Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.

Slides:



Advertisements
Similar presentations
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Advertisements

1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
sTGC for ATLAS Small Wheel upgrade
Status of the ATLAS MM project
ATLAS-NSW CERN MMM workshop assembly of the module (quadruplet)
Status Update on Mechanical Prototype in Rome November 6,
General needs at CERN for special PCB’s Philippe Farthouat CERN.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
QA/QC working group Working group ATLAS NSW - QA/QC working group - J. GIRAUD (20/02/2014)1.
Production of precise large PCB’s Introduction to the problem Achievement in collaborating with industry (Print Electronics in IL and MDT in Italy). Conclusions.
CERN PH/DT 12/05/13 Jordan Degrange / Francisco Perez Gomez CERN PH/DT.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
Large-size micromegas for ATLAS (MAMMA) Status and prospects RD51 mini week, 17/01/2011Joerg Wotschack (CERN)1.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
PCB layout issues PCB alignment and spacing MMM meeting, 22/01/2014G. Sekhniaidze/ J. Wotschack1.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP THERMO-MECHANICAL SIMULATIONS FOR THE MM WEDGES (TDR OPTIONS – SCREWED QUADRUPLETS) of June 2013 Patrick.
PCB issues requirements & procurement MMM Würzburg, 30/01/2014J. Wotschack1.
Atsuhiko Ochi Kobe University 25/06/2013 New Small Wheel MicroMegas Mechanics and layout Workshop.
MM construction organization Some thoughts MMM Saclay, 18/04/2013J. Wotschack1.
Basic concept The NSW chambers are assemblies of Micromegas monolayers, TGC’s and spacer/stiffeners. In order to simplify the assembly procedures we propose.
Situation with industry
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
New results from MMSW Micromegas quadruplet 20/03/2015Michele Bianco RD51 week M. Bianco a, H. Danielsson a, J. Degrange a, R. De Oliveira a, F. Perez.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
News from the lab Large size Micromegas chambers Saclay, April Givi Sekhniaidze / Joerg Wotschack.
PCB procurement WG Status report PCB WG status, 25/03/2014Joerg Wotschack.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
SD-HCAL technological prototype – Chamber and cassette production Nick Lumb Lyon, 3 February 2011.
Large area detectors Aida WP 9.2 RD51 WG6
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
MICROMEGAS CONNECTICS Electronics Boards And Readout Panels 25 JUNE 2013.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
MM detector construction One or several modules per sector considerations.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
M. Bianco On behalf of the ATLAS Collaboration
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
ATLAS micromegas activities (MAMMA)
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
A New GEM Module for a Large Prototype TPC: Status and Plans By Stefano Caiazza On behalf of the FLC DESY.
Resistive protections Rui de Oliveira 09/12/15
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Experience with 1 x 1m 2 and 2 x 1 m 2 MM assembly CERN/PH/DT Hans Danielsson, Francisco Perez Gomez, Philippe Lenoir, Pierre-Ange Giudici, Francois Garnier,
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Micromegas for the ATLAS upgrade (MAMMA) Status report
CERN Rui de OliveiraTS-DEM Rui de Oliveira TS-DEM Large size detectors practical limits based on present knowledge.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Patrick PONSOT for the CEA-Saclay-Irfu group: F.Bauer, P.Daniel-Thomas, E.Ferrer-Ribas, Ch.Flouzat, J.Galan, W.Gamache, A.Giganon, P-F.Giraud, P.Graffin,
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
 Large GEM  CMS RE1-1  Kloe  Ns2 ( No stretch No stress)  Large Micromegas  Atlas MAMA project  Large THGEM  Double phase pure argon project 
Chambers to be installed in ATLAS MSW on Small Wheel MBT0 on front-face of end-cap electromagnetic calorimeter.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
DATABASE ARCHITECTURE PROPOSAL Fabien Jeanneau – 19 jan 2015.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
Update on Pavia MM mechanical prototype
Atlas: Upgrade Phase I Massimo Della Pietra.
News from Saclay F. Bauer, M. Boyer, D. Desforges, E. Ferrer-Ribas, W. Gamache, A. Giganon, P.F. Giraud, P. Graffin, S. Herlant, S. Hervé, F. Jeanneau,
Presentation transcript:

Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1

Evaluation of L3 (2.4 x 1 m 2 )  L3 is the second 2.4 x 1 m 2 prototype that had been built; it differed from L2 by adding three panel interconnections, spaced by 50 cm  L3 suffered (like L2) from gas leaks in the drift panel  Suspect gas leaks through mesh frame screw holes; frames were not glued, screws not sealed (to be avoided in the future)  Gas penetrates into the drift panel  Fixed by sealing the drift panel skins with Araldite glue.  Measurement of mechanical deformations  Effect of gas pressure  Test of panel interconnections MM Gen. Meeting, 06/11/2013 J. Wotschack2 1 m 2.4 m 15 mm 10 mm 5 mm

29/10/20133 Drift panel (without R/O panel)  Mesh tension (≈10 N/cm) produces banana effect  Deformation is ≈1 mm in the centre  Requires W≈ 8/11/8 kg to flatten drift panel (th=15 mm)

Evaluation of L3 (cont’d)  Measurement of mechanical deformations of assembled detector  Observe similar ‘banana’ effect as for drift panel alone  Gas pressure leads to deformation of 500 and 800 µm for 6 mbar overpressure (operating pressure is ≤2 mbar) for drift (15 mm) and r/o panels (10 mm)  Panel interconnects (every ≈50 cm)  Reduces banana effect  Eliminates the gas pressure effect MM Gen. Meeting, 06/11/2013 J. Wotschack4 1 m 2.4 m

29/10/20135 L3 assembled - Drift panel surface Central line Interconnecting screws

29/10/20136 Central line Interconnections L3 assembled – readout panel surface

Conclusions from L3 measurements  Mesh tension creates panel deformation, needs attention  Concept of internal spacers works  Eliminates deformation of panels caused by the gas pressure  Distances between spacers to be optimized  More precise measurements using the laser interferometer will follow shortly  Will try to compensate ‘banana’ effect during the assembly  More results … in the January meeting MM Gen. Meeting, 06/11/2013 J. Wotschack7

The MMSW project  Install a MM detector as similar as possible to the NSW detectors on the present Small Wheel next summer, before ATLAS closes  Detector dimensions: 1.2 x 0.5 m 2 (to fit upper half of large CSC)  Four layers (quadruplet), 2 eta and 2 stereo  Strip pitch mm, 1024 strips/layer  PCB production as close as possible to final production  Panel construction and assembly serve as prototype for Module 0  Readout electronics  ATCA SRS as DAQ system  Front-end boards (SRS compatible) with 8 VMM2 chips/board (back- up: APV25)  Collaborative effort  CERN, Japan, Mainz, Lecce, Napoli, … for detector construction  Bucharest, BNL, Arizona, … for electronics MM Gen. Meeting, 06/11/2013 J. Wotschack8

PCB production  PCB production method as in final production, however, PCBs are smaller in size 1.Etching of readout pattern on PCB (Eltos, Italy); expect boards to arrive next week 2.Production of Kapton foils with resistive strips (Japan); done 3.Glueing of resistive strip foils at CERN 4.Making of pillars at CERN 5.Cutting and drilling at CERN MM Gen. Meeting, 06/11/2013 J. Wotschack9

Panel construction (PH-DT)  Method follows the very successful 50 x 50 cm 2 prototype panel construction (flatness ≤ 20 µm)  Vacuum table & stiffback  Flat surfaces are produced on a marble table  Stiffness is achieved by 60 mm high Al honey-comb core  Vacuum pumping through flat surface  Stiffback of 50 x 50 cm 2 has been produced and tested  Vacuum table follows same principle  Stiffback and vacuum table incorporate positioning pins for PCB alignment MM Gen. Meeting, 06/11/2013 J. Wotschack10

Panel construction tool  Vacuum table + vacuum stiff-back  Positioning pins for PCB alignment incorporated in frames  Flat surfaces produced on marble table; does not require machining of flat surface  Stiffness by thick honeycomb core  Light, but stiff, structure, cheap  Replaces marble MM Gen. Meeting, 06/11/2013 J. Wotschack11 Positioning holes

The 50 x 50 cm 2 prototype MM Gen. Meeting, 06/11/2013 J. Wotschack12 Work by Francisco Perez & Jordan Degrange (PH- DT)

Status of MMSW  Readout PCBs in production, expected to be delivered by mid November  Vacuum table & stiff-back  Parts ordered, construction to start next week  Expected to be completed by 22 November  Panel glueing  Design of mechanical parts and drawings done  Material ordered  Expect glueing to start in last week of November MM Gen. Meeting, 06/11/2013 J. Wotschack13