Waste Update Rail Environment Infrastructure Presentation Thursday 15th August 2013.

Slides:



Advertisements
Similar presentations
Greening Construction
Advertisements

Managing Hazardous Waste India-EU Environment Forum Waste Management in the 21 st Century 12 November 2005 Sarah Paul Senior Policy Adviser Hazardous Waste.
Reducing construction waste through design Dave Marsh Construction Project Manager.
Site Waste Management Plans and the Code
SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR 100% INTEREST FREE ENERGY EFFICIENCY LOANS Interest Free Financing of Public.
Taking Action on Construction Waste South Ayrshire Council.
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Zero Waste Scotland North East Recycling Forum 27 th February 2014 Charlie Devine Head of Resource Management.
Going for Green Compliance 2 October 2014 Claire McNally, Associate Cleaver Fulton Rankin Green Biz 2014.
MF Regulations & Separate Collections Linda Crichton.
Date: 13/06/20071 Sustainable practices relating to decommissioning of concrete structures Presented by Paul Kelly MCIWM Characterisation Land Quality.
Site Waste Management Plans Presentation – September 2009 Planning Agents’ Forum.
End of Waste: Supporting quality & sustainability? Roger Hoare Environment & Business Manager Environment Agency (England & Wales) 24 January 2013.
Use our world to improve yours Total Waste Management - A Strategic Partnership Approach.
Legislation Update May 2011 Mark Stouph Director of Risk Management.
Delivering Crossrail’s Ambitions Terry Morgan CBE FREng Chairman, Crossrail.
QUALITY ASSURANCE: UPDATE & FUTURE DIRECTIONS Anthony McClaran Chief Executive, QAA Wednesday 6 February 2013.
WEEE regulations Update LOUISA HATTON Technical Advisor (Producer Responsibility)
Measuring recycling in the UK Cindy Lee Waste Data Strategy Manager.
UK higher education: quality assurance at home and abroad Carolyn Campbell The Quality Assurance Agency for Higher Education.
The role of Audit Scotland in monitoring police performance Miranda Alcock Portfolio Manager – Public Reporting Group.
Waste measurement & improving performance trainer organisation location date.
A Review of BCC’s Municipal Waste Management Strategy 2006 – 2026.
Construction Category Management Planning Version 1.1 (May 2015)
SAFESPUR FORUM - Challenges in reducing the burden on the UK’s national Low Level Waste Repository 29 April 2009, Birchwood.
Heading TfL Sustainability Approach and Resource management Helen Woolston, TfL Sustainability Coordinator BASE London June 2013.
John Gundling. AGENDA  Eco One Solutions  Offered Services  Environmental Impact  C&D, The Connecticut Example  Achieving Exemplary Performance.
Sustainable Design and Construction Drivers Kate Mills Senior Sustainability Consultant, BRE
Asbestos Legal requirements in Jersey Colin Myers Director of Health and Safety.
Equality Purchase Cycle Produce Spec Evaluate Quotes / Tenders Vendor Selection Issue RFQ/T Requirement to Purchase Negotiate Vendor Paid Place / Award.
Waste Prevention - MSW & C&I Jamie Pitcairn and Simon Stockwell.
California Venue and Event Recycling Legislation Review of AB 2176 Model Ordinance For Waste Reduction at Venues and Events.
Copyright 2010, The World Bank Group. All Rights Reserved. Judiciary Statistics Part 2 Crime, Justice & Security Statistics Produced in Collaboration between.
Odour Code of Practice – An Update Martin Key Presentation to Scottish Noise and Nuisance Conference, 6 October 2006.
TRP Chapter Chapter 3.3 Enforcement. TRP Chapter Enforcement ENFORCEMENT LEGISLATION SUPPORT SERVICES FACILITIES Enforcement is one of the.
East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Environmental Update Vicki Cooper 16 th July 2015.
Corporate slide master With guidelines for corporate presentations The draft Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations.
Site Waste Management Plans & The Waste Framework Directive Angus Evers Partner, Head of Environment Group, SJ Berwin LLP 25 June 2009 – East Anglia Construction.
THE IMPACT OF THE RSR ON RAIL OPERATIONS CHALLENGES ON SAFETY PERFORMANCE AND DATA ANALYSIS MAKGATI C.K.M. IRSC 2008 DENVER, COLORADO. USA.
Construction Commitments: Halving Waste to Landfill Breakfast Briefings October - November 2008.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
Waste Management - The Importance All wastes have the potential to cause environmental damage if not correctly managed The concept of “producer responsibility”
SWWMG: June 2012 LEGISLATION UPDATE: End of Waste regulations, landfill tax, waste exemptions and the government Red tape Challenge.
Construction Commitments: Halving Waste to Landfill Breakfast Briefings October - November 2008.
Legislation Update: The Packaging Regulations, the WEEE Regulations and the Batteries Directive Tessa Bowering Environment Officer (Waste)
An Overview of the Smart Metering Programme in GB.
GDJ Consultancy Ltd Gareth Jones –Director Telephone: Jan Hoskins- Procurement Manager Telephone:
When it Comes to Resources Waste Prevention and everything that will make up a circular economy and a resource efficient world will come first When it.
SWWMG: September 2015 LEGISLATION UPDATE. UPDATES  Hazardous waste  Duty of Care  Fire Prevention Plans.
Recycling for the Future Thursday 24 th November 2011 Steve Lee – CEO Chartered Institution of Wastes Management.
Waste Framework Directive Implementation Alan Holmes Waste framework Directive Implementation Manager NERF 26 May 2011.
WEEE Producer Responsibility in the UK – Best Practice.
FRA34 Framework training and update. Agenda introductions Halving Waste to Landfill update design out waste tools – what's new? coffee break cost benefit.
Waste Management (End of Life Vehicles) Regulations, 2003 What is the current legal situation and how will these Regulations change things Legal Consultants.
Southeast strategic regional coastal monitoring programme Strategic Regional Coastal Monitoring Programme Procurement & Contract Management.
Warwickshire County Council WARWICKSHIRE WASTE CORE STRATEGY: PREFERRED OPTION AND POLICIES CONSULTATION 22 nd September – 18 th November 2011.
The Design Tool for Civil Engineering projects – an overview Phil Birch & Susan Steensma Cyril Sweett
Housing and Planning Act: Private Rented Sector Measures.
Duty of Care: Practical Tips from Engineering Projects
FOOD WASTE IN THE UK Prepared Hi4CSR learning activity
Resource Recovery Yard Compost Facility
Improving Community Safety through procurement practice and process Tim Oakley Head of Consultancy Trusted procurement for better buildings and homes.
What happens if it all goes wrong?
Tracking Progress for Building Efficiency Accelerator
The Disposal of Biological Waste at the University of Sheffield
Supply Chain Challenge
Georgia Update Jeff Cown Land Protection Branch
Experience in the UK in implementing E-PRTR and Data Validation
Presentation transcript:

Waste Update Rail Environment Infrastructure Presentation Thursday 15th August 2013

About me... Waste Management Consultant for over 5 years Worked on a number of rail SWMP’s: Crossrail – Tottenham Court Road, Custom House & Woolwich North East Crossrail Acton Diveunder Western Track Lowering Reading Viaduct LUL Projects Pre demolition audits Operational waste management strategies Project work & secondment to the Environment Agency

Introduction Waste Management Plan for England 2013 edoc Status of devolved government SWMP’s Bad practise Good practise Summary

Waste Management Plan for England 2013 The Waste Management Plan for England is a high level document which is non – site specific. It provides an analysis of the current waste management situation in England, and evaluates how it will support implementation of the objectives and provisions of the revised WFD. The Plan does not introduce new waste management measures

edoc What Will offer an alternative to paper-based system of WTN’s Modernising waste data collection in the UK Enhance ability to extract good quality data Why Storage & accurate data monitoring Who Any UK business involved in waste management When Due to be rolled out from January 2014

SWMPs in England The original red tape challenge concluded that SWMP Regulations should be scrapped The date set for this is October 2013 (shown in a report from September 2012) There was then a consultation to understand what the impacts will be if/when the regulations are removed So...

SWMP in Wales Draft regulations indicate that: No financial limit for requiring SWMP Must be sent to relevant enforcement authority Fees paid – value not yet determined Councils MUST enforce the regulations Subject to outcomes of consultation, SWMP regulations will be laid in 2014 and come into force in 2015

SWMPs in Scotland & Northern Ireland The Scottish Government have committed to a zero waste to landfill target by 2020 The Department of the Environment Northern Ireland (DOENI) consulted on SWMP proposals in 2011 Still no legal requirement to produce a SWMP SWMP a useful management tool to cut costs, reduce fly-tipping and demonstrate your duty of care for waste

Halving Waste To Landfill Commitment launched in 2008 and completed at the end of 2012 Over 800 companies made the commitment to reduce waste Construction and demolition waste was reduced Excavation waste has seen a sharp increase

Bad Practise Not recording Designing out Waste actions Providing data in the wrong format – m or m2 of material Using the wrong LOW/EWC codes Not providing full details of waste carriers or waste management facilities

Waste Crime 11 Waste operators fined for illegal asbestos storage £80,397 Wood recycler fined for storage permit breach £51,500 Prison sentence for illegal waste site owner Suspended eight month prison sentence and 180 hours unpaid work Man fined for illegal waste activities £80,000 Countrystyle fined for waste offences £46,000

Designing Out Waste Focus on the first stage that waste can be reduced Responsibility to reduce waste ultimately lies with the client to set targets and push the design team Considering waste at design stage saves money at least twice over

Design Principles 1. Design for Reuse & Recovery 2. Design for Off-Site Construction 3. Design for Materials Optimisation 4. Design for Waste Efficient Procurement 5. Design for Deconstruction & Flexibility

Good Practise Orient Way - Reuse & Recovery £15 million rail sidings project in East London Layout design enabled a high rate of re-use o 1,000 tonnes of crushed concrete was reused on site o 20,000 tonnes of ballast reused o 3,250 yards of track was reused Award from CEEQUAL for overall recycling rate of 99%

Good Practise Bond Street Monitoring - Waste Efficient Procurement Installation of equipment in and around the station to monitor any ground movement caused by new work at the station Company providing equipment remove long haul packaging and reuse at their depot Packaging taken to site is returned to depot for reuse

Summary Waste Management Plan for England does not introduce new waste management measures " lacking ambition“ edoc – to be used by any UK business involved in waste management from January 2014 to replace paper based WTN’s Status of devolved government SWMP’s – England: requirement to be removed; Wales requirement to be put in place; Scotland and Northern Ireland still no requirement Bad practise Good practise