© ABB Group - 1 - 3-Aug-15 Medium Voltage Hard Bus Retro-fill ABB MV Service.

Slides:



Advertisements
Similar presentations
Lockout/Tagout Awareness Training
Advertisements

Variable Frequency Drives Bypass Options
Denver Fire Alarm Test FUNDAMENTAL, POWER SUPPLIES, CIRCUITS, INSPECTIONS, TESTING and MAINTENANCE.
Incident took place at OPP substation at 9. 31
Current Electricity - Symbols
Quad Plus Shredder Drive Maintenance Joe Kowalkowski Engineering Manager – Recycling Industry
© ABB Ltd - ATLV /26/2015 Insert image here Fuses vs Fuseless Technology.
Today’s Meeting There are approximately 25 people killed by electricity per year in Australia (average for the last 7 years), 700 people are hospitalised.
Copyright © 2011 Rockwell Automation, Inc. All rights reserved. Insert Photo Here OneGear™ 7.2kV Motor Control Center.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
CHREID 2008 ELECTRICAL SAFETY Introduction and Overview of Safety Clayton H. Reid September, 2010.
Air-Conditioning Control Systems
ACADs (08-006) Covered Keywords Switchgear, motor control, ground, circuit breaker. Description Supporting Material
The Load Bank of Choice
EVD4 - The Smart eVolution Primary distribution circuit-breaker with integrated protection, control and sensors © ABB Group 15. April 2017 | Slide 1 1.
GCB Service Earthing Switch Retrofit Kit for HGC-3 & HEC 3..6 ABB High Current Systems Services © ABB Group April 15, 2017 | Slide 1.
Rep Training Presentation. The Focus Today Who we are targeting…Who is a typical Trayer customer Who we are targeting…Who is a typical Trayer customer.
Construction Training
ABB - 1- ABB ABB Load Interrupter Switchgear. ABB - 2 ABB Contents Introduction to Load Interrupter Switchgear What, Where, Why ABB Technical Offering.
PowerCare Customer Support Agreement LP Products and Systems 2013 PM.
Transformer SONNY P. DE LEON MT 1.
VHA PANEL WITH HPA12 CIRCUIT BREAKER
SF6 load-break switch-disconnector
Qualified Electrical Worker
Controlling Hazardous Energy
Flanders Electric – Engineering Division Welcomes Youto an Overview of Reconditioned Switchgear.
Multi-function apparatus for secondary distribution
Chapter 1 Aircraft Electrical System. Chapter 1 Aircraft Electrical system Electrical component Storage Battery DC & AC Generator Control and Protection.
Objective of the Lecture Describe a basic electric circuit, which may be drawn as a circuit schematic or constructed with actual components.
8/10/20151 THE BASICS OF INFRATECH HEATER CONTROLS.
NWACC Business & Industry Workforce Development Institute J- 1 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) FOR GENERAL INDUSTRY.
© Evaluating Electrical Risk Factors Module 3.
From Research Prototype to Production
Copyright © 2011 Rockwell Automation, Inc. All rights reserved. CENTERLINE 2100 Motor Control Center - SecureConnect™ September 1, 2011.
5.1 Student Book © 2005 Propane Education & Research Council 5.1 Designing & Installing Dispenser Transfer Systems.
Health & Hygiene/ELB Sample LOCKOUT/TAGOUT “APPROVED” TRAINING.
Reyrolle LMT Breaker Retrofit BU PPMV – PG Service Marketing and Sales
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
MNM Fatal Electrical Accident Electrical Accident October 10, 2010 (Oklahoma) October 10, 2010 (Oklahoma) Granite Operation Granite Operation Contract.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Main contacts closed – RED Colour with ON
Basic study of a switch Unit 3.Lesson 3. A switch Purpose A switch is a mechanical device used to connect and disconnect a circuit at will Parts seen.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Fermilab AD E/E Support Department Fermilab’s Experience in Applying OSHA and NFPA 70E Requirements in Accelerator Power Supply Systems NFPA 70E Standard.
E4 HVACR Electrical Installation
MNM Fatal Electrical Electrical November 18, 2013 (Kentucky) November 18, 2013 (Kentucky) Crushed Stone Mine Crushed Stone Mine Contract Electrician.
 E4 HVACR Electrical Installation #3 Circuit breakers, disconnects, and fuses.
Electrical Events Involving Look-Alike Equipment within the DOE Complex.
This project on Primary sub station of Visakhapatnam port trust at Visakhapatnam. It is 132kv/11kv substation with incoming feeder from APTransco and 11.
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
E4 HVACR Electrical Installation
Maintenance Error Results in Bypassing Enclosure Electrical Lock Out Tag Out John E. Anderson Jr. Energy Facility Contractors Group Electrical Safety.
E4 HVACR Electrical Installation
DESCRIPTION AND GUIDE TO OPERATIONS
AMT Toolkit for MCM Sales
Qualified Electrical Worker
Circuit Breakers & Reclosers
Overview of PowerCube Units and ANSI frames
Overview Key diagram of 220 KV Sub station, Ablowal Cables
Personal Protective Equipment
The Electric Circuit.
LOTO(V) Procedures MESH Process Safety, 8.7 Energy Control
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Control of Hazardous Energy
Current Electricity and Electric Circuits
PSS0 Design & Concept of Operations
SMART Program Specific Metering Wiring Diagrams May 2019
Its strengths, your benefits
Its strengths, your benefits
Presentation transcript:

© ABB Group Aug-15 Medium Voltage Hard Bus Retro-fill ABB MV Service

© ABB Group Aug-15 Medium Voltage Retro-fill Process Product Before and After Safety New Technology Q and A

© ABB Group Aug-15 Medium Voltage Retro-fill The Process - Site Verification Visit for Engineering Measurements – An ABB design engineer visits the site to obtain measurements of the existing equipment for the purpose of designing all of the components necessary for the retro- fill (door, barriers, dead front, bus, etc.) in order to incorporate the L-Frame into the existing switchgear cubicle. A one (1) day outage is required for these measurements. - Custom Component Design Engineering and Manufacture – ABB’s design engineer will design any components deemed necessary for an effective and efficient retro-fill. Approval drawings will NOT be generated, but rather we will supply mechanical conceptual drawings, and control diagrams. Some components, such as the copper bus connectors between the L- Frame and the existing switchgear cross bus, may be designed on-site during the retro-fill by the ABB Field Engineer in the performance of the installation. The designed components will be manufactured and either shipped to the site or brought to the site by the Field Engineer. Upon completion a full set of as built drawings will be supplied.

© ABB Group Aug-15 Medium Voltage Retro-fill - Shipment of Standard Materials – Circuit breakers, L-Frames, CT’s, Kirk Key Locks, etc. are shipped to the site, with their arrival verified prior to dispatching ABB Field Engineers to the site to perform the retro-fill. - Demolish Existing Cubicle Contents – ABB’s Field Engineers will remove the old breaker, racking components, and any other unnecessary items from the cubicle, effectively gutting the cubicle for unimpeded access to the cross bus. - Installation of L-Frame – ABB’s Field Engineers will incorporate the L-Frame, CTs, barriers, dead front, new door with indicating lights, breaker control switches, etc., into the existing cubicle, connecting the switchgear bus to the L-Frame’s primaries with appropriately sized and braced copper bus.

© ABB Group Aug-15 Medium Voltage Retro-fill Installation and Commissioning of the New ABB Advac Circuit Breakers – The new circuit breakers will be racked into the L-Frame and commissioned (verification of safety interlocks operation, verification of open, close, motor charging operation, verification that breakers lever easily into or out of their switchgear compartment cell, testing for vacuum integrity, plus operational and vacuum interrupter technology training for the end user operators.)- Complete outage with LO/TO and grounds per DLCo procedures

© ABB Group Aug-15 Medium Voltage Retro-fill The Product - The new Breaker and L-Frame will be ABB Advac. - Current production - Spare parts readily available for customer stock - Closed Door racking - Option for remote racking if required - Interchangeability

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill

© ABB Group Aug-15 Medium Voltage Retro-fill OPERATIONAL SAFETY The process of racking a circuit breaker into and out of the connected position is one of the most frequent exercises that expose an operator to risk. Increased focus on operator safety has caused owners to question the adequacy of prior switchgear designs that require the cell door to be open in order to connect or disconnect the primary circuit and the secondary control circuit. A malfunction during this operation has the potential for catastrophic consequences to equipment and personnel. Supervised, closed door circuit breaker racking is a fundamental recognized safety practice. Furthermore, older breakers are more complex and vulnerable to mechanical failures that create safety problems.

© ABB Group Aug-15 Installed applications Westinghouse: B-22-B B-28-B 138-B-250 B-28-B Vertical B-22-B Vertical McGraw Edison 5-WSA-250 PSD General Electric FKR-225 FK-225 FK-32-C F-100 FK-143 AKR-30 (stationary) Allis Chalmers DZ-60 DZ-80 DZ-100 Federal Pacific DMB-75