Mar. 9 2005RHIC Planning Meeting Tuesday (Mar. 1) 12pm - Sun (Mar. 6) 8pm: 128 hours Data Taking time: 39.5 hours = ~84% Beam time with collisions (including.

Slides:



Advertisements
Similar presentations
AGS Status and Plans RHIC Spin Collaboration Meeting 2/4/11.
Advertisements

Photon-Jet Correlations at RHIC Saskia Mioduszewski Texas A&M University 18 July, 2007.
APEX Report April 28-29, 2009 May 4, 2009 Fulvia Pilat Time Meeting, May
STAR 62 GeV CuCu Event totals (as of 3/16/05, noon ) Total: Mevts of BBC Narrow Goal > 20 Mevts. BBC Narrow Trigger has been operational for 6 full.
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
1 Measurement of the single transverse- spin asymmetry of forward neutrons in p-p collisions at RHIC-PHENIX Manabu Togawa for the PHENIX collaboration.
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
Ultra Peripheral Collisions at RHIC Coherent Coupling Coherent Coupling to both nuclei: photon~Z 2, Pomeron~A 4/3 Small transverse momentum p t ~ 2h 
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Sourav Tarafdar Banaras Hindu University For the PHENIX Collaboration Hard Probes 2012 Measurement of electrons from Heavy Quarks at PHENIX.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
Photon-Jet Correlations at RHIC Saskia Mioduszewski Texas A&M University 19 June, 2007.
PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam.
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 5 April 2011 Time Meeting, BNL.
Experimental background at the presence of pressure rise in RHIC Angelika Drees, Ubaldo Iriso-Ariz RHIC How to measure collision rates Vacuum and collision.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 8 March 2011 Time Meeting, BNL.
Machine - Experiments January 12, 2005 Machine status.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
PHENIX Local Polarimeter PSTP 2007 at BNL September 11, 2007 Yuji Goto (RIKEN/RBRC)
1 SSA in BRAHMS J.H. Lee (BNL) for BRAHMS Collaboration Preliminary Results on ,K,p Transverse Single Spin Asymmetries  at 200 GeV and 62 GeV  at high-x.
October 14, 2004 Single Spin Asymmetries 1 Single Spin Asymmetries for charged pions. Overview  One physics slide  What is measured, kinematic variables.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
Run15 pp Achievement and pAu status Itaru Nakagawa RIKEN/RBRC.
General Status of STAR pp run as of June 1, pb -1 delivered ~1.78 pb -1 sampled 292 nb -1 delivered ~ 93 nb -1 sampled (93/180 ~ 52%) N.B
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Systematic measurement of light vector mesons at RHIC-PHNEIX Yoshihide Nakamiya Hiroshima University, Japan (for the PHENIX Collaboration) Quark Matter.
Incident-energy and system-size dependence of directed flow Gang Wang (UCLA) for STAR Collaboration  Introduction to directed flow  Detectors: ZDC-SMD,
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Luminosity of the Super-Tau-Charm Factory with Crab Waist D. Shatilov BINP, Novosibirsk TAU’08 Workshop, Satellite Meeting “On the Need for a Super-Tau-Charm.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
Particle Production of Carbon Target with 20Tto2T5m Configuration at 6.75 GeV (Updated) X. Ding, UCLA Target Studies April 3, /3/14.
The RICH Detectors of the LHCb Experiment Carmelo D’Ambrosio (CERN) on behalf of the LHCb RICH Collaboration LHCb RICH1 and RICH2 The photon detector:
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
APEX RUN-14 APEX Schedule April 1, :00am Store Elens commissioning Gu, Fischer, Luo, Simon 10:00am 4:30pm2:00pm AC dipole setup Bai Momentum Aperture.
Luminosity Monitoring Issues  ZDC  what’s the advantage?  problems  BBC  can they do it? A. Drees QCD critical point workshop, Mar
Robert Pak (BNL) 2012 RHIC & AGS Annual Users' Meeting 0 Energy Ro Robert Pak for PHENIX Collaboration.
STAR pp Run Summary Carl Gagliardi March 11, 2008.
Gamma-Jet Analysis in Heavy-Ion Collisions Saskia Mioduszewski for the High-p T Working Group.
RHIC CNI Polarimeter status RHIC CNI Group February 26, 2008.
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
October 22, 2004 Single Spin Asymmetries at RHIC 1 F.Videbaek Physics Department, Brookhaven National.
Measurement of Azimuthal Anisotropy for High p T Charged Hadrons at RHIC-PHENIX The azimuthal anisotropy of particle production in non-central collisions.
90 Vertical Horizontal Oblique line a b Angles a + b = 180 o Angles at a Point b = 115 o Angle a = 180 – 115 = 65 o.
Inclusive cross section and single transverse-spin asymmetry of very forward neutron production at PHENIX Spin2012 in Dubna September 17 th, 2012 Yuji.
Systematic measurement of light vector mesons at RHIC-PHNEIX Yoshihide Nakamiya Hiroshima University, Japan (for the PHENIX Collaboration) Quark Matter.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
Centrality, N part & N collision at BRAHMS H. Ito University of Kansas For the BRAHMS Collaboration.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 19 April 2011 Time Meeting, BNL.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
Run 16 plan based on 20 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015 Today, 1 March 19 Jan, Begin.
Run 16 RHIC Machine/Experiments Meeting March 1, 2016 Agenda: Run 16 Power use/cost (Christie) Short presentation by PHENIX (Denis Jouan) AOB READYTALK.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Transverse Spin Physics at PHENIX
Kazuya Aoki For the PHENIX Collaborations. Kyoto Univ. / RIKEN
Main Design Parameters RHIC Magnets for MEIC Ion Collider Ring
Presentation transcript:

Mar RHIC Planning Meeting Tuesday (Mar. 1) 12pm - Sun (Mar. 6) 8pm: 128 hours Data Taking time: 39.5 hours = ~84% Beam time with collisions (including short stores): 47.3 hours Angle Scan ZDC/sec in BRAHMS

Mar RHIC Planning Meeting Crossing-Angle Scan: (half store: Sun 10am – 1pm) Yellow Horizontal + (ZDC~15% increase) ZDC Background

Mar RHIC Planning Meeting Crossing Angle Scan (data taken at the maximum allowed angles) YellowBlue Horizontal mrad0.37 mrad Horizontal mrad0.7 mrad Vertical mrad0.15 mrad Vertical -0.6 mrad0.65 mrad Blue Beam

Mar RHIC Planning Meeting

Mar RHIC Planning Meeting

Mar RHIC Planning Meeting BRAHMS Cu+Cu Status CuCu at 200 GeV Data Summary - ~1.75 nb -1 Cu+Cu 200 GeV recorded (Jan. 16 th - Mar. 8 th ) - 56M MRS 103M FFS Triggers collected - ~75% of the Goal Achieved - Data taken for the All angle/field settings planned Physics - Identified Charged hadron yields in 0< y <3.8 - High-pt Physics at y~1,2,3 - Crossing-Angle scan for SMD done 62 GeV - ZDC HV changed (+700V: same as AuAu 62 GeV settings) - Spectrometer Triggers modified - Identified Particle Yields in 0<y<3 - High-pt Physics at y~1