Slides:



Advertisements
Similar presentations
M. Jones, A. Boston, M. Chartier, B. McGuirk, P. Nolan, R.D. Page, P. Pusa, D. Seddon, J. Thornhill, D. Wells and the ALPHA collaboration Department of.
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
ATLAS Module building at Glasgow
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Research and Development for the HFT at STAR Leo Greiner BNL DAC 03/15/2006.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
SiD EMCal Testbeam Prototype M. Breidenbach for the SiD EMCal and Electronics Subsystems.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
1 WP3 Bi-Weekly Meeting Activities at Liverpool 1.Evaluation of Compact DCDC converter Designed to match up to an ABC130 module 2.Status of FIB’d hybrid/module.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
At the HERA collider in Hamburg an experiment (ZEUS) has been built to study electron-proton collisions. For the near future an upgrade of this experiment.
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
Solid State Detectors for Upgraded PHENIX Detector at RHIC.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
SiD EMCal Testbeam Prototype M. Breidenbach for the SiD EMCal and Electronics Subsystems.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
Construction and Status of the Origami Module Prototype C. Irmler, M. Friedl HEPHY Vienna.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
AIDA FEE64 production report January 2011 Manufacturing Power Supply FEE64 revision A “3 hour test” 19th January
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
Status report Pillar-1: Technology. The “Helmholtz-Cube” Vertically Integrated Detector Technology Replace standard sensor with: 3D and edgeless sensors,
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
EDAQ for R3B (and related interfaces) November 2011 Ian Lazarus.
T. Bowcock University of Liverpool
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Hybrid Pixel R&D and Interconnect Technologies
Ladder Assembly All tools and jigs produced Glue dispensing works
Strawman module design
Setup for testing LHCb Inner Tracker Modules
Limited Streamer Tube Project Summary
Presentation transcript:

High energy Ions From this direction Liquid Hydrogen Target Gold Foil surround (Not Shown) 3 Layers of Silicon Vacuum Chamber Calorimeter R3B Si Tracker Layout Optimised for tracking of high-energy protons to select events from QFS reactions e.g. (p,2p), (p,pn)…

Silicon ASICs (12 or 16 per side of each module) Rigid PCBs with flex tail 1 per side of module with Al cooling plate between Feed through connectors. 68 way. 24 Connector with all connections for up to 16 ASICs on one side of Si module. 150 pins per connector: 4 diff pairs for serial data 1 diff pair for TS clock 3 single ended for I 2C 1 wired OR for FT OR 1 diff pairs for Val/gate 1 single ended for reset 4 pins ladder address (3 levels) 8 pins for 2x PT100 1 pin for Si bias voltage/return 64 Ground pins 4 per ASIC 32 Power pins 2 per ASIC (A & D) 24 Extra grounds Buffer board including LVDS buffers, power regulation and signal isolation. The R3B Si tracker comprises 30 double sided modules like the one shown here: Outer layer 12 modules (16+16 ASICs each) Middle layer 12 modules (16+16 ASICs each) Inner layer 6 modules (12+12 ASICs each) Shared Si module support PCB. No active parts, routing only (Probably 1 annular shape PCB handling all 30 modules) Diagram to show how a single Si module (ladder) is connected to the Si support module and feed-throughs. Power connection for ASICs and Si bias (common for all modules)

Si Inner Si Middle Si Out er ASIC 120k strips 912 ASICs Si Inner ASIC Si Middle ASIC Si Out er ASIC x6 x12 FPGA enet FPGA enet FPGA enet FPGA enet FPGA enet FPGA enet Detectors in Vacuum DAQ in Air Slow Control 10G Switch DAQ PC(s) To R3B DAQ 30 uTCA FEE cards + switches and clock card CALIFA Timestamp & coincidence links R3B Si Tracker (NUSTAR) Clk & trig i/f White Rabbit timing FMC i/f FMC i/f FMC i/f FMC i/f FMC i/f FMC i/f 3x uTCA crates

Outer detector assembly (300µm) Inner detector assembly (100µm) Plan to use the same mask set for the green detector of the outer and inner modules to reduce cost. In total 4 different masks are needed. R 3 B Si Tracker Sensors

Silicon sensors Four different geometries (A, B, C, D), and thickness of 300 um (outer ring) and 100 um (inner ring). Number of strips ranges from 876 in D(100) detector to 2048 in C(300) um strips in stereo configuration of p and n side ABC DB 300 um 100 um

Alignment and Bonding Three ABC mechanical pieces (single sided sensors) assembled on a PCB frame. This is being used to perfect the procedure to bond strips together. Adjusting bonding parameters on our sample pieces has allowed us to achieve good wire bonds with sufficiently good pull strengths.

R3B Si Tracker Status - 19 April 2013 Main Highlights: First ASIC prototypes delivered and testing system constructed Tests of ASIC so far show they are functioning Readout tests of 300um prototype Si finished, 100um ongoing Approval given to Micron for production of 300um Si sensors Prototype flex cable received and assembled Assembly procedure of ASICs to Flex trialled Prototype ASICs bonded to flex cable and awaiting bonding Production of prototype Si ladder underway Production of prototype readout underway Final R3B PDRA interviews held at Daresbury yesterday (18 April 2013) Conceptual design for a target mechanism done Mechanical design concentrating on supporting the Si tracker structure and vacuum chamber, insertion and removal, etc. Status will be reported at R3B Collaboration Meeting in GSI in May.

Dave Seddon, Liverpool Si C fibre structure ASIC chips mounted on Flex board Cu cooling blocks Coolant ~-20° C flowing in Cu pipe

Day 3

Day 3 - Section

Prototype R3B Si Tracker Modules  Work underway to determine how to align the sensors to be wire bonded together Hoping to be able to use cut edges of the detectors if good enough quality and relationship with Fiducials marked on Si well established.  Work also underway on Si test assemblies Bonding jigs built to test gluing and wire bonding with ‘mechanical’ Si pieces (300 um so far). Liverpool and Daresbury technicians training in LSDC. Confident that sensors can be wire bonded successfully.  Next steps Wire bonding of ‘real’ R3B Si sensors and readout with VA1TA ASIC test boards (before R3B ASIC PCBs available) planned for end of January Plan to build ‘mock-up’ detector module trial assemblies with 300um glass and glass blank ASIC chips.

£155k (+VAT) For masks and 14 sensors R3B Si Tracker Prototype Sensors 13 (+1) useable R3B Si prototype sensors from Micron since summer All 4 designs (A, B, C, D) and 2 thicknesses (100um and 300 um). All tested in Liverpool LSDC against specifications.

The R3B Si prototypes Goal: to assembly one detector module to test the detector performance as well as the production process. silicon sensors mounting frame PCB ASICs

Alignment and Bonding Three mechanical pieces (single sided sensors) assembled on a PCB frame. This is being used to perfect the procedure to bond strips together. At each corner, use the SmartScope’s feature finder to identify the edges, and find where these lines intersect to define the corner.

Alignment and Bonding Three ABC mechanical pieces (single sided sensors) assembled on a PCB frame. This is being used to perfect the procedure to bond strips together. Adjusting bonding parameters on our sample pieces has allowed us to achieve good wire bonds with sufficiently good pull strengths.

Full Flex PCB completed PT100 ASICs Fit here

All three items viewed from above. The black raised ASIC vacuum pads can just be seen on the vacuum jig underside. 200um spars in laser cut stencil to separate ASICs.

ASIC-Flex Assembly Procedure: I

ASIC-Flex Assembly Procedure: II

ASIC-Flex Assembly Procedure: III Testing of chip assembly can start now

Flex during attachment to copper cooling plate Attached with double sided thermal adhesive coated copper tape

ASIC/Si test box – prototype detector Copper cooling plate(s) fixed to FR4 PCB ready to accept Flex boards. FR4 board waiting for silicon to be fitted and wire bonded.