FVTX Wedge Assembly WBS 1.4.1.3.3 to 1.4.1.3.12 David Winter Columbia University FVTX Wedge Manager.

Slides:



Advertisements
Similar presentations
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
Advertisements

Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
From Research Prototype to Production
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
High Density Interconnect (WBS 1.4.3) Extension Cables (WBS 1.4.4) Douglas Fields University of New Mexico Douglas Fields, FVTX DOE Review November 17,
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
1 DAQ for FVTX detector Implementation Mark Prokop Los Alamos National Laboratory.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
FVTX Review Nov FVTX Review Homeworks. FVTX Review Nov When is Project Complete; how will it be determined?
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
FVTX Review, November 16th, FVTX Mechanical Status : Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 17-Nov-2010.
PMG, June 15, 2000 Slide 1 Schedule Started ! Done Late Done Done(today)
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
03/12/07 Jon S Kapustinsky LANL Jon S Kapustinsky, LANL Forward Vertex Detector Collaboration Meeting UNM, March 12, 2007 Outline: FVTX Overall Description.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
1 W-band Module Production and Other Fermilab Contributions Proposed Significant Partnership in QUIET-II to the Fermilab PAC in November 2009 Modest Fermilab.
Mikhail Kubantsev - Kansas State University 1 Assembly of a Large Area Microstrip Silicon Tracker Some Experience of Construction of D0 SMT H- disk Silicon.
David Lee, FVTX Review Nov Cost and Schedule WBS 1.0 David M. Lee Los Alamos National Lab Deputy Project Leader.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
Ronald Lipton Layer 0 Status PMG Sep Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
FVTX Wedge Assembly WBS , , , , , David Winter Columbia University FVTX Wedge Manager.
1 R&D Advances: SiW Calorimeter LCWS 2010 Beijing SiD Concept Meeting March 28, 2010 John Jaros for SiD SiW Group (thanks to Ray, Ryan, Mani, and Marco.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Cost and Schedule.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
FVTX Electronics (WBS 1.5.2, 1.5.3) Sergey Butsyk University of New Mexico Sergey Butsyk DOE FVTX review
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
FVTX Wedge Assembly WBS to David Winter Columbia University FVTX Wedge Manager.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Douglas Fields, fVTX HDI Technical Review October 23, 2009 High Density Interconnect WBS Douglas Fields University of New Mexico 1.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Status report on the development of a TPC readout system based on the SALTRO-16 chip and some thoughts about the next step Leif Jönsson AIDA Meeting Vienna.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
PACKAGE FABRICATION TECHNOLOGY Submitted By: Prashant singh.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
Radiation Laboratory Meeting
Presentation transcript:

FVTX Wedge Assembly WBS to David Winter Columbia University FVTX Wedge Manager

D. Winter, FVTX Review November Talk Outline Scope –WBS Attach HDI/Backplane –WBS Bond Chips to HDI –WBS Wirebond chips to HDI –WBS Test Chips and HDI –WBS Attach Sensor –WBS Wirebond Sensor to Chips –WBS Test Assembly –WBS Encapsulation –WBS Attach Backplane Mounts Wedge Schedule Status of prototypes, fixtures Procedure and Manpower Summary HDI Detector FPHX Chips Backplane Thermally conductive adhesive Thermally and electrically conductive adhesives ~10 cm

D. Winter, FVTX Review November Scope Work with vendor to: –Prepare assembly lab(s) –Develop assembly procedure Receive backplanes, high-density interconnects (HDIs), sensors –All components arrive tested and qualified –HDIs populated with passive components Assemble received components into wedges Execute QA and testing procedures Enter QA/Test results into database Store assembled units Deliver assembled wedges to detector assembly facility at BNL

D. Winter, FVTX Review November Wedge Schedule Highlights of Dates Important to Assembly 2 nd Prototyping/design of components, fixtures: In progress Procure and Q/A sensors:11/4/094/20/10 Procure HDI: 10/27/092/9/10 Fabrication of backplanes: 12/8/093/29/10 Procure Wedge Assembly fixtures: 11/6/0912/31/09 FNAL testing of production run of FPHX: 12/25/092/4/10 Wedge assembly: 2/2/101/13/11 –WBS Attach HDI to Backplane: 2/2/103/8/10 –WBS Wirebond FPHX to HDI 2/16/107/12/10 –WBS Wirebond sensor to FPHX3/9/1010/14/10 –WBS Encapsulation4/6/1011/11/10 –WBS Attach BP mounts6/8/101/13/11 Endcap assembly (wedges onto disks): 6/22/101/24/11 Important dependencies Critical path components: FPHX, HDI 2 nd prototype, Backplanes Sensor development and production, assembly fixtures

Main Highlights from Last Review Sidet at FNAL was contracted to do prototype assembly –Develop and evaluate procedures and fixtures –Develop Cost & Schedule estimate for production –Assemble prototypes for noise, cosmics, and test beam data Assembly fixtures designed and awaiting fabrication D. Winter, FVTX Review November 20095

Status of Prototype Assembly Sidet has performed prototype assembly –In-line with previous experience, only technical challenge is size of FPHX chips (but they feel comfortable with them now) –Developed procedures –Evaluated assembly fixtures –R&D on adhesives (lamination tests, shapes, procedures) –Assembled prototype units for testing –Finished as of August 2009 Prototypes produced to date (all 26-chip size): –Kapton HDI with sensor + 1 chip –Kapton HDI with sensor + 15 chips –PCB HDI with 1 chip –PCB HDI with sensor + 26 chips –PCB HDI with sensor + 8 chips (x2) –PCB HDI with sensor + 8 chips (with FPHX2) D. Winter, FVTX Review November Used to take test beam data Used to take cosmic ray data

Assembly Fixtures Prototypes delivered to FNAL 12/9/09 –2 Sets; one used extensively, 1 held in reserve Initial evaluation by Sidet very positive –Fit well together –Allowed significant work to take place on procedure development –Enabled prototype modules to be built –Some issues identified (see next slides) D. Winter, FVTX Review November Chip positioning Stackup Sensor positioning

Assembly Fixture Issues and Solutions IssueSolution BP without pedestals can’t be precisely placed Designed BP positioning fixture similar to sensor positioning fixture Scribe lines for chip placement hard to use Glued 160 um wires as chip stops Investigating machined stops Chip spacing too narrow for Kapton HDI design Fixture design changed to match Kapton Acrylic sensor transfer fixture cracked Design changed to use Al D. Winter, FVTX Review November 20098

1.Bond HDI to backplane 2.Bond FPHX readout chips to HDI 3.Wire bond FPHX output pads to HDI 4.Test HDI + FPHXs 5.Bond sensor to HDI 6.Wire bond sensor output pads to FPHX input pads 7.Test assembly 8.Encapsulate wire bonds 9.Final Testing of assembly 10.Pedestal attachment/HDI bending Current Assembly Procedure Additional details –Strips of Arclad 7876 (2 mil) adhesive tape for: Bonding chips to HDI Bonding side edges of sensor to HDI –Ag epoxy in center area of sensor for bias –Encapsulant is Sylgard 186 –Assembly (Sidet) time includes inspection and QA –Traveler documents for each module D. Winter, FVTX Review November RED: performed by FVTX BLACK: performed by Sidet Developed procedure Done manually Work in progress

Assembling the Prototypes sdvln D. Winter, FVTX Review November ChipsSensor(Ready for) Encapsulation

Assembling the Prototypes (2) D. Winter, FVTX Review November Kapton HDI missing bond pad for guard ring Bonded to FPHX pad Kapton and PCB HDIs have different chip spacing Hand-mounted and wirebonded without problem Kapton HDIPCB HDI

Assembling the Prototypes (3) D. Winter, FVTX Review November Distance between vias on left & right led to interference between chips, sensor and vias Thin bead of epoxy to protect vias allowed 26 chips to be placed Chip 1 Chip 12 Chip 13 Some challenges allowed Sidet to demonstrate their technical prowess… Discovered just how easy it is to bump the wirebonds Bonds separated by hand (none broken) Mismatch between FPHX and HDI pads Wirebonded with no trouble

Prototype Results D. Winter, FVTX Review November PCB and 1 Kapton HDIs with chips and sensors, encapsulated 8 chips 26 chips 13+2 chips encapsulant No assembly issues with the prototyping!

Winter FVTX Review November Proposed QA and Testing of Wedge Units Basic Procedure includes: Power up to verify low voltage and bias channels are operational Download of configuration to the FPHX chips Read back of configuration from the FPHX chips Threshold and noise measurements of the FPHX chips Readout of strips in response to external source (for example, LEDs) Record results in database In-line with testing FVTX has done with prototype modules Plan calls for testing at various stages of assembly Test multiple units at once (for example, current ROC can easily read out four wedges at once) Final qualification to be performed after assembly completed and before shipping

Status of Production Estimate Important goal of the prototype SOW was to develop a production (cost and schedule) estimate Estimate produced in Spring/Summer SOW finalized this Fall. In current estimate, production spans ~40 weeks –Primary bottleneck is wirebonding (31.5 weeks) –Testing can take place in parallel –Does not include attaching of pedestals Quoted cost is $248k. Includes: –Labor –Materials and Services –Indirect D. Winter, FVTX Review November

Basis for Schedule Estimates Assumptions Sidet technicians in charge of assembly steps; FVTX personnel for QA testing At least 4 sets of assembly fixtures + enough bases for transport between steps QA System testing done in parallel and keeps up with production Schedule will need to be optimized: Steps are done in series, and more than one step handled by each tech Individual throughput is not the same from step to step Functional balance to be established to prevent techs from being idle waiting for predecessors D. Winter, FVTX Review November StepRate per weekResponsibility HDI to BP100Senior, Junior Tech FPHX Chips to HDI40Senior, Junior Tech Wirebond FPHX- HDI 40-60Tech Specialist, Sr. Technician Sensor to HDI120Senior, Junior Tech Wirebond Sensor- FPHX 20Tech Specialist, Sr. Technician Encapsulate40-50Junior Tech

Illustration of Process Flow Testing done in parallel and throughput can keep up with production Similar case for encapsulation Glue curing can happen overnight and not critical for process flow D. Winter, FVTX Review November Wirebond chip I/O to HDI Wirebond sensor to chip 0.5/Hr WIP Attach chips to HDI Attach sensor to HDI 3/Hr 2/Hr 1/Hr Attach HDI to Backplane 3/Hr 0.3 Hrs 0.5 Hrs 1 Hr 2 Hrs 0.3 Hrs Path 1 Path 2 Two main processes are assembly by Bert and wirebonding by Tammy. Not quite parallel, so flow between them has to be managed to optimize throughput

Projected Manpower Requirements Currently assembly itself calls for Sidet technicians –Steps that are manpower and time-intensive are also require technical skill (chip placement, wirebonding) –Handled by senior and junior techs, with load taken more by junior techs as experience is gained Assembly: Tech Supervisor, Jr/Sr Technician Wirebonding: Tech Specialist, Sr Technician Encapsulation: Trechnician FVTX personnel in charge of wedge testing –Modest rate of 4-8 tested per day (easily reachable) more than keeps pace with production –Will require 1-2 people for span of production time (~30 weeks) –Graduate students and Postdocs available from several institutions to perform on-site testing –Subsystem manager stationed on-site to oversee production D. Winter, FVTX Review November

D. Winter, FVTX Review November Summary: WBS Specification Document TDR, Management plan Prototype status Complete Number of wedges 104 small, 313 large Spares 8 small, 25 large Institutions Involved Columbia, NMSU, UNM, LANL QA procedures in place Done Production schedule: 2/2/10 to 1/13/11 Assembly work completed: Several prototype modules Fixtures prototyped and in process of revision Sidet established that assembly is well within their technical expertise Sidet provided production estimate & SOW now in place

Summary Wedge assembly comprises WBS items – Production schedule: 2/2/10 to 1/13/11 Prototyping assembly work complete –Several prototype modules –Fixtures prototyped and in process of revision –Sidet established that assembly is well within their technical expertise –Sidet provided production estimate Production SOW in place D. Winter, FVTX Review November