AREMA VIBRATION REQUIREMENTS - UPDATE October 9, 2003.

Slides:



Advertisements
Similar presentations
Spring Terminal Technology
Advertisements

1. VAN-NSP Project governance In compliance with the Licence Agreement, the Eurosystem (BdI) and the two selected VAN-NSP (SWIFT and SIA-Colt) have designated.
4.4 – Graphing Sine and Cosine Functions APPLICATIONS.
Line Efficiency     Percentage Month Today’s Date
Bureau of Indian Affairs ABC and Management Decision-Making May 24, 2006.
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
. Summary of the consultation on the CES Census Recommendations Conference of European Statisticians 17 June 2015.
Shock and Vibration Testing
Market Analysis & Forecasting Trends Businesses attempt to predict the future – need to plan ahead Why?
Warranty Working Group Update. Warranty Working Group's Mission Review both new and existing technologies and business processes to develop a warranty.
RI Educator Evaluation System Design ACEES Meeting October 25, 2010.
2 nd Design Update Presentation March 17, Overview Ground Segment Space Segment OBCTNCTransceiverAntenna PCTNCTransceiverAntenna Rx Tx Rx Tx Rx.
Federal Software Asset Management Initiative Concept of Operations Report to the Executive Steering Committee March 8, 2004 Implementing the President’s.
State Technology Transformation CIO Council January 8, 2008.
Parks & Recreation Service Delivery Model Review Progress Report #1 City of Pitt Meadows Council January 19,
Geospatial Line of Business FGDC Steering Committee Meeting October 23, 2006.
2050AP Project WP5: “Conclusions” UPM Madrid 11 de Octubre 2013.
Support to the Ministry of Education of the Republic of Azerbaijan for Further Adherence of the Higher Education System to the European Higher Education.
1MIL client logo to be positioned at the mark minimum height maximum size navigator Text Lines MIL Agenda.
Notes for Interpretation
SPOUSE LEADERSHIP DEVELOPMENT COURSE (SLDC) CLASS 68
Jan 2016 Solar Lunar Data.
SPF MAG Quarterly Report – Feb 2015
Committee on Information Technology
C-130 and instrumentation for RICO
August LNBA Agenda Time Topic 1:00 – 1:15
Progress Report of World-wide Light-duty Test Cycle
Common Small Pedestal Motor and Bearing Requirements. Introduction
MAIN 220 Equipment Installation
Average Monthly Temperature and Rainfall
Professional & Scientific Council Update
2018 Safety Group 1 – 5 Year Program Timeline Guide
API S64 Summer Conference Update.
Managing Hand-Arm Vibration in Construction
ctclink Steering Committee
Mammoth Caves National Park, Kentucky
Portfolio Management Process & Customer Request Management
Sentinel-2 Status Update
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Assembled by the Rubicon Forest Protection Group
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE

2018 Advantage Program Timeline Guide

CYCLE 2019 Application Process & Timeline
Professional & Scientific Council Update
Work plan and next steps – RDE-LDV working group
Potential Minor Release Drop 4 Timeline & Scope
PARCA Timeline.
Managing Hand-Arm Vibration in Construction
Unemployment in Today’s Economy
TIBC Budget Formulation Improvement Project
J.D. Grants Funding Process
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Section 4.5 Graphs of Sine and Cosine Functions
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Illinois SMART School Academy
Month 43: June 2016 – Month 50: January 2017 Remaining Deliverables
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Sep Oct Nov Dec Jan Feb Mar Apr May
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
2016 Advantage Program Timeline Guide
Presentation transcript:

AREMA VIBRATION REQUIREMENTS - UPDATE October 9, 2003

2 AGENDA Review AREMA Vibration Guidelines Review Project Scope Methodology Progress Next Steps

3 AREMA Vibration Guidelines Summary of Test Recommendations Section Sinusoidal Vibration Test Exploratory Sine Sweep (identify resonance) Mechanical Shock ex) Class A Sinusoidal –Range / Levels 5 to 20 Hz:0.2” peak-peak 20 to 200 Hz:4.2 g-peak –12 Minute Sweeps (0.9 Octave/Minute) –4 Hours per Axis (20 cycles)

4 Review Project Scope Re-evaluate Current Specification. –Current Spec - Accurately characterize environment? –Possible over-test condition. –Goal: Develop scientific basis for vibration test specification. Ensures durable and reliable products. Avoids unnecessary design and test cost in new products. Field Study and Report –Four railroad sites for data acquisition. –Limit scope to Class A. –ALSTOM investment, will share data and results with Committee. –Full Presentation and Recommendation at C38, Spring 2004.

5 Methodology LMS Engineering Services contracted by ALSTOM –Leader in the Vibration Industry –State-of-the-art Equipment and Analysis Tools –Experience in Specification Development –Strong Project Management Statistical Analysis of Environment to identify –Fatigue Damage Spectrum (FDS) (WEAR) –Maximum Response Spectrum (MRS) (OVERSTESS)

6 Methodology

7 PROGRESS - Site 1 BNSF Data capture completed, Analysis in Progress

8 Progress & Next Steps

9 Next Steps Complete Analysis of BNSF DataLMS Oct/Nov ‘03 Complete Data Collection CNLMS, ALSTOM Oct ‘03 Walk-through & Data Collection CPLMS, ALSTOM, CP Nov ‘03 Identify Site #4Committee 38 Oct. 9, 2003 Walk-through & Data Collection #4LMS, ALSTOM, RR Dec ‘03 Complete Data Analysis - all sitesLMS Jan ‘04 Complete Mission SynthesisLMS Feb ‘04 Present Project to C38LMS, ALSTOM Mar ‘04