Improved Design for Reliability Designing Maintenance Out of the System F IND Y OUR H IDDEN P LANT.

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

Database Planning, Design, and Administration
1.Quality-“a characteristic or attribute of something.” As an attribute of an item, quality refers to measurable characteristics— things we are able to.
CONSIDERATIONS REGARDING THE IMPORTANCE OF PROFESSIONAL APPRAISAL OF EMPLOYEES Răducan OPREA Ph.D. in Law, Professor at „Dunărea de Jos” University Galaţi.
Unit I Module 1 - Introduction to RCM
Human Supervisory Control Human-Centered Systems Engineering Design Approaches Massachusetts Institute of Technology.
James Ngeru Industrial and System Engineering
Failure Mode and Effect Analysis
Concepts for Managing DoD Materiel Reliability Dave Robertson.
 Life cycle costing, LCC, is the process of economic analysis to asses the total cost of ownership of a product, including its cost of installation,
1 Achieving Total Systems Management (ATSM) Acquisition Strategies to Increase Reliability and Reduce Logistics Footprint PEO/SYSCOM Workshop November.
The New Software Accounting Rules-GASB 51
Overview Lesson 10,11 - Software Quality Assurance
Managing the Information Technology Resource Jerry N. Luftman
NGEC - SFTF Structure and Finance Task Force Eric Curtit, MODOT Section 6 Project Update.
Systems Engineering Management
TECH 101 Product Design and Manufacturing. TECH 1012 System Life-Cycle Engineering 2 Major phases in almost all products and in many cases services –Acquisition.
ES305: Virtual Tools in Engineering Design: The Eng. Design Process James Carroll, Associate Professor Electrical and Computer Engineering.
Database System Development Lifecycle Transparencies
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
Engineering Systems of.
Reliability Through Maintenance Planning and Scheduling Brad Simpkins MillerCoors Maintenance Process Manager MBAA-Rocky Mountain District Meeting March.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #22.
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
Sustainability and Total Cost of Ownership Strategies for Higher Education.
Chapter 9 Database Planning, Design, and Administration Sungchul Hong.
Database System Development Lifecycle © Pearson Education Limited 1995, 2005.
Introduction to ISO New and modified requirements.
Project Risk and Cost Management. IS the future certain? The future is uncertain, but it is certain that there are two questions will be asked about our.
Chapter 7: The 30 elements of systems engineering
© Copyright QinetiQ Limited Delivering Cost Data to the MoD to Support Business Cases Paul Duvall Deputy Team Manager HVR Practice – Through Life.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
CLEANROOM SOFTWARE ENGINEERING.
CBM + Program Implementation
Unit 8 Syllabus Quality Management : Quality concepts, Software quality assurance, Software Reviews, Formal technical reviews, Statistical Software quality.
ERT 417 WASTE TREATMENT IN BIOPROCESS INDUSTRY W ASTE M INIMIZATION & M ANAGEMENT.
Costing Low Impact Stormwater Devices Éva-Terézia Vesely Michael Krausse André Taylor Earl Shaver Institute for Sustainable Water Resources.
The project VocTrainMaint’s way to to develop a new education and training for the Practical Working Maintenance Technician to be a link in: World Class.
2007 Introduction to System Engineering 1 ECET/CPET 491 Senior Design Project II Intro to System Engineering Reference: System Engineering Management,
David Baglee Dr. David Baglee. School of Computing & Technology E: T: Reliability Centred Maintenance.
© 04/08/20011 Logistics Systems Engineering System Cost Analysis NTU SY-521-N SMU SYS 7340 Dr. Jerrell T. Stracener, SAE Fellow.
Database System Development Lifecycle 1.  Main components of the Infn System  What is Database System Development Life Cycle (DSDLC)  Phases of the.
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
“Integrating Property Management with Emergency Recovery” Ivonne Bachar, CPPM CF Director, Property Management Office Stanford University
Systems Engineering Conceptual System Design. Systems Engineering and Analysis, B.S. Blanchard and W. J. Fabrycky, 3 rd edition, Prentice-Hall, 1998.
Software Engineering Lecture # 1.
DESIGNING FOR COMPREHENSIVE SUPPORT THOMAS L. NONDORF THE BOEING COMPANY Oct. 22, 2003
Reliability Centered Maintenance. Condition Monitoring Reliability Vibration Analysis Oil Analysis Performance Analysis Failure Analysis.
Life Cycle Costing By Rajat Shuvro Bakshi Formerly Professor of Strategic Management and International Business Indian Institute of Foreign Trade, Management.
Offshore Europe September 8-11, 2015 ABS Group Offshore Drilling.
Naval Inventory Control Point 1  Work with all stakeholders early in the PBL formulation process to develop system support strategy  Develop SOW and.
ALI SALMAN1 LECTURE - 05 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
1 Lecture 2.3: SE Process (SEF Ch 3) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Toward a New ATM Software Safety Assessment Methodology dott. Francesca Matarese.
1 ME Spring 2015 Systems Engineering, Part II Session 8 5 February 2015 Mr. Larry Hopp, CPL © Copyright 2013.
ME Summer 2013 Systems Engineering, Part II Session July 2013 Mr. Larry Hopp, CPL.
ME Spring 2015 Systems Engineering, Part II Session March 2015 Mr. Larry Hopp, CPL.
P RESENTATION ON Product development process Product development approaches By Kajal Yadav PRN No Subject- Product Life Cycle Management.
DoD Template for Application of TLCSM and PBL
Supportability Design Considerations
Project life span.
Project Management and Information Security
(Additional materials)
Reliability and Maintenance Management as a Part of Asset Management
SALES: HOW TO USE THIS PRESENTATION
BU IS GIG Chemical, Oil & Gas
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
ENGINEERING ECONOMICS
Project Lifecycle and IT Product Life Cycle
Presentation transcript:

Improved Design for Reliability Designing Maintenance Out of the System F IND Y OUR H IDDEN P LANT

D ESIGN FOR R ELIABILITY IN A CTION

DesignProcuringCommissioningOperatingMaintainingDecommissioningDisposing A SSET L IFE C YCLE

1.Equipment Specifications 2.Performance Clauses 3.Maximize Warranty Coverage DesignProcuringCommissioningOperatingMaintainingDecommissioningDisposing A SSET L IFE C YCLE

S YSTEM D ESIGN & M ANAGEMENT P HASES W HAT IS OUR UNDERSTANDING OF THESE P HASE C OSTS ? Conceptual Design System Planning System Feasibility Analysis Operational Requirements Maintenance Concept Functional Analysis System Specifications Preliminary System Design Identifications of system elements Allocation of Requirements Design synthesis, analysis, and optimization Test and evaluation of engineering and preproduction models Detailed Design and Development Detailed design of prime system elements Detailed design of maintenance and support System integration and test Construction Construction, test, and verification System assessment System modifications for corrective actions System Operation and Support System operation System assessment System upgrades and modifications System decommissioning System disposal

L IFE C YCLE C OSTING Life-cycle costing theory suggests that most of the costs are implicitly determined in the early phases of development despite the fact that the majority of costs of a finished good are generated in later phases such as manufacturing and distribution

L IFE C YCLE C OSTING – D EVELOPING AN U NDERSTANDING * Accumulated Costs Committed Costs Cost Reduction Opportunity Asset System Design & Management Stages Costs Conceptual Design Preliminary System Design Detailed System Design Construc- tion System Operation 10% 66% 85% 95% 100% *Proposed by Benjamin S. Blanchard, Professor Emeritus, Virginia Tech

H OLISTIC D ESIGN = T EAM A PPROACH Design engineers must recognize that the systematic approach to maximize process availability by increasing asset reliability woefully falls short of actual performance in most cases To improve the design process, engineers must include representatives of the operations and maintenance teams on the design team. This action results in Improved Operability Maintainability Costs

T HE A RT OF S YSTEM E NGINEERING D ESIGN & M ANAGEMENT

I MPROVED S YSTEM D ESIGN : M AINTENANCE R EVIEW Conceptual Design System Planning System Feasibility Analysis Operational Requirements Maintenance Concept Functional Analysis System Specifications Preliminary System Design Identifications of system elements Allocation of Requirements Design synthesis, analysis, and optimization Test and evaluation of engineering and preproduction models Detailed Design and Development Detailed design of prime system elements Detailed design of maintenance and support System integration and test Construction Construction, test, and verification System assessment System modifications for corrective actions System Operation and Support System operation System assessment System upgrades and modifications System decommissioning System disposal Maintenance Team Integration Maintainability Testing & Demonstration Maintenance Data Collection, Analysis, & Corrective action Maintainability Prediction Maintenance Task Analysis Maintainability Analysis (RCM) RCM Analysis RCM is too often done after the fact – it should be done up front Note: Maintenance Concept is usually the OEM maintenance requirements. These are often wrong and the reason is simply that most OEMs focus on the functional output requirements and maintenance strategies are an afterthought

R ELIABILITY C ENTERED D ESIGN Q UESTIONS 1.What are the functions and associated performance standards of the asset in its proposed operating context? 2.How could it fail to fulfill its functions? 3.What will cause each functional failure? 4.What will happen when each failure occurs? 5.Why does each failure matter? 6.Can & should the failure mode be designed out? 7.What should be done if a suitable proactive task cannot be found?

L IFE C YCLE C OSTING – H OLISTIC R ESULTS Age Costs Design 1 Design 2 Design 3 Conceptual Design Preliminary System Design Detailed System Design Construc- tion System Operation 10% 66% 85% 95% 100%

B ENEFITS TO P ROCUREMENT & T HE C OMPANY The output of the holistic design process are comprehensive Reliability Centered Engineering Specifications & User Requirement Specifications (URS) based on the actual users – not just the design engineers Procurement is now empowered with precise specifications that includes the information to implement reliability / performance guarantee clauses in the contract: The Specific Performance clause requires a defaulting party to perform the contractual obligations in accordance with the terms of the bargain. While a warranty is a standard clause in an equipment contract, a performance guarantee is not and should be negotiated either as a separate contract or as an integral part of the equipment quotation/contract.

D OCUMENTED LCC E FFORTS RCM was applied later in life to the USS YORKTOWN (CG-48) in 1996 (15 years after launch). Results in 46.7 percent reduction in ship’s force workload without adverse impact on safety, mission, or the environment. DoD Directive requires that a total systems approach be used in acquisition programs to optimize total system performance and minimized the cost of ownership. Ownership costs historically have accounted for 60 to 70 percent of life-cycle costs for weapons systems In 1994, US Navy attack submarines spent 22% of their lifecycle in depot, being repaired or overhauled. In 1998, that percentage was reduced to 17%. Today, attack submarines spend only 12% of their lifecycle constrained to depot which has allowed the US Navy to maintain the same levels of presence and readiness with fewer ships.

CAI: L EADERS IN R ELIABILITY & A SSET M ANAGEMENT S TANDARDS : ISO 55000Asset Management SAE JA1011Evaluation Criteria for RCM SAE JA1012Guide to the RCM Standard C ERTIFICATIONS : CMRP and CMRT (CMRP’s Certified M&R Professionals) Predictive Technologies RCM & RCA Facilitation PMP (Project Management Professional)

CAI – O UR S ERVICES

Global Support for Manufacturing Operations F IND Y OUR H IDDEN P LANT