Pigging.

Slides:



Advertisements
Similar presentations
Manufacturing Processes Lab I, MET 1321 Inspection and Testing Welds
Advertisements

CHAPTER 45 Engine Lubrication.
3.4.5 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Pumps, Strainers and Bypass Systems Knowing how to maintain.
General System Maintenance BUS 4 COMPONENT FLOW.PPT
Essential reading: SPINČIĆ, A., PRITCHARD, B, An English Textbook For Marine Engineers 2, Pomorski fakultet, Rijeka LUZER, J., SPINČIĆ, A., Gramatička.
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
Morgan City Rentals Diesel Jet Pump 6 x 6 Peerless Safe Operating Practices and Procedures.
Refrigeration Flow Control
Potential Pathways for Coliform Contamination. Fixing Positive Coliform Results.
Student Book © 2004 Propane Education & Research CouncilPage Installing Vapor Meters Vapor meters are precision measuring devices that.
Simple Pressure Control Valves
4-1 Chapter 4 Overview b The DCM is very complex Mechanical, electrical, hydraulic and safety systems all work together Mechanical, electrical, hydraulic.
3.4.6 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Compressors Knowledge of the processes involved in maintaining.
Pigs Unlimited, Inc. Introduces….
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
Compressors CM4120 Julie King.
HVACR312 - Refrigeration Metering Devices.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only Publisher The Goodheart-Willcox Co., Inc. Tinley Park, Illinois.
Filling, purging and air removal
F LOTEC Training Presentation for Authorized Repair Centers This presentation is designed to supplement M-Service Manual InGage Regulator.doc Flotec, Inc.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
© Goodheart-Willcox Co., Inc.  Cooling system diagnosis  Cooling system problems  Thermostat service  Cooling system hose service  Radiator and.
KANON LIQUID HANDLING Suite 4, Brookside House Business Centre, Spring Road, Ibstock, Leics. LE67 6LR Tel : Fax :
Gas Transmission Pipelines
Unit 205: Cold water systems
Efficient Pigging of Gathering Lines
Electromagnetic Flowmeter Why use flow meters What is a magnetic flow meter – How do they work – How are the different from other meters Items that will.
Flow Sensors.
2.5.6 Student Book © 2004 Propane Education & Research CouncilPage Operating a Propane Dispenser to Fill Vehicle-Mounted ASME Tanks To safely and.
CONTROL VALVE - THEORY & SIZING
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
STEAM HEATING.
Hydronic Mechanical Controls
3P Services, Germany Basil Hostage
Steps towards low-risk pipeline inspection Alberto Di Lullo Flow Assurance Engineering Technologies Manager.
CHAPTER 4 CPB 20004: Plant Utility n Maintenance
INTRODUCTION Definition:
Gasoline fuel supply systems Function: store, transport, Pressurize and filter gasoline going to carburetor or fuel injection system.
EVAPORATIVE EMISSION CONTROL SYSTEMS
PROCESS PIGGING. 2 Process – Pigging In this course you will learn: The functions of pigging Terminology The different types of pigs In-line inspection.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Safety Talk 9 / 1 Safety Talk 9 Safe Operation of Fired Heaters: start-up.
TRENTON Casing Filler Presentation
SPE A novel fully plastic caliper pig for low-risk pipeline inspection Design, Characterization and Field Test A. Di Lullo, A. Tasso, eni M. Cocuzza,
WORKSHOP PRACTICE SAFETY VALVE.
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
What tests are necessary to make sure your kegs are being cleaned, sanitized and filled correctly By Andrew J. Brewer
ISX12 G & ISL G Cold Weather Operation 1. ISX12 G and ISL G Cold Weather Operation  Cold weather affects CEGR SI natural gas engines differently compared.
SAL COLLEGE OF ENGINEERING AHMEDABAD LIQUID LEVEL MEASUREMENT
FLUID FLOW FOR CHEMICAL ENGINEERING Dr Mohd Azmier Ahmad Tel: +60 (4) EKC 212 CHAPTER 8 (PART 2) TRANSPORTATION SYSTEM.
Hydraulic System Components
Fluid Mechanics for Chemical Engineers Arif Hussain (Lecturer)
Valves.
Temperature Test Allows monitoring of temperature changes.
Automotive Heating And Air Conditioning
GROUND SERVICING OF VARIOUS SUB SYSTEMS
Sensors and Detectors - 1
14 Refrigerant Recovery, Recycling, and Recharging.
Automotive Engines Theory and Servicing
INDUSTRIAL HYDRAULICS
OBJECTIVES State the principles of vacuum and the vacuum booster theory. Discuss how a vacuum brake booster operates. Discuss the vacuum booster operation.
EVAPORATIVE EMISSION CONTROL SYSTEMS
OBJECTIVES Describe the operation of a pressure-differential switch and a brake fluid level sensor switch. Describe the operation of a residual check valve.
Fuel Supply System Service
CHAPTER 45 Engine Lubrication.
Fuel Supply System Chapter 21 Lesson 1.
TRENTON Casing Filler Presentation
NEW COMPLIANCE REGULATIONS
Gas Transmission Pipelines
Presentation transcript:

Pigging

What is a Pig? A pig is defined as: A device that moves through the inside of a pipeline for the purpose of cleaning, dimensioning, or inspecting.

Why Pig in a Pipeline? 1- Construction and commissioning . 2- In service (Cleaning & Sealing). 3- Routine pigging for corrosion and metal loss inspection

1- Construction and commissioning: After the pipeline is built, it will be necessary to run pigs to : 1- Remove any debris left in the line from new construction; items such as lunch boxes, tools, welding rods, dead animals trapped in the line, etc. 2- Verify the ovality of the pipeline by the owner

Cleaning pigs:

2- In service: When the pipeline is in service : 1- Remove accumulated water in product pipelines 2- Remove any water that has accumulated in the low spots of the pipeline and reduce corrosion. 3- Separate products in pipelines that handle multiple products such as various grades of gasoline, heating oils, and jet fuels

Gel Pig: May be used for certain cleaning conditions There are four main types of gel that are used in pipeline applications: • Batching, or separator gel • Debris pickup gel • Hydrocarbon gel • Dehydrating gel

Spherical Pigs or spheres:

3- Routine pigging for corrosion and metal loss inspection: Before Inspection pigging: 1- Pre-Inspection pigging before running an ILI (In Line Inspection) tool will not only require the pipe be clean but a dummy pig be run to assure the ILI tool will go through the line. 2- Under certain conditions pipelines may require chemical cleaning or a train of gel pigs may be used for certain cleaning conditions. During Inspection: 1-Insert Intelligent Inspection Pig at certain point and follow him and receive it at certain point, for inspect metal loss and corrosion .

Profile Pig: A profile pig is a gauging pig with multiple gauging plates, usually three plates. One plate is mounted on the front, one in the middle, and one on the rear of the pig. It is normally used before running an ILI (In Line Inspection) tool to assure the tool's passage around bends and through the pipeline.

Inspection Pig:

Inspection Pig

Introduction How it works:    Instrumented Pig is a device for inline inspection of buried pipelines to monitor their health and assess the risk associated with their operation. How it works: » Instrumented pig travels with the propelling force of the fluid being pumped through the pipeline. While traveling inside the pipeline the onboard data recording systems record the defect data. The data is retrieved and interpreted after receiving the pig at the receiving pump station. » The data on external and internal defects is reported with fairly good accuracy with respect to defects sizing and location. » On the basis of this data the pipeline operator can take appropriate corrective measures depending upon the severity of the defects.

Principle of operation of Intelligent PIG: » Instrumented pig works on the principle of Magnetic Flux Leakage (MFL) and detect the mechanical defects by sensing the change in flux near the pipe wall under the influence of applied magnetic field. » The change in magnetic flux signal depends upon the extent and type of metal loss, changes in material and its magnetic properties.

Typical Pig Launching& Receiving Sequences

Launcher & Receiver

Typical Pig Launching Procedures: 1-Make sure that the isolation valve and the kicker valve are closed. 2-In liquid systems, open the drain valve and allow air to displace the liquid by opening the vent valve. In natural gas systems, open the vent and vent the launcher to atmospheric pressure. 3-When the pig launcher is completely drained (0 psi), with the vent and drain valves still open, open the trap (closure) door. 4-Install the pig with the nose firmly in contact with the reducer between the barrel and the nominal bore section of the launcher. 5-Clean the closure seal and other sealing surfaces, lubricate if necessary, and close and secure the closure door. 6-Close the drain valve. Slowly fill the trap by gradually opening the kicker valve and venting through the vent valve. 7-When filling is complete, close the vent valve to allow pressure to equalize across the isolation valve. 8-Open the isolation valve. The pig is ready for launching. 9-Partially close the main line valve. This will increase the flow through the kicker valve and behind the pig. Continue to close the main line valve until the pig leaves the trap into the main line as indicated by the pig signaler. 10-After the pig leaves the trap and enters the main line, fully open the main line valve. Close the isolation valve and the kicker valve. 11-The pig launching is complete.

Typical Pig Receiving Procedures: Make sure the receiver is pressurized. Fully open the bypass valve. Fully open the isolation valve and partially close the main line valve. Monitor the pig signaler for pig arrival. Close the isolation valve and bypass valve. Open the drain valve and the vent valve. Check the pressure gauge on the receiver to assure the trap is depressurized (0 psi). Open the trap closure and remove the pig from the receiver. Clean the closure seal and other sealing surfaces, lubricate if necessary, and close and secure the trap (closure) door. Return the receiver to the original condition.

Pig Launching - Clockwise to Close Step 1 Open position. Through conduit flow - no pockets to trap wax or debris. Step 2 Close valve. Upstream and downstream is sealed off. Vent body cavity pressure. Step 3 Remove entry plug. Insert pig into valve ball cavity.

Step 4 Screw entry plug into place. Close vent valve. Step 5 Open valve. Flow line pressure moves the pig downstream.

Pig Receiving - Clockwise to Close Step 1 Open position. Through conduit flow - stopper in valve cavity arrests pig. Step 2 Close valve. Upstream and downstream is sealed off. Vent body cavity pressure. Step 3 Remove entry plug. Remove pig from valve ball cavity.

Methods used in Intelligent Inspection Pig Magnetic Flux Leakage Ultrasonic Eddy Current

Principle of MFL Detection MFL test device obtains the magnitude of the defects by measuring the magnetic density leaked from the surface of the ferromagnetic material, shown in Figure 1. If the components to be measured are glossy and defective less and inclusive, all magnetic flux will pass through the components, seen from figure 1(a). But, as can be seen in figure 1(b), there are flaws in the parts, the relativity near the flaw increases. And this makes the magnetic flux aberrance. So the magnetic flux can be divided into three parts. First, most of the magnetic flux would pass through the detected components, making a detour from the defects. Second, a little part of the flux would transit the lacunas. And then, some flux would puncture surface of the components, detouring the lacunas. Hall sensor or mobile induced coils could detect the third part of the flux. Power or weakness of the flux signal has an intensive relation to the condition of the pipe surveyed

Pig Passage Detectors

Troubleshooting Pig Increase the flow rate and line pressure, but do not exceed safe limits of the pipeline.    Remove pressure from the line and vent or drain toward the launcher. Removing pressure allows the pig to relax to its original shape and may cause it to back up in the pipeline. Allow pres-sure to dissipate. After 15-30 minutes, re-pressure the line in an attempt to drive the pig through the restriction. Repeat two to three times.    Run a soft swab up behind the stuck pig to try to attain a positive seal. Repeat step 1 above.    Consider ways to back the pig out of the line, returning it to the pig launcher. This requires pressuring from the opposite end of the pipeline.    In a potable water line when pigging with a foam pig, super chlorinate (3000 to 5000 ppm) in a slug form to dissolve the pig.