Station 31 & Station 35 Procedures for fill station with booster pump.

Slides:



Advertisements
Similar presentations
Introduction to Pneumatic Components Build a Working Pneumatic Circuit
Advertisements

Peterson Product Support
Ag Metals I Using Gas Welding Equipment. Objectives Identify major part of oxyacteylene welding equipment Change oxygen and acetylene cylinders Turn on.
PALOMINO VALLEY GID WATER SOURCES Truckee Meadows Fire Protection District.
3.4.5 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Pumps, Strainers and Bypass Systems Knowing how to maintain.
Scott 4.5 Introductory SCBA.
Technical support provided by: Highly Pathogenic Avian Influenza Control Programme SOP Use and Maintenance of High Pressure Washer Machine Market chain.
1 FUEL SYSTEM SERVICE ENGINE CLEAN FUEL TOOL MODEL RX 777.
Job Performance Requirement 7-13 Servicing an SCBA Cylinder Using a Cascade System.
Sava air bags. The new equipment Air Bags Kevlar reinforcing w/ thick, multi-layer rubber shell 24” x 24” positive grip surface w/ safety straps Max load:
CAFS On-Line Orientation
Hydraulic Brake Control Valves Automotive Mechanics Technology Walla Walla Community College.
FACSAria The basic parts
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
Agricultural Science II.  Define the chapter terms on an exam with 90% accuracy.  Describe the proper/safe way to turn the oxyacetylene rig on and off.
ResQmax Line Deployment Kit -ResQmax Launcher- 5 nozzle protectors -2 Streamline Projectiles- O-ring kit -500’ 3mm line with container- Corrosion block.
Sunday, May 17, 2015 Pressure Booster Service. Sunday, May 17, 2015 Booster Service Basics Control Panel Components Setting a pressure switch Setting.
S.C.B.A. MAINTENANCE By: Lt. Eric Miller Parksville Fire Department.
MODULE 7 Unload a Cargo Tank Motor Vehicle (CTMV).
UNIT 6 Tractor Hitches PTO’s Hydraulics
A/C testing and service. Before testing and service, technician must be certified by ASE, MACS, or IMACA.
High Pressure Lifting Bags
Water Supply Skill Drills.
The Safe Transfer of Pressurized Gas. Collect the Necessary Tools and Equipment Safety Glasses for EVERYONE SCUBA Tank filled to 3000 psi Fill Station.
PRODUCT DESIGN The Firefighter Air Replenishment System Also known as FARS DESIGN 1 © 2011 Ronny J. Coleman.
Oxygen Acetylene Equipment Oxygen = Green Acetylene = Red.
1 HVACR318 – Refrigeration II Diagrams. 2 Hooking up Gauges on Suction and Discharge Lines.
Eco-Winter Installation. – Step 1 – Mount Eco-bypass to water heater.
VRFA ANNUAL RESPIRTORY PROTECTION. THE ADMINISTRATOR.
OXY-FUEL GAS WELDING. TERMS AND DEFINITIONS CONTINUED  Back Fire  Momentary burning back of the flame into the tip.  Flame goes out with a loud snap.
1 HVACR316 - Piping Piping Applications Brazing Piping Applications Brazing.
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
Breathing Air Scott-RevolveAir Charge station with X4 controller. Storage Auto-fill capable. Unit can fill 2 SCBA bottles at a time behind a burst shield.
Booster Pump/ Compressor Procedures Rescue 31 Operator Instructions.
LESSON 16 ENGINE OPERATION
MODULE 2 Operate the Propane Liquid Supply System.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Connections are loose for draining pump Water in From street Water out to house This is the setup for public water Pressure and the pump system turned.
PSI Fill Station Operator (FSO) General info. on compressors Types of Fill stations Why to fill cylinders in a dry environment Fill station operator responsibilities.
Oxy-Fuel Welding. What is Oxy-Fuel Welding? Process the fuses metal together Does not require electricity Uses a torch and filler rod Similar equipment.
XR842/1045 Pressure Adjustments. Main Pump Standby Pressure Max Pressure.
Oxyacetylene Start Up/Shut Down Procedure Prepared by Dr. Dale Carpentier and Mr. Barry Brazelton Monroe Area High School Modified by Georgia Agriculture.
Skills Instruction Backpacking Stoves Your name Troop Guide N Totem here.
STEP 1 Locate the transmission cooler line connection on the vehicle. Identify the correct adapters to be used by referring to the vehicle application.
Procedures.
Fire Fighter Safety SCBA CHANGE/REFILL
The Welding/Cutting Torch Objective 25.0 Demonstrate proper procedures for oxyacetylene processes.
14 Refrigerant Recovery, Recycling, and Recharging.
R1 Fundamentals of Refrigeration
air cycle cooling systems
Unit 22 Ag mechanics Using gas equipment.
OBJECTIVES Discuss the various methods of loosening the brake bleeder valve. Discuss the need for brake bleeding. Describe the manual bleeding procedure.
Oxyacetylene Start Up/Shut Down Procedure
How to Protect Your Vehicle in Cold Weather
Brake System Problem Diagnosis & ABS Service Tips
Automatic lights.
Job Performance Requirement 7-11
Introduction to Agricultural Science and Technology
CDL TESTING --- Training Tips Brought to You by NYAPT
R1 Fundamentals of Refrigeration
Shutting Down the Cutting Outfit
Instructions: Adding refrigerant fluid to system
Compressed Air Safety.
Oxygen Acetylene Cutting Torch
Compressor Operating Instructions
Distribution Student Task
Presentation transcript:

Station 31 & Station 35 Procedures for fill station with booster pump

Wear hearing protection Booster pump is very loud, hearing protection is required!

Make sure valve on booster pump is turned on. Valve is blue at sta. 35 and yellow at sta. 31 You can leave this valve in the on position at all times. There is no need to turn it off.

We are no longer using the “cascading” principle. Because of the new booster pump you now leave all the banks in the open position. They will self equalize and be automatically refilled by the compressor.

Open door and insert bottle

Connect bottle, close bleeder valve, and open bottle

Close door and lock it

Set regulator pressure to 4500

Open fill valve. Bottle will fill to the set regulated pressure. Allow cylinder to fill slowly to avoid overheating.

Shut down procedures Close fill valve Bleed off regulator to 0 psi Unlock door and open Turn bottle off, open bleeder valve, and disconnect bottle Take bottle out and close door Relieve regulator pressure to 0 All done