASE POWER PLANT: 150 A, SINGLE PHASE

EA SET 1No. 15 KVA 3PHASE1No. 15 KVA 3PHASE GIVEN WORKING LOAD OF 1NO AC UNIT AND 35 A DC CURRENTGIVEN WORKING LOAD OF 1NO AC UNIT AND 35 A DC CURRENT AVERAGE DIESEL CONSUMPTION LTR/HR.AVERAGE DIESEL CONSUMPTION LTR/HR.

SINGLE PHASE POWER PLANT AC VOLTAGE: 230, CURRENT: 10 AAC VOLTAGE: 230, CURRENT: 10 A DC VOLTAGE: 55DC VOLTAGE: 55 DC CURRENT: 35DC CURRENT: 35 EFFICIENCY: 55 X35 / 230 X 10EFFICIENCY: 55 X35 / 230 X 10 = 83% = 83%

THREE PHASE POWER PLANT (200 AMPS) AC VOLTAGE: 400AC VOLTAGE: 400 AC INPUT CURRENT:5.5 AMPSAC INPUT CURRENT:5.5 AMPS DC VOLTAGE: 55DC VOLTAGE: 55 DC CURRENT: 35DC CURRENT: 35 EFFICIENCY: 55 X35 / 400 X 5.5EFFICIENCY: 55 X35 / 400 X 5.5 = 87.5% = 87.5%

ENERGY COST PER YEAR (EB) 3.35 X 12 HOURS X 30 DAYS= 1206 kwh 1206 x 5.5 = Rs.6633/- per month Rs.79596/- per year

EXPENDITURE ON EA SET COST OF FUEL : Rs.35/ LTR RUNNING HOURS : 12 HOUR/DAY CONSUMPTION: 1.6 LTR /HOUR EXPENDITURE PER MONTH: 1.6 X12 X 35 X 30 = Rs EXPENDITURE = 2,41,920/- PER YEAR

COST OF PHASE SELECTOR SWITCH AND INSTALLATION CHARGE = Rs. 12,000/- EXPENDITURE ON EA SET

12 HOURS WORKING PER DAY FUEL CHARGES =Rs.2,41,920/- EB CHARGES = RS /- SAVING PER YEAR = Rs –( /-) =Rs.1,60,324/- FUEL SAVING : RS.1,60,324/- PER YEAR. EXPENDITURE ON EA SET

RECOMMENDATIONS SINGLE PHASE POWER PLANT WITH PHASE CHANGER IS ECONOMICAL WHERE DISRUPTION OF ONE PHASE BY EB IN PRACTICESINGLE PHASE POWER PLANT WITH PHASE CHANGER IS ECONOMICAL WHERE DISRUPTION OF ONE PHASE BY EB IN PRACTICE EB METER CAPACITY SHALL BE 20AMPS PER PHASEEB METER CAPACITY SHALL BE 20AMPS PER PHASE COST OF PHASE SELECTOR SWITCH CAN BE RETRIEVED WITHIN ONE MONTHCOST OF PHASE SELECTOR SWITCH CAN BE RETRIEVED WITHIN ONE MONTH

RECOMMENDATIONS THREE PHASE POWER PLANT IS ECONOMICAL IN URBAN AREAS WHERE CONTINUOUS 3PHASE POWER SUPPLY IS AVAILABLE.

REMOTE SENSING IN BTS STATION - LOCATION DB ROAD COIMBATORE OTHER BTS STATION

REMOTE SENSING IN BTS STATION DB ROAD: PRESEVI MAKE SENSOR FOLLOWING TRIP INDICATIONS EXTENDED TO TRICHY FROM COIMBATORE AC FAILURE LLOP LOW FUEL POWER PLANT TRIP FIRE ALARM DOOR OPEN COST : 11000/-

OTHER BTS STATION FOLLOWING TRIP INDICATIONS EXTENDED MAKE: PRESEVI FIRE ALARM ENGINE FAIL EB SUPPLY FAIL COST: 5000/-

THANK YOU EE COIMBATORE