Goldsmith Brothers Insulations Economic Feasibility of Computer Integration in Cost Estimation Process by: Dave Travis Craig Krawiec Aaron Israel Sami.

Slides:



Advertisements
Similar presentations
Systems Analysis and Design in a Changing World
Advertisements

Chapter 2 Analyzing the Business Case.
Preparing the Systems Proposal CIS458. Last Class Project outline –Documents and reports Database Application Lifecycle –Database planning, system definition,
Systems Analysis & IT Project Management Pepper. System Life Cycle BirthDeathDevelopmentProduction.
The System Development Life Cycle
Acquiring Information Systems and Applications
Chapter 2.
Contemporary Engineering Economics, 4 th edition, © 2007 Methods of Describing Project Risk Lecture No. 46 Chapter 12 Contemporary Engineering Economics.
Professor Michael J. Losacco CIS 1150 – Introduction to Computer Information Systems Systems Analysis and Design Chapter 12.
The Analyst as a Project Manager
8 Systems Analysis and Design in a Changing World, Fifth Edition.
Introduction to Systems Analysis and Design
The Click Company. Overview Analyze advertising & sales rep data in 40 randomly selected territories Influence that sales rep and advertising has on annual.
VENDORS, CONSULTANTS AND USERS
Enterprise Content Management (ECM) Simulator for Return on Investment (ROI)
Acquiring Information Systems and Applications
Acquiring Information Systems and Applications
Library Automation: Planning and Implementation
Supply Management Chapter 7.
AASHTO Subcommittee on Construction 2010 Annual Meeting Summary of C&T Section Work Plan Surveys August 16–20, 2010 Summary of C&T Section Work Plan Surveys.
Moving into Design SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED. 1 Roberta M. Roth.
Systems Development Lifecycle Project Identification & Selection Project Initiation & Planning Analysis Logical Design Physical Design Implementation Maintenance.
Quick Recap Monitoring and Controlling. 2 Control Project Cost.
Systems Analysis – ITEC 3155 Feasibility Analysis
System Development Process Prof. Sujata Rao. 2Overview Systems development life cycle (SDLC) – Provides overall framework for managing system development.
Chapter 14 Information System Development
Computers Are Your Future © 2006 Prentice Hall, Inc.
SYSTEMSDESIGNANALYSIS 1 Chapter 3 Feasibility Jerry Post Copyright © 1997.
2  Mission Statement.  Company’s overall purpose and direction, products, services and values.  Goals.  That accomplish the mission. E.g. 5 year plan.
Section 28.1 Marketing Information Systems
Acquiring Information Systems and Applications
Systems Analysis and Design
Computers Are Your Future © 2008 Prentice Hall, Inc.
CHAPTER 13 Acquiring Information Systems and Applications.
BEST GROUP CONSULTANTS Lesson Department Information System.
© 2010 IBM Corporation 1 day contest for TUKE students Finance and Planning Center Bratislava.
MIE Class #12 Manufacturing & Engineering Economics Concerns and Questions Concerns and Questions Quick Review Quick Review Today’s Focus: Today’s.
9. Applying scientific tools & techniques for improving customer satisfaction.
Introduction The following chapter will review: –Overview –Model assumptions –The Cost Proposal & Evaluation –Payments methodology –Financial Incentives/Disincentives.
Feasibility Study.
Chapter 4 Marketing Research and Information Systems Dr. Franck VIGNERON.
By Muhammad Shahid Iqbal Module No. 08 Present Worth Method of Comparison Engineering Economics.
CHAPTER 13 Acquiring Information Systems and Applications.
Slide 1 Systems Analysis and Design with UML Version 2.0 An Object-Oriented Approach, Second Edition Chapter 3: Project Initiation.
The System Development Life Cycle
Mobile application and website to buy and sell books
Light Touch Calculator Growth that doesn’t cost the earth Emma Hutchinson This webinar is designed to introduce you to the Resource Efficient Scotland.
Information Systems Development
Methods of Describing Project Risk
Systems Analysis and Design in a Changing World, Fifth Edition
IS Development Methodology
Factors to consider System component costs Methods
Fort Stanwix National Monument Energy Audit Contract
Systems Analysis and Design in a Changing World, 4th Edition
Design Control What Will Be Covered
Introduction to System Analysis and Design
(Additional materials)
Systems Analysis – ITEC 3155 Evaluating Alternatives for Requirements, Environment, and Implementation.
Pricing and Related Decisions
VENDORS, CONSULTANTS AND USERS
BIS 221 Education for Service-- snaptutorial.com.
BIS 221 Teaching Effectively- snaptutorial.com
BIS 221 Education for Service-- tutorialrank.com
Information Systems Development
The System Development Life Cycle
Systems analysis and design, 6th edition Dennis, wixom, and roth
Systems analysis and design, 6th edition Dennis, wixom, and roth
Design Control What Will Be Covered
By Muhammad Shahid Iqbal
Presentation transcript:

Goldsmith Brothers Insulations Economic Feasibility of Computer Integration in Cost Estimation Process by: Dave Travis Craig Krawiec Aaron Israel Sami Shamma Cesar Brea

company overview GBI is a Mechanical Insulation Company which bids competitively for contracts in the New Jersey and Pennsylvania area ïBidding a maximum number of jobs is essential to GBIís survival

Project description ïthe objective of the project is to analyze the economic feasibility of investing in computers to reduce the time of an estimation job at GBI

the current scenario ïwhen a potential customer requests a cost estimation for a certain service the workers at GBI currently spend too much time on paper work and hand calculations ïcurrent process is very inefficient and costly

economic assumptions ïGBI will continue to be awarded approximately $ 1.4 million in contracts per year from in house bids ïThe % of time savings per job is directly related to an increase in total revenue ïEach job yields approximately 5% profit ïA computerís useful life is 6 years

general approach ïfirst take measurements over current estimation procedure, and collect data on time to conduct an estimation job ïthen we evaluate the results of implementing our proposed investment, and compute Money-Time measures to determine the feasibility and savings

data collection ïa time study (IE tool) was conducted over the complete estimation process of one job ïone worker observed while performing estimation of a single job until completion ïbreakdown of process into work elements for detailed view ïcalculations and results

time study results for current method ïWork Elements: ( min.) 1- open and review package => Take measurements from prints => Calculations a) total footage => 5.5 b) summary => 15.6 c) calculate bid price =>31.8 d) define scope of bid=> 3.6 ïTotal Estimation Job Time: => 205.9

ïDuration of element 3b is 15.6 min (8% of total time) ïDuration of element 3c is 31.8 min (15% of total time)

our investment suggestion ïwe recommend the integration of computers that will minimize the job estimation time ïthrough the use of computers GBI will be able to eliminate work elements 3b) and 3c) with an estimated addition of 5 min of data input ïTime savings (min):15.64 (summary) (closing up) (data input) ïNet savings per job: 42.4 min (20.6% reduction)

various money-time measures - Investment: $7,399 - MARR: 6%(fixed) - Increased Productivity: $13,240/yr- Salvage value: $ Useful life: 6 years alternative: buy 1 pc

required gross revenue at various marrís (1 pc)

required gross revenue at various marrís (1 laptop & 1 computer)

implementation of investment proposal An Excel Database for the desired application was developed by the group members to start the implementation of our proposal at GBI The databaseís main function is to do calculations such as total footages and reference material costs (based on two dimension parameters) Time to train workers estimated to be 8 hrs. Annual cost for data storage and maintenance estimated to be: $ 759.5

problems encountered -Finding information on software that would fit our purposes (do desired calculations) -Small Business: profit target and desired MARR hard to define

conclusions -The current bidding process at GBI is very time consuming -Through a systematic economic analysis of GBIís cost estimations, we were able to quantify inefficiencies of the current bidding process, and evaluate the feasibility of investing in computers to improve the current procedure -GBI should invest in computers and will be able to cut the time to do estimations significantly (and thus increase its profits)

- As engineers we can measure the performance of a given process, and develop ways to improve it - Engineering economics skills are very important tools in making the right decisions that will result in higher profits for the company the end