“Asset Management and the organization of condition based maintenance”

Slides:



Advertisements
Similar presentations
New Technology Environment Technology as a Strategic Asset Tom Lehman Lehman Associates, LLC Lehman Reports Association TRENDS Live September, 2014.
Advertisements

Merit Consulting Terje Myrseth MUA – October 2008.
Traci L. Bender Nebraska Public Power District APPA Business & Financial Conference September 15, 2009 Risk Analysis.
ITIL: Service Transition
Thales Axle Counter The Challenges for a modern Train Detection System
5 december 2011 Living Probabilistic Asset Management Dr.ir. J.A. van den Bogaard.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
Experience, Technology and Focus in Mid Market CRM Soffront Asset management: An Overview.
Koos Kunneke – MMIS Analyst Corne Engelbrecht – Maintenance Engineer Advance Asset Condition Assesment.
McGraw-Hill/Irwin Copyright © 2008, The McGraw-Hill Companies, Inc. All rights reserved.
What is an Information System? Input of DataResourcesProcessing Data Data Control of System Performance Storage of Data Resources Output of InformationProducts.
Desigo CCTM Your milestone in building management
Copyright © 2003 Americas’ SAP Users’ Group Making a Profit with Customer Service David Baethke, Vice President, The Baer Group Wednesday, May 21, 2003.
McGraw-Hill/Irwin Copyright © 2008, The McGraw-Hill Companies, Inc. All rights reserved.
Introduction to Systems Analysis and Design
Relationship Marketing
Module 1: Overview of Information System in Organizations Chapter 2: How Organizations use IS.
By Jan Swier and Ted Slump, ProRail, The Netherlands
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
UMT and Microsoft Presenting Tips and Tricks Basics What’s new in Microsoft Project 2010 Brian Feder, MBA, PMP Senior Vice President UMT Consulting Group.
> taking best practice to the world International Experience with Performance Based Maintenance Contracts.
Enterprise Asset Management
02/10/2011Ombati Thomas ENTERPRISE RESOURCE PLANNING (ERP)- SAP PRESENTATION November 2012.
Leen Vooijs Implementing risk based maintenance concepts.
Twinning project, activity 4, Maintenance assessment Tuesday 4 th October 2005, session 3 Output management: essential Instruments within ProRail By Jan.
1 Ministry of Transport, Public Works and Water Management.
Value Driven Maintenance Discover The Hidden Treasure In Your Organization Mark Haarman, Managing Partner Birmingham, 18 April 2012.
Fleet Performance and Reliability in Generation Utilities
18 September Licensing for Next Generation Signalling Buddhadev Dutta Chowdhury 27 th April 2012.
Object Arena overview  OAOT is a premier provider of outsourced Information Technology (IT) services supporting Several Fortune 500 companies on a global.
More than experience CERN – 25 th November Initialization Phase Summary Maintenance Management Project Arek Burnos, Tony Vaclavicek Consultancy team.
ERP Enterprise Resource Planning D Lewis 10/02. Definitions ERP is a process of managing all resources and their use in the entire enterprise in a coordinated.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
KNX – the benefits. Schneider Electric 2 - IS&C – Aug Content ●Basic arguments ●Added value for: ●Investors ●Wholesalers ●Installers and System.
Program Management The Financial Sector Presented by Bob Walker 3 shaping the future of program management
© 2005 KPMG LLP, a UK limited liability partnership and the UK member firm of KPMG International, a Swiss cooperative. All rights reserved. The KPMG logo.
Asset Management Control Systems Approach Introduction 2009 John Stavenuiter PhD in AMC Founder of the AMC Research Foundation and AMC Centre Program Director.
1 | 2010 Lecture 3: Project processes. Covered in this lecture Project processes Project Planning (PP) Project Assessment & Control (PAC) Risk Management.
Copyright © 2006, The McGraw-Hill Companies, Inc. All rights reserved. Developing Business/IT Solutions Chapter 12.
Cmpe 589 Spring 2006 Lecture 2. Software Engineering Definition –A strategy for producing high quality software.
DOE ASSET MANAGEMENT PLAN
Your Name Your Title Hewlett-Packard Company Software Engineering for E-Business.
1. 2 Introduction of Proficium Infastructural Projects Reliability Analysis How PTC Windchill QS helps us Content 3.
TMALL 0141 Presentation v 1.0 Asset Management Bo Olsson Bucharest October 7th, 2015.
Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution Structured programming Product SW.
Take your business one step further… …let us show you HOW.
Proprietary & confidential. © Decision Lens 2012 Modeling Best Practices in Transportation Jon Malpass Director, Decision Solutions.
© Project One Consulting Limited All rights reserved. 0 Introduction to Project One Slides.
Swedish Risk Management System Internal management and control Aiming to Transport Administration with reasonable certainty to.
Realising the Community Vision of Concurrent Enterprising ICE 2003 Moderator Roberto Santoro, ESoCE NET Roberto Santoro, ESoCE NETwww.esoce.net.
© 2006 The MITRE Corporation. All rights reserved EA in the Federal Enterprise Life Cycle September 2006 Steve Decker MITRE Corporation Center for Enterprise.
Integrated Architecture Framework (IAF)
Version VTT TECHNOLOGY STUDIES Evaluating the societal impacts of Public research organisations: A (belated) paradigm shift in the making Kaisa.
Office of Major Project Development (OMPD) Overview November 2015.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Breakout Session 3 QHSE Strategic Risk Management.
ERP vendor perspective
2017.
ITIL: Service Transition
Future Rail and Road developments
Object Arena overview Object Arena is a premier provider of outsourced Information Technology (IT) services supporting Several Fortune 500 companies on.
Presented by Jon Pastuszynski, Lead M&D Engineer
Identify the Risk of Not Doing BA
Program Control Services – Overview
Across the entire value chain
Project Information Management Jiwei Ma
DAT381 Team Development with SQL Server 2005
MAZARS’ CONSULTING PRACTICE Helping your Business Venture Further
Fertilizer Industry Safety Information Analysis and Sharing Program
Capitalize on Your Business’s Technology
Presentation transcript:

“Asset Management and the organization of condition based maintenance” Nick van den Hurk 20 November 2009 General Meeting EFRTC Berlin

Agenda 1 Introduction 2 Vision on Asset management in the supply chain 3 CBM in the Netherlands 4 Methodes

VolkerRail Maintenance contractor Rail infrastructure: ProRail, Lightrail (o.a. RandstadRail, SUNIJ) and industry (o.a. Corus) Dry and wet infrastructuur for RWS (Onderhoud tunnels en Sluizen NoordHolland en IJsselmeer en Zeeland) Project contractor All types of Rail infrastructure Service provider for engineering and consultancy Condition Based Maintenance (o.a. ProRail, Schiphol, HTM) Organisation 2700 employees In UK, Netherlands, Germany, Poland, Estonia, Finland and Sweden

Maintenance Rail (NL) ProRail, Lightrail en Industry

Maintenance Highway Agency (NL) – Tunnels Noord Holland

Maintenance .. (NL) RWS – Sluizen & bruggen Noord Holland

Market Developments in Rail Higher/Customer requirements Focus Infra Manager on RAMS(HE) requirements Performance contracts focused on continuous improvement Contractor responsible for maintenance management More international and professional Information technology

Maintenance Competenties Fire brigade maintenance Development Asset Management Maintenance Competenties Type of contract Phase 4 Asset life cycle mgt. Focus on RAMS- & LC management Performance Budgets Prescriptions Assets Performance Lump sum & incentives Phase 3 Installation mgt. Focus on effectiveness Maintenance Concepts Specifications Documentation Improvement plans Performance lump sum & incentives Phase 2 Maintenance Mgt Focus on efficiency Planning Preparation Materials Supervision Input Unit/lumpsum Maturity of the chain Phase 1 Fire brigade maintenance Problem solving Execution Inspection Volume Cost plus Time “Execution of inspection and access to Inspection data is strategic to be able to grow in Asset management”.

Philosophy ProRail maintenance Depending on risk profile, the required output is re-active or pro-active specified in contracts Output Input Re-actief Functionality based on RAMSHE RA M S H E SKI’s Spoorweg- veiligheid Duurzaamheid IH-specs Pro-actief Activities Proces-demands Prestatie-/outputsturing ProRail Sturing aannemer © ProRail. All rights reserved

Added value contractors Integrated approach Focus on RAMSHE (availability, reliability, maintainability and safety Powerful control (planning) processes Integration of maintenance management in organization Focused ICT support for processes Focused on transparency and development of cooperation Expert in organization Condition Based Maintenance

Importance Monitoring and Condition Based Maintenance Higher requirements - proactive/preventive approach Most effective Maintenance strategy Only executing Maintenance where and when needed Obligatory inspections by law Basis of Life Cycle considerations and investment plans Pillar in Reporting Performance contracts Requires absolute transparency en data sharing 11, 12 en 13 nog samenvoegen

Difficulties Condition Based Maintenance Differences of judgments and registration Labor-intensive data transmission /analyses Managing of workflow and reporting Availability of management information, historic and current Manage gigantic amounts of data Requires viewing-, analyzing- and reporting tools Costs for tools are considerable and it requires specialists Requires specialist know how in combination with maintenance processes

Organization Monitoring and condition based maintenance Process Measure ring and data storage Analyze en predict Planning and reporting Evaluation (ao thresholds) Systems and technology EAM-systems Monitoring and measurement tools Platform data storage and analyzing Organization Monitoring specialist Analyst Technology centre and partners To support inspection and Condition Based Maintenance we developed generic applicable platforms

Customer infrastructure management process Management information Conditiebeheer - Impact systemen Customer infrastructure management process Inspection Monitoring Measurement Condition assesment Network Definition DSS Life-cycle management Reports LCM strategy’s & costs Performance indicators Maintenance Cost Maintenance History Condition & assessment EAM Enterprise Asset Management Standard Network Definition GIS Network Definition Customer Asset database System and information based on customers needs

Mobile Inspection platform (FlexInspect) Standardized data, everywhere accessible All inspections and all assets Readily adaptable, fast results Integrated storage of all photographs Barcode & GPS (0-1 m) Easy to integrate with other systems More transparency 25 % - 50 % cost reduction Used for/by: Stand alone or intregrated Flex- Inspect EAM Maximo SAP Mincom Infor EAM BAM Rail

Monitoring platform (AOC) AOC stands for Asset Observation Center “Real-time” observation of assets for: Early detection of failures => increase of availability More insight in performance en degradation => better maintainability Easily combines different infrastructures, installations and systems on several sites Web-based customer portal with custom-made data presentation Alarms can be generated by relays, e-mail, SMS or directly send to a PAC Cost-effective and flexible due to modularity Network definition AOC EAM Status & performance information

Switch and Track Measurement System Critical asset for Reliability and Availability Cost Safety Difficulties Standardization measurement Uniform & reproducable data Analysis Decision support Management info Onboard computer system Light sectioning profile measurement modules Blade detection module Video inspaction system GPS navigation module GSM online communication Air-conditioning system Operators terminals

Switch and Track Measurement System Track mode Speed up to 160 km/h Measurements every 3m Real time preview Rail type detection Rail waer detection Gauge Slope Rail profile Vertical and horizonlat ware Waer angle 18

Switch and Track Measurement System Switch mode Speed up to 30 km/h Measurements every 3 cm Blade detection 19

TMS System Architecture Office system TMS raw data locatie verifiëren localization verification parameter s calculation specialist supervising report generation Klant gerichte rapportages 20 20

Switch and Track Measurement System TMS raw data localization verification parameter s calculation specialist supervising report generation klantgerichte rapportages 21 21

parameters calculation Switch and Track Measurement System TMS raw data localization verification parameters calculation specialist supervising report generation Others profiles klantgerichte rapportages 22 22

specialist supervising Switch and Track Measurement System TMS raw data localization verification parameter s calculation specialist supervising report generation Plots (track plots), video inspection, klantgerichte rapportages 23 23

Switch and Track Measurement System TMS raw data localization verification parameter s calculation specialist supervising Report generation Excel report, table reports Voorbeeld rapportage klantgerichte rapportages 24 24

Switch and Track Measurement System TMS raw data Asset specialist Analyses of complex relations between measured parameters Search to deviations / exceedings Description of measures to solve the deviations Description of structural improvements Making tamping plans Defining replacement/renewal actions Defining weld and grind actions Maintenance engineer Combine other data Trending analyses Reporting Measuring engineer Evaluating results from TMS, TEE localization verification parameter s calculation specialist supervising report generation customer data publication 25

Benefits Data & information accurate, reliable and reproducible Insight in status/quality and deterioration of switches Contributes in safety of switches Maintenance more predictable and effective Better grounds for LCM decisions Increases Availability Reduces maintenance costs

Summary sheet VolkerRail: from a project only contractor to a full service contractor Observations: Much more in depth know how of track systems Threatening to clients if not good managed Grow market in Europe Large investments vs satisfying financial results

Thank You For Your Attention