Cost Control. Do project managers control costs, monitor costs or both?

Slides:



Advertisements
Similar presentations
©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Advertisements

Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
1 SW Project Management (Planning & Tracking) Dr. Atef Z Ghalwash Faculty of Computers & Information Helwan University.
Monitoring and Information Systems
Copyright , Dennis J. Frailey CSE7315 – Software Project Management CSE7315 M30 - Version 9.01 SMU CSE 7315 Planning and Managing a Software Project.
International Campus – Kish Sharif University of Technology Session#12.
Project Cost Management Estimation Budget Cost Control
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
Monitoring and Control Earned Value Management (EVM)
Project Management Cost Control
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Section 4.0 Project Implementation. Factors that Ensure Success  Update the project plan  Stay within scope  Authorized change implementation  Providing.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Earned Value Management
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Advanced Project Management Project Cost Management Ghazala Amin.
Chapter 10 Project Monitoring and Control
Cost Management Week 6-7 Learning Objectives
Project Management 6e..
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
9-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 9 Progress and Performance.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Monitoring and Control. Monitoring – collecting, recording, and reporting information concerning project performance that project manger and others.
Project Management Methodology Project monitoring and control.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 13: Progress and Performance Measurement and Evaluation
© SYBEX Inc All Rights Reserved. Session 10 Project Control.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Chapter 15 Cost Control.
Software Project Management (SPM)
Management & Development of Complex Projects Course Code - 706
EARNED VALUE MANAGEMENT (EVM)
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
Project Scheduling 1. Why Are Projects Late? An unrealistic deadline established by someone outside the software development group Changing customer requirements.
Felix Sanchez Estimating the Budget and Cost (Part 1) Project Management for ARA Engineers and Scientists Developing a Bottoms Up Estimate.
Project Cost Management
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Project Management Methodology
Chapter 14 Pricing and Estimating. Pricing and Estimating Many managers regard pricing as an art ! Many managers regard pricing as an art ! Information.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
Project Management 6e..
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 10 Projects.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Earned Value Analysis Tracking Project Progress. Introduction | Components | Project Scenario | Values | Calculations | Forecasts | Summary l What Is.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
Where Module 04 : Knowing Where the Project Is 1.
Project Management Information System What?? Objective: –Record & report relevant information and status of various components of project –Highlight the.
Copyright 2015 John Wiley & Sons, Inc. Chapter 10 Monitoring and Information Systems.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
TOPIC-8B- PROJECT COST CONTROL
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Copyright All Rights Reserved by
Progress and Performance Measurement and Evaluation
Earned Value - What is it
Earned Value Management
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
Project Management Life Cycle
Managing Project Work, Scope, Schedules, and Cost
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Presentation transcript:

Cost Control

Do project managers control costs, monitor costs or both?

Cost Management v Cost estimating v Cost accounting v Project cash flow v Company cash flow v Direct labor costing v Overhead rate costing v Others, such as incentives, penalties, and profit-sharing v Cost estimating v Cost accounting v Project cash flow v Company cash flow v Direct labor costing v Overhead rate costing v Others, such as incentives, penalties, and profit-sharing

Cost And Control System PLANNING WORK AUTHORIZATION AND RELEASE DATA COLLECTION AND REPORTING COST ACCOUNTING CUSTOMER AND MANAGEMENT REPORTING PHASE IPHASE IIPHASE IIIPHASE IV PHASE V OPERATING CYCLE CYCLE PLANNING

Cost Control Requirements v Measure resources consumed v Measure status and accomplishments v Compare measurements to projections and standards v Provide the basis for diagnosis and re- planning v Measure resources consumed v Measure status and accomplishments v Compare measurements to projections and standards v Provide the basis for diagnosis and re- planning

Cost Control Requirements v Thorough planning of the work to be performed to complete the project v Good estimating of time, labor, and costs v Clear communication of the scope of required tasks v A disciplined budget and authorizations of expenditures v Timely accounting of physical progress and cost expenditures v Periodic re-estimation of time and cost to complete remaining work v Thorough planning of the work to be performed to complete the project v Good estimating of time, labor, and costs v Clear communication of the scope of required tasks v A disciplined budget and authorizations of expenditures v Timely accounting of physical progress and cost expenditures v Periodic re-estimation of time and cost to complete remaining work

Cost Control Requirements (Continued) v Frequent, periodic comparison of actual progress and expenditures to schedules and budgets, both at the time of comparison and at project completion

WHEN TO IMPLEMENT A COST MANAGEMENT SYSTEM CONCLUSION A cost management system should be implemented right at the beginning of the life cycle of the project. CONCLUSION A cost management system should be implemented right at the beginning of the life cycle of the project. Possible cost reductions Cost of change PROJECT COSTS PROJECT LIFE CYCLE PHASES

Partitioning The Budget

The Work Authorization Form

Work Authorization Form Description Cost Work Work Centers Hours Cost Starts Ends - Test Material R Aug 15 Sept - Processing R Final inspection R Packaging R Delivery 2624 R 350 Project office authorization signature:________________ WBS: Work order no: D1385 Date of original release: 03 Feb 97 Date of revision: 18 March 97 Revision number: C

PLANNING AND BUDGETING Work packages WBS Element MGRMGR Org Work Package WP______ORG_______ Description of task_____ ____________________ Sched: Start____Stop__ Budget:______________

CACN No. _____________ Revision to Cost Account No. ____________ Date ___________ DESCRIPTION OF CHANGE: ____________________________________________________________________________________ REASON FOR CHANGE: ____________________________________________________________________________________ __________________________________________________________________________________ Requested Budget Authorized Budget Labor Hours _________________ _________________ Period of performance Materials _________________ _________________ From _____________ ODCS _________________ _________________ To _____________ BUDGET SOURCE: Funded Contract Change Management Reserve Undistributed Budget Other _________________ INITIATED BY: ____________________________ APPROVALS: Program Mgr. ________ Prog. Control ________ COST ACCOUNT CHANGE NOTICE (CACN)

Sources Of Additional Funding v Funded contract change v Management reserve v Undistributed budget v Other (e.g. profits) v Funded contract change v Management reserve v Undistributed budget v Other (e.g. profits)

Cost data collation and reporting flow chart Actuals Labor ACWP Inventory Accounts BCWP Computer BCWS Monthly Total Program Effort Weekly Labor Reports MCCS C omparison reports To All Execs Variance Report

Cost Data v Labor v Material v Other direct charges v Overhead v Labor v Material v Other direct charges v Overhead

Types of Budgets v Distributed budget v Management budget v Undistributed budget v Contract changes v Distributed budget v Management budget v Undistributed budget v Contract changes

Variance Analyses

VARIABLES FOR VARIANCE ANALYSIS v BUDGETED COST FOR WORKED SCHEDULED (BCWS) IS THE BUDGETED AMOUNT OF COST FOR WORD SCHEDULED TO BE ACCOMPLISHED PLUS THE AMOUNT OF LEVEL OF EFFORT OR APPORTIONED EFFORT SCHEDULED TO BE ACCOMPLISHED IN A GIVEN TIME PERIOD. v BUDGETED COST FOR WORK PERFORMED (BCWP) IS THE BUDGETED AMOUNT OF COST FOR COMPLETED WORD, PLUS BUDGETED FOR LEVEL OF EFFORT OR APPORTIONED EFFORT ACTIVITY COMPLETED WITHIN A GIVEN TIME PERIOD. THIS IS SOMETIMES REFERRED TO AS AN “EARNED VALUE.” v ACTUAL COST FOR WORK PERFORMED (ACWP) IS THE AMOUNT REPORTED AS ACTUALLY EXPENDED IN COMPLETING THE WORK ACCOMPLISHED WITHIN A GIVEN TIME PERIOD. v COST VARIANCE = BCWP – ACWP v SCHEDULE/PERFORMANCE VARIANCE = BCWP - BCWS v BUDGETED COST FOR WORKED SCHEDULED (BCWS) IS THE BUDGETED AMOUNT OF COST FOR WORD SCHEDULED TO BE ACCOMPLISHED PLUS THE AMOUNT OF LEVEL OF EFFORT OR APPORTIONED EFFORT SCHEDULED TO BE ACCOMPLISHED IN A GIVEN TIME PERIOD. v BUDGETED COST FOR WORK PERFORMED (BCWP) IS THE BUDGETED AMOUNT OF COST FOR COMPLETED WORD, PLUS BUDGETED FOR LEVEL OF EFFORT OR APPORTIONED EFFORT ACTIVITY COMPLETED WITHIN A GIVEN TIME PERIOD. THIS IS SOMETIMES REFERRED TO AS AN “EARNED VALUE.” v ACTUAL COST FOR WORK PERFORMED (ACWP) IS THE AMOUNT REPORTED AS ACTUALLY EXPENDED IN COMPLETING THE WORK ACCOMPLISHED WITHIN A GIVEN TIME PERIOD. v COST VARIANCE = BCWP – ACWP v SCHEDULE/PERFORMANCE VARIANCE = BCWP - BCWS

Variances v The cost variance compares deviations only from the budget and does not provide a measure of comparison between work scheduled and work accomplished. v The scheduling variance provides a comparison between planned and actual performance but does not include costs. v The cost variance compares deviations only from the budget and does not provide a measure of comparison between work scheduled and work accomplished. v The scheduling variance provides a comparison between planned and actual performance but does not include costs.

Measurements v Measurable efforts: discrete increments of work with a definable schedule for accomplishment, whose completion produces tangible results. v Level of effort: work that does not lend itself to subdivision into discrete scheduled increments of work, such as project support and project control. v Measurable efforts: discrete increments of work with a definable schedule for accomplishment, whose completion produces tangible results. v Level of effort: work that does not lend itself to subdivision into discrete scheduled increments of work, such as project support and project control.

COST VARIANCE CALCULATION A NEGATIVE VARIANCE INDICATES A COST OVERRUN CV = BCWP - ACWP

SCHEDULE VARIANCE CALCULATION SV = BCWP - BCWS A NEGATIVE VARIANCE INDICATES A BEHIND SCHEDULE CONDITION

VARIANCE PERCENTS SCHEDULE VARIANCE % = (SVP) COST VARIANCE % = (CVP) SV BCWS X 100 CV BCWP X 100

Project Variance Analysis R&DQUALIFICATIONDEVELOPMENT PHASE IPHASE IIPHASE III VARIANCE LOWER BOUNDARY ACTUAL COST VARIANCE PROJECTED COST VARIANCE UPPER BOUNDARY TIME $

Trend Analyses

Management Reserve CONTRACTED COST RELEASED BUDGET ACTUAL COST TIME MANAGEMENT RESERVE $

Information Requirements v Budgeted cost for work scheduled (BCWS) v Budgeted cost for work performed (BCWP) v Actual cost for work performed (ACWP) v Estimated cost at completion v Budgeted cost at completion v Cost and schedule variances/explanations v Traceability v Budgeted cost for work scheduled (BCWS) v Budgeted cost for work performed (BCWP) v Actual cost for work performed (ACWP) v Estimated cost at completion v Budgeted cost at completion v Cost and schedule variances/explanations v Traceability

Variance Analysis Questions v What is the problem causing the variance? v What is the impact on time, cost, and performance? v What is the impact on other efforts, if any? v What corrective action is planned or under way? v What are the expected results of the corrective action? v What is the problem causing the variance? v What is the impact on time, cost, and performance? v What is the impact on other efforts, if any? v What corrective action is planned or under way? v What are the expected results of the corrective action?

VARIANCE REPORTING Variance reporting is accomplished at each reporting interval. However, the variance threshold reports are exception reports and occur only when the variances exceed the upper and lower boundaries of the project variances envelope.

REPORTING INTERVALS v Depends on the type of organization and characteristics of the projects. v Project-driven organization - weekly. v Non-project-driven organization - monthly v Depends on the type of organization and characteristics of the projects. v Project-driven organization - weekly. v Non-project-driven organization - monthly

Cost Account Variance Analysis Report Cost account no/cam WBS/Description Cost performance dataVariance Reporting level As of At completion Budget EAC Var. BCWS BCWP ACWP SCHED COST Month to date ($) Contract to date ($k) Problem cause and impact Corrective action (including expected recovery date) Cost account Date Cost center Date WBS element Date Date Mgr. Mgr. Mgr.

The 50/50 rule HALF OF THE BUDGET FOR EACH ELEMENT IS RECORDED AT THE TIME THAT THE WORK IS SCHEDULED TO BEGIN AND THE OTHER HALF AT THE TIME THE WORK IS SCHEDULED TO BE COMPLETED. FOR A PROJECT WITH A LARGE NUMBER OF ELEMENTS THE AMOUNT OF DISTORTION FROM SUCH A PROCEDURE IS MINIMAL.

J F M A M J J A S O N D ANALYSIS Budgeted cost for work Scheduled (BCWS) Performed (BCWP) Budget Work packages Cost account budget = 100 (thousands) BCWS = 38 BCWP = 49 SCHED. VARIANCE = rule used for work in process

Using The Rule 4,000 10,000 12,000 4,000 6,000 10,000 TIME TIME LINE COMPLETED NOT COMPLETED LEGEND BCWS = 34,000 BCWP = 33,000 BAC = 52,000

Earned Value Status Reporting SV CV BCWS BCWP ACWP TIME LINE CUMMULATIVE COST, $ TIME

Estimated Cost At Completion

ESTIMATE AT COMPLETION (EAC) EAC = ACWP BCWP X Budget at completion The estimate at completion is the best estimate of the total cost at the completion of the project. The EAC is a periodic evaluation of the status of the project - usually on a monthly basis or until a significant change has been identified. (BAC)

PROGRESS REPORTING Progress reporting needs to answer four fundamental questions: 1. Where are we today (time and cost)? 2. Where will we end up (time and cost)? 3. What are the present and future risks? 4. Are there any special problems that need to be addressed and what can management do to help? Progress reporting needs to answer four fundamental questions: 1. Where are we today (time and cost)? 2. Where will we end up (time and cost)? 3. What are the present and future risks? 4. Are there any special problems that need to be addressed and what can management do to help?

Monthly Project Report 1. VARIANCE ANALYSIS (Cost in Thousands) 1 June 1997 Budgeted Budgeted Cost Milestone Cost Work Work Actual Variance, % Subtask Status Scheduled Performed Cost Schedule Cost 1 Completed Completed Completed Not Started Completed Not started Started Not started Total Monthly Project Report 1. VARIANCE ANALYSIS (Cost in Thousands) 1 June 1997 Budgeted Budgeted Cost Milestone Cost Work Work Actual Variance, % Subtask Status Scheduled Performed Cost Schedule Cost 1 Completed Completed Completed Not Started Completed Not started Started Not started Total

2. ESTIMATE AT COMPLETION (EAC) EAC = (360/340) X 579,000 = $613,059 Overrun = 613, ,000 = $34, COST SUMMARY Costs are running approximately 5.9% over budget due to higher salaried labor. 4. SCHEDULE SUMMARY The 24.4% behind schedule condition is due to subtasks 4 and 6 which have not yet begun due to lack of raw materials and the 50/50 method for booking costs. Overtime will get us back on schedule but at an additional cost of 2.5% of direct labor costs. 2. ESTIMATE AT COMPLETION (EAC) EAC = (360/340) X 579,000 = $613,059 Overrun = 613, ,000 = $34, COST SUMMARY Costs are running approximately 5.9% over budget due to higher salaried labor. 4. SCHEDULE SUMMARY The 24.4% behind schedule condition is due to subtasks 4 and 6 which have not yet begun due to lack of raw materials and the 50/50 method for booking costs. Overtime will get us back on schedule but at an additional cost of 2.5% of direct labor costs.

5. MILESTONE REPORT Milestone/ Scheduled Projected Actual Subtask Completion Completion Completion 1 4/1/97 4/1/97 2 5/1/97 5/1/97 3 5/1/97 4/23/97 4 7/1/97 7/1/97 5 6/1/97 6/1/97 6 8/1/97 8/1/97 7 9/1/97 9/1/ /1/97 10/1/97 5. MILESTONE REPORT Milestone/ Scheduled Projected Actual Subtask Completion Completion Completion 1 4/1/97 4/1/97 2 5/1/97 5/1/97 3 5/1/97 4/23/97 4 7/1/97 7/1/97 5 6/1/97 6/1/97 6 8/1/97 8/1/97 7 9/1/97 9/1/ /1/97 10/1/97

6. ACTIVITY REPORT Current Potential Corrective Problem Impact Action (a) Lack of raw Cost overruns and Overtime is scheduled. materials. behind schedule We will try to use lower condition. salaried staff. Raw materials are expected to be on dock next week. (b) Customer un- May need add- Customer will provide happy with test itional planning. us with revised statement results. of work on 6/15/ ACTIVITY REPORT Current Potential Corrective Problem Impact Action (a) Lack of raw Cost overruns and Overtime is scheduled. materials. behind schedule We will try to use lower condition. salaried staff. Raw materials are expected to be on dock next week. (b) Customer un- May need add- Customer will provide happy with test itional planning. us with revised statement results. of work on 6/15/97.

Status Reporting Is More Than Just A Computer Printout.

Intranet Status Reporting

Reporting Favorable Status

Reporting Unfavorable Status

DATA ACCUMULATION WBS Organization BCWS BCWP ACWP Budget SCHED VAR COST VAR

Cutting The Budget

Financial Close-Out

Cost Problems v Poor estimating techniques and/or standards, resulting in unrealistic budgets v Out-of-sequence starting and completion of activities and events v Inadequate work breakdown structure v No management policy on reporting and control practices v Poor work definition at the lower levels of the organization v Poor estimating techniques and/or standards, resulting in unrealistic budgets v Out-of-sequence starting and completion of activities and events v Inadequate work breakdown structure v No management policy on reporting and control practices v Poor work definition at the lower levels of the organization

Cost Problems (Continued) v Management reducing budgets or bids to be competitive or to eliminate “fat” v Inadequate formal planning that results in unnoticed, or often uncontrolled, increases in scope of effort v Poor comparison of actual and planned costs v Comparison of actual and planned costs at the wrong level of management v Unforeseen technical problems v Management reducing budgets or bids to be competitive or to eliminate “fat” v Inadequate formal planning that results in unnoticed, or often uncontrolled, increases in scope of effort v Poor comparison of actual and planned costs v Comparison of actual and planned costs at the wrong level of management v Unforeseen technical problems

Cost Problems (Continued) v Schedule delays that require overtime or idle time costing v Material escalation factors that are unrealistic v Schedule delays that require overtime or idle time costing v Material escalation factors that are unrealistic

Problem Areas in Cost Control v Organization: - Inadequate Work Breakdown Structure - Poor work definition at working levels - Lack of formal system procedures v Planning and budgeting: - Inadequate forward planning - Over-allocation of budget - Poor integration of budget, schedule, work authorization v Accounting: - Inability to account for cost of material on applied basis v Analysis: - Determination of status not based on work package completion - Comparison of actual vs. planned costs at improper level v Revisions: - Failure to maintain valid measurement baseline v Organization: - Inadequate Work Breakdown Structure - Poor work definition at working levels - Lack of formal system procedures v Planning and budgeting: - Inadequate forward planning - Over-allocation of budget - Poor integration of budget, schedule, work authorization v Accounting: - Inability to account for cost of material on applied basis v Analysis: - Determination of status not based on work package completion - Comparison of actual vs. planned costs at improper level v Revisions: - Failure to maintain valid measurement baseline

Cost Problems Per Phase v Proposal Phase –Failure to understand customer requirements –Unrealistic appraisal of in-house capabilities –Underestimating time requirements v Proposal Phase –Failure to understand customer requirements –Unrealistic appraisal of in-house capabilities –Underestimating time requirements

Cost Problems Per Phase v Planning phase –Omissions –Inaccuracy of the work breakdown structure –Misinterpretation of information –Use of wrong estimating techniques –Failure to identify and concentrate on major cost elements –Failure to assess and provide for risks v Planning phase –Omissions –Inaccuracy of the work breakdown structure –Misinterpretation of information –Use of wrong estimating techniques –Failure to identify and concentrate on major cost elements –Failure to assess and provide for risks

Cost Problems Per Phase v Negotiation phase –Forcing a speedy compromise –Procurement ceiling costs –Negotiation team that must “win this one” v Negotiation phase –Forcing a speedy compromise –Procurement ceiling costs –Negotiation team that must “win this one”

Cost Problems Per Phase v Contractual phase –Contractual discrepancies –SOW different from RFP requirements –Proposal team different from project team v Contractual phase –Contractual discrepancies –SOW different from RFP requirements –Proposal team different from project team

Cost Problems Per Phase v Design phase –Accepting customer requests without management approval –Problems in customer communications channels and data items –Problems in design review meetings v Design phase –Accepting customer requests without management approval –Problems in customer communications channels and data items –Problems in design review meetings

Cost Problems Per Phase v Production phase –Excessive material costs –Specifications that are not acceptable –Manufacturing and engineering disagreement v Production phase –Excessive material costs –Specifications that are not acceptable –Manufacturing and engineering disagreement