What is a proper time for pile testing Jaroslaw Rybak, Wroclaw University of Technology.

Slides:



Advertisements
Similar presentations
Pile foundations.
Advertisements

Motion for Constant Acceleration
PILE FOUNDATION.
8. Axial Capacity of Single Piles
DRIVEN PILE SPECIFICATIONS
Pile Capacity Based on Dynamic Methods & Wave Equation Bigman Hutapea-Prodi Teknik Sipil,FTSL-ITB Sebagian besar materi diambil dari materi kursus singkat.
Wave Equation Applications 2011 PDCA Professor Pile Institute Patrick Hannigan GRL Engineers, Inc.
Cracking, Deflections and Ductility Code Provisions and Recent Research October 2006 Serviceability and Ductility The Other Limit States.
Rigid-Frame Structures
PILES  there are two categories of piles according to the method of installation: A. Driven Piles 1.t imber, steel, precast concrete, piles formed by.
Special Design and Construction Considerations
AASHTO LRFD Section and 10
Foundations. Feature common to bridge and building structures Deep vs. shallow Safely transfer dead and live loads with acceptable levels of settlement.
Design of Coal Pillars on Soft Clay Floors ©2012 Dr. B. C. Paul Note – The material presented here relies heavily on notes and support materials compiled.
Pile Testing and Evaluation for the Sand Creek Byway, Sandpoint, Idaho Presented by Dean E. Harris, P.E., CH2M HILL.
SHALLOW FOUNDATIONS Spread footings Mat (Raft) foundations Square
Volumetric Change of Repair Materials Low Shrinkage Materials.
1cs533d-term Notes  Typo in test.rib --- fixed on the web now (PointsPolygon --> PointsPolygons)
Chp-3-Strength Analysis of Beams According to ACI Code
DESIGN AND ANALYSIS OF DEEP FOUNDATION WEEK 9 FRICTION AND END BEARING PILES BEARING CAPACITY ANALYSIS OF PILES USING EMPIRICAL AND DYNAMIC FORMULAE.
Commercial Foundations
Placing Quality Concrete
TOPIC 3: DESIGN AND ANALYSIS OF SHALLOW FOUNDATION WEEK 12 PILE LOAD TEST AND ITS ANALYSIS.
1 Field Approach A Test pile of required dimensions is constructed in the field and a load test is conducted to assess the capacity of the pile. This approach.
Modelling of a motor. Approaches to motor identification Go to the data sheets from the manufacturer and obtain the relevant motor performance characteristics.
RECTILINEAR KINEMATICS: ERRATIC MOTION Today’s Objectives: Students will be able to: 1.Determine position, velocity, and acceleration of a particle using.
RECTILINEAR KINEMATICS: ERRATIC MOTION (Section 12.3) Today’s Objectives: Students will be able to determine position, velocity, and acceleration of a.
RECTILINEAR KINEMATICS: ERRATIC MOTION (Section 12.3)
Chemical Kinetics A Study of the Rates of Reactions.
Additional Design Considerations 2011 PDCA Professor Pile Institute Patrick Hannigan GRL Engineers, Inc.
STRUCTURES Outcome 3 Gary Plimer 2008 MUSSELBURGH GRAMMAR SCHOOL.
1. 2 CE-312 Engineering Geology and Seismology Instructor: Dr Amjad Naseer Lecture#15 Department of Civil Engineering N-W.F.P University of Engineering.
LECTURE 1 - SCOPE, OBJECTIVES AND METHODS OF DISCIPLINE "ECONOMETRICS"
Concrete Maturity Method Reliable Nondestructive Method to Determine in-Place Concrete Strength.
OMAE 2009 Honolulu, HI - May 31 to June
TOPIC 3: DESIGN AND ANALYSIS OF SHALLOW FOUNDATION WEEK 6
Established in 1955 in Dunaújváros Produce m3 of concrete per year.
JRT-2 (v.04) 1 Data analysis An Introduction to Error Analysis The study of uncertainties in physical measurements.
Wave Equation Applications 2009 PDCA Professor Pile Institute Patrick Hannigan GRL Engineers, Inc.
Measurements Measurements and errors : - Here, the goal is to have some understanding of the operation and behavior of electrical test instruments. Also,
Session 19 – 20 PILE FOUNDATIONS
1 Pile Groups Most pile foundations contain group of piles instead of single pileThe supporting capacity of a group of ‘n’similar piles in many cases (not.
RECTILINEAR KINEMATICS: ERRATIC MOTION
Course : S0484/Foundation Engineering Year : 2007 Version : 1/0
S-AIS Performance Analysis J.K.E. Tunaley London Research and Development Corporation, 114 Margaret Anne Drive, Ottawa, Ontario K0A 1L
Latest Developments in Equipment and QA/QC systems in Driven Pile and Drilled Shaft Systems By George Piscsalko, PE Pile Dynamics Inc.
Midwest Geotechnical Conference Implementation of the AASHTO LRFD Geotechnical Strength Limit State for Bearing Resistance of a Single Driven Pile.
The accuracy of averages We learned how to make inference from the sample to the population: Counting the percentages. Here we begin to learn how to make.
PILE FOUNDATIONS UNIT IV.
Topic 4: Basic equation in determining Pile capacity.
Leads Institute of Technology & Engineering Subject Code : Name Of Subject :Building Construction Name of Unit : Soil Foundation Topic : Bearing.
6 DIMENSIONAL APPROACH TO CONSTRUCTION 2nd floor, S&R Building, Soonora Church 1st Cross Road, Elamkulam, Kochi 20, Kerala, India
Pile Foundation Reason for Piles Types of Piles
SOIL MECHANICS AND FOUNDATION ENGINEERING-III (CE 434)
Speed Speed describes how fast an object is moving Speed describes how fast an object is moving If an object is not moving it has no speed If an object.
Settlement prediction for deep foundation piles using artificial neural networks Arshiya ABADKON1*, Muhammed Ernur AKINER1 1Bogazici University, Civil.
MECH 373 Instrumentation and Measurement
47th STGEC – Biloxi, MS – Nov. 10, 2016
Graphical Analysis Of Motion
S S SUBMITTED BY:- CHARU BHARDWAJ civil engineering
Foundations.
DEEP FOUNDATIONS PILES.
Physics 114: Exam 2 Review Material from Weeks 7-11
RCC UNIT-12 Prestressed Concrete
RECTILINEAR KINEMATICS: ERRATIC MOTION
Example on pushover analysis
REVISION 1 1. Foundations.
Measurements Measurements and errors :
Statistical Thinking and Applications
QQ: Brandon’s velocity starts at 0, increases rapidly for the first few seconds, then after reaching 11 m/s remains almost constant. Find his velocity.
Presentation transcript:

What is a proper time for pile testing Jaroslaw Rybak, Wroclaw University of Technology

Contents Main ideas of the work Case studies Driven piles and cast in-situ piles Referring to on-site conditions Static and dynamic capacity testing - Pile setup Integrity testing - Concrete hardening (stress wave velocity) Case studies Capacity testing of driven piles Integrity testing of CFA piles

Control tests of pile load capacity As a rule (in accordance with Polish Code of Practice), load capacity testing usually covers only 1-2% of the contracted piles. The time span, which should be preserved between the end of initial pile driving (EOID) and its capacity testing, is noteworthy. Those time intervals are presented in Chart 14 in the code PN-83/B-02482.

Control tests of pile load capacity Static load testing constitutes the basic pile capacity testing due to local standards (Polish code of practice) and, as follows, contract specifications.

Static load testing takes a lot of time and money …

… but SLT provides us with relevant and important information. ■ PDA ■ SLT

And what if the test goes wrong? Improving of a bored pile capacity is difficult and costly. It is better to know early enough.

Case study 1 -Setup in sand - Pile testing The ultimate pile load capacity increase in time after 8 weeks from EOID is clearly visible (app. 26% in sand). Polish piling standard does not rely on setup effect.

Time dependent increase of pile load capacity Skov and Denver formula (1988), describe the change of the pile load capacity values in time Q/Q0 -1 = A·log10(t/t0) Q – load capacity in time (t) Q0 – the load capacity at the moment of the first test A – the empirical constant t – time elapsed from the moment of the pile installation t0 – the time of the first load capacity test The typically used (for sand) constant A = 0.20 gives the increase of 17% between 5th and 55th day.

Setup in silt - Pile test results In the period starting from the 1st day until the 13th day, the piles numbered 16 to 26 showed an increase of about 59% in the load capacity in silty clay and silt.

Second check of pile load capacity When we substitute A = 0.6 (recommended for silts) in equation Q/Q0 -1 = A·log10(t/t0) Taking into account the period from the first to the 13th day after the pile driving, we calculate a significant load capacity increase, reaching about 67%. From field test results and analysis (CAPWAP) we obtained mean gain of about 59% in the load capacity in silty clay and silt. That proved a relatively good conformity between estimations and test results.

Integrity testing Equipment (SIT, PIT, Impulse response)

Integrity testing For reinforced concrete piles made of the C50 concrete, the elastic wave velocity measured before driving reaches 4500 m/s, and after the driving – it oscillates around 4000 m/s. That is probably connected with the micro-cracking caused when driving the pile. The errors in velocity estimation may lead straight to proportional faults in the estimation of the pile's length (10%). It is even more complicated to determine the wave velocity in the process of the early concrete setting (before the 15th day of concrete embedding). Very few publications on that subject show large changeability of the estimated velocity and suggest that each time at the construction site calibration should take place.

Integrity testing - Concrete hardening Test of 132 piles Elastic wave velocity in function of time c = 2974.1 + 51.1·t [m/s] t [days]

Integrity testing - Concrete hardening Repeated test of 12 piles Average wave velocity in function of time c = 3273 + 32.5·t [m/s] t [days]

Case study 2 c = 4000 [m/s] L=10,25 m (FALSE) c = 3500 [m/s] L=9,02 m (standard) L=10,25 m (FALSE) c = 3500 [m/s] (7th day) L=9,02 m (TRUE)

Thank You for Your Attention